ML20096C855
| ML20096C855 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 04/30/1992 |
| From: | David Jones, Sieber J DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9205150015 | |
| Download: ML20096C855 (9) | |
Text
s
,a 4 --
s J,
n 31(5 M
t e...<.,, w, m una a=..,,,.v-
..i r# e,riaxa mn May 8, 1992 Beaver Valley Pcuer Station Unit 1 - Docket 11o. 50-334, License llo. DPR-66 Unit 2 - Docket llo. 50-412, License No. NPF-73 Monthly Operatirrt Report;.
U. S. Nuclear Regulatory Commission Docunent Control Desk Washirgton, D.C.
20555 Gentlemen:
In accortlance with Appendix A,
'Ibchnical Specifications, the Monthly Operating Report is subnitted for Unit 1 and Unit 2 for the month of April, 1992.
Very truly yours, n
i
'. D. Sieber
( ice President Nuclear Group DTJ/ning Enclosures cc: imC Regional Office Kiry of Prussia, PA 920430 ti 920SiggO 05000334 t!
I PDR PDR R
i i
ta1UMTIVE Suf%RY OF IMIl{LY OPD%TDJG LNPDUD4CE UNIT 1 APRIL 1992 April 1 he Unit op2ratcd at a narnimi value of 100% output, through April 12 April 13 At 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> the Unit commenced load reduction to *,ess than 30%
output to repair tube leaks in the Unit's main oordenser.
April 14 At 1315 hours0.0152 days <br />0.365 hours <br />0.00217 weeks <br />5.003575e-4 months <br /> the Unit bogan escalation to a nctniml value of 100% output.
April 15-he Unit continued Ixuer ascension to 100% output until 0450 hours0.00521 days <br />0.125 hours <br />7.440476e-4 weeks <br />1.71225e-4 months <br /> then power reduction to approximtely 70% output comnenced.
W e power reduction was initiated due to the rod position indication for control rod 11-2 found indicating greater than the Technical Specification 3.1.3.1 limit of i
12 ctcpo.
Following calibration of the signal conditioning l
mcdule for control rod 11-2 rod position indication, power escalation to a nmdml value of 100% output comacnced at 1130 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.29965e-4 months <br />. t o Unit achieved 100% output at 1930 hours0.0223 days <br />0.536 hours <br />0.00319 weeks <br />7.34365e-4 months <br />.
April 16 to Unit operated at a raninal value of 100% output.
'through April 30
.,.. ~
3m
(;.
AVERAGE DAILY WIT POWER UVEL DCOTT 110, 50-314 WIT BVPS 1.hlit 1 DATE _. thy 4. 1992 CCIWiETED BY _DayjsLT. Jones TELEPHotIE _J412) 393-761L
., s 5
~
1992 i
rMY
.BAGE DA1LY RMER LEVEL DAY AVERAGE DAILY POWER LINEL (MWo-Het)
(!Ne-Net) 1 317 17 817 D
2
_,,321 18 813 il e
'4 821.
19 811 4
817_
20 808 5
822 21 808 6
821 22 821 9
7
_ _L'} _
23 821 8
B l~f 24 817 2
9 613 25 821 s
1 10 821 26 821 g
11
_804 27 8 21_,,
12 813 28 8 17 a
13 267 29 813 14 324 30 813 15 721_ _
16 808 INSIRUCTIOtis On this fomat, list the average daily unit power level IMe-Net for each day in the reporting month. C w ptte to the nearest whole megawatt.
_ = - _ _ _ - _ - -
i OPERATING DATA REPORT DOCKET NO.,
50 334 REPORT DATE:
05/05/92 COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393 7612 CPEPmATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD:-APRIL 1992
- 3. LICENSED THERMAL PGWER (MWt):
2652 4 NAhEPLATE RATING (Cross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CHANGES OCCUR IN_ CAPACITY RATINGS SINCE LAST REPORT. GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (Not MWe):
None
-10. REASONS FOR RESTRICTIONS. IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
719.0 2903.0 140255.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
'719.0 2903.0 88226.6
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0,0 0.0 4482.8
.14. HOURS GENERATOR'VAS ON LINE:
719.0 2903.0 86334.2
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.n
- 16. CROSS THERMAL ENERGY GEN. (MWH):
1821532.0 7596923.0 20G109095.s
- 17. GROSS ELECT, ENERGY CEN. (MWH):
593870,0 2501250.0 66299653.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
559280.0 2362510.0 61930060.0 19.-UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 63.6 20 UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 63,6
- 22. UNIT CAPACITY FACTOR (DER): PCT 93.2 97.5 55.5
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 16.3
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TfPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, T'rIMATED DATE JF STARrUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERi ' ION N/A N /A
7, L
UNI'T' SHUTDOWNS AND Pt4ER REDUCTIONS (220%)-
Locket No.
50-334 Unit Name' BVPS Unit #1 Date
_Mey 4 1992 Completed By Onvid T.' Jones REPORT MONTH APRIL 1992 Telephena (412) 393-7612 i
f Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.
Date Typel_
(Hours).
Retson2 Down Reactor 3 Report #
. Code 4 Code 5 Prevent Recurrence 1
1920413 F
0 8
5 N/A HC HTEXCH Unit reduced output from 100% to approximately 30% to repair tube lesks in the Unit's main condenser; s
2 920415 F:
0 B
5' N/A.
IF.
INSTRO Unit reduced output to approx. 70%-
to re-calibrate controt red H-2 position indicator.
t i
1 2
3 4
F-Forced Reason:
Method:
Exhibit F~
itructions for S-Scheduled A-Equipment Failure.(Explain) 1-Manual Preparar of Data Entry Sheets 8-MaintenarMe or Test 2-Manual Scram for Lic-
,ee Event Report (LER) File C-Refueling 3-Automatic Scram (NUREG0161).
D-Regulatory Restriction 4-Cont 'd. f r om Prev ious Mor.th E-Operator Training & License Exam 5-Reduction 5
F-Administrative 9-Other Exhibit H-Same Source.
G-Operational Error (Explain)
H-Other (Explain) i I
i t
u -
i NARRATIVE SG8%RY OF MotmLY. OPEPATING EXPDUFNCE l# TIT 2 APRIL 1992
. April 1 The Unit remined shutdcun in Mode 6 for the Unit's third throtqh refueling outage.
-. April 19 April 20 The Unit entered Mode 5 at 2350 hours0.0272 days <br />0.653 hours <br />0.00389 weeks <br />8.94175e-4 months <br />.
' April 21 The Unit renained in Mode 5 for the remirx3er of the report
-through
- period.
- April 30 e
P pe w
w-r gg s
s
AVERAGE DAILY UNIT I%TR LEVEL DOCKET 10.
50-412 UNIT BVPS Unit 2 DATE May 4, 1992 T14PLEITD BY David T. Jo:.ec, TELEPHONE (412) 393-7612
!Olini April 1992 DAY AVEPME DAILY EGTR LEVEL DAY AVERIGE DAILY KMER LEVEL (MWe-Net)
(IHe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 L
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
23 0
13 0
29 0
14 0
30 0
15 0
i 16 0
INS 1FIA"I' IONS On this format, list tue average daily unit power level IEe-Net for each day in the reporting month. Campute to the nearest whole r:ogawatt.
. ~.
OPEPATING DATA REPORT DOCKET NO..
50-412 REPORT DATE:
05/05/92 COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393 7612 OPEPATING SI611LS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: APRIL 1992
- 3. LICENSED THERMAL POWER (MWt):
2652 4 NAMEPLATE-RATING (Gross MWe):
923 5.. DESIGN ELECTRICAL RATING (Net MWe):
836 6l MAX. DEPENDABLE CAPACITY (Grcss MWe):
870
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
820
- 3. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WilICll RESTRICTED, IF ANT (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS IF ANY:
N/A THIS MONTH YEAR TO DATE CUMVLATIVE
- 11. HOURS IN REPORTING PERIOD:
719.0 2903.0 39038,0
- 12. NO. OF HRS.. REACTOR WAS CRITICAL:
0.0 1751.1
'.32831,3
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.C 0.0 14 HOURS GENERATOR JAS ON LINE:
0,0 1750.7 32632.7
- 15. UNIT-RESERVE SHUTDOW HOURS:
0.0 0.0 0.0
- 16. CROSS THEPJ4AL ENEGY GEN, (MWH):
0.0.
4176762.0 79536509.4
- 17. GROSS ELECT. - Et,ERGY GEN. (hWH):
0.0 1346432,0 25521013.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
.-2808.0 1268399.0 24073884.0
- 19. UNIT SERVICE FACTOR; (PERCENT) 0.0 60.3 83.6
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 60.3 83.6
- 22. UNIT CAPACITY FACTOR (DER): PCT 0.0 52,3 73,8
- 23. UNIT FORCED OUTAGE RA*iE: (PERCENT) 0.0 0.0 3.7
- 24. SHOTD0k.. SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE.AND DURATION OF EACH):
THE UNIT'S THIQ REFURLING OUTAGE IS CURRENTLY IN PROGRESS.
25; IF SHUT DCVN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
5/23/92-
- 26. UNITS.'IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A _
COMMERCIAL OPERATION N/A N/A
UNIT SHUTDOWNS.AhD POWER REDUCTIONS (120%)
. E ocket No.
'50-412
~
Unit Name' BVPS Molt #2 i
Date
_May 4 lf92 Completed By.
David T.
ipnes REPORT MONTH MARCH 1992 Telephone (412) 393-?612 Method of Licensee Cause & Corrective,
.Luration Shutting Event lystem Component Action to
'No.
Date-Typel
,(Hours)-
Reason 2 Down Reactor 3 Report #
Code 4 Code 5 Prevent Recurrence 10 920401 LS 719.0 C
4 W/A' 7
FUELXX Unit remained shutdown for tte third refueling outage.
T i
[
1 2
3 4
F-Forced Reason:
Method:
Exhibit F-Instructions for S-Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets B-Maintenance or Test 2-Manual Scrse for Licensee Event Report (LER) File C-Ref uet ing -
3-Automatic sur$m (NUREG0161).
D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exim 5-Reduction 5
F-Administrative 9-Other Exhibit H-Same Source.
G-Operational Error (Explain)
H-Other (Explain) i r
e