Monthly Operating Repts for Apr 1992 for Beaver Valley Power Station,Units 1 & 2
ML20096C855
Person / Time
Site: Beaver Valley
Issue date: 04/30/1992
From: David Jones, Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9205150015
Download: ML20096C855 (9)


Text

s

,a 4 --

s J,

n 31(5 M

t e...<.,, w, m una a=..,,,.v-

..i r# e,riaxa mn May 8, 1992 Beaver Valley Pcuer Station Unit 1 - Docket 11o. 50-334, License llo. DPR-66 Unit 2 - Docket llo. 50-412, License No. NPF-73 Monthly Operatirrt Report;.

U. S. Nuclear Regulatory Commission Docunent Control Desk Washirgton, D.C.

20555 Gentlemen:

In accortlance with Appendix A,

'Ibchnical Specifications, the Monthly Operating Report is subnitted for Unit 1 and Unit 2 for the month of April, 1992.

Very truly yours, n

i

'. D. Sieber

( ice President Nuclear Group DTJ/ning Enclosures cc: imC Regional Office Kiry of Prussia, PA 920430 ti 920SiggO 05000334 t!

I PDR PDR R

i i

ta1UMTIVE Suf%RY OF IMIl{LY OPD%TDJG LNPDUD4CE UNIT 1 APRIL 1992 April 1 he Unit op2ratcd at a narnimi value of 100% output, through April 12 April 13 At 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> the Unit commenced load reduction to *,ess than 30%

output to repair tube leaks in the Unit's main oordenser.

April 14 At 1315 hours0.0152 days <br />0.365 hours <br />0.00217 weeks <br />5.003575e-4 months <br /> the Unit bogan escalation to a nctniml value of 100% output.

April 15-he Unit continued Ixuer ascension to 100% output until 0450 hours0.00521 days <br />0.125 hours <br />7.440476e-4 weeks <br />1.71225e-4 months <br /> then power reduction to approximtely 70% output comnenced.

W e power reduction was initiated due to the rod position indication for control rod 11-2 found indicating greater than the Technical Specification 3.1.3.1 limit of i

12 ctcpo.

Following calibration of the signal conditioning l

mcdule for control rod 11-2 rod position indication, power escalation to a nmdml value of 100% output comacnced at 1130 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.29965e-4 months <br />. t o Unit achieved 100% output at 1930 hours0.0223 days <br />0.536 hours <br />0.00319 weeks <br />7.34365e-4 months <br />.

April 16 to Unit operated at a raninal value of 100% output.

'through April 30

.,.. ~

3m

(;.

AVERAGE DAILY WIT POWER UVEL DCOTT 110, 50-314 WIT BVPS 1.hlit 1 DATE _. thy 4. 1992 CCIWiETED BY _DayjsLT. Jones TELEPHotIE _J412) 393-761L

., s 5

~

1992 i

rMY

.BAGE DA1LY RMER LEVEL DAY AVERAGE DAILY POWER LINEL (MWo-Het)

(!Ne-Net) 1 317 17 817 D

2

_,,321 18 813 il e

'4 821.

19 811 4

817_

20 808 5

822 21 808 6

821 22 821 9

7

_ _L'} _

23 821 8

B l~f 24 817 2

9 613 25 821 s

1 10 821 26 821 g

11

_804 27 8 21_,,

12 813 28 8 17 a

13 267 29 813 14 324 30 813 15 721_ _

16 808 INSIRUCTIOtis On this fomat, list the average daily unit power level IMe-Net for each day in the reporting month. C w ptte to the nearest whole megawatt.

_ = - _ _ _ - _ - -

i OPERATING DATA REPORT DOCKET NO.,

50 334 REPORT DATE:

05/05/92 COMPLETED BY: DAVID T. JONES TELEPHONE:

(412) 393 7612 CPEPmATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD:-APRIL 1992
3. LICENSED THERMAL PGWER (MWt):

2652 4 NAhEPLATE RATING (Cross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

835

6. MAX DEPENDABLE CAPACITY (Gross MWe):

860

7. MAX. DEPENDABLE CAPACITY (Net MWe):

810

8. IF CHANGES OCCUR IN_ CAPACITY RATINGS SINCE LAST REPORT. GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (Not MWe):

None

-10. REASONS FOR RESTRICTIONS. IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

719.0 2903.0 140255.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

'719.0 2903.0 88226.6

13. REACTOR RESERVE SHUTDOWN HOURS:

0,0 0.0 4482.8

.14. HOURS GENERATOR'VAS ON LINE:

719.0 2903.0 86334.2

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.n

16. CROSS THERMAL ENERGY GEN. (MWH):

1821532.0 7596923.0 20G109095.s

17. GROSS ELECT, ENERGY CEN. (MWH):

593870,0 2501250.0 66299653.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

559280.0 2362510.0 61930060.0 19.-UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 63.6 20 UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 63,6

21. Ut"iT CAPACITY FACTOR (MDC): PCT 96.0 100.5 57,2
22. UNIT CAPACITY FACTOR (DER): PCT 93.2 97.5 55.5
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 16.3
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TfPE,DATE,AND DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, T'rIMATED DATE JF STARrUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERi ' ION N/A N /A

7, L

UNI'T' SHUTDOWNS AND Pt4ER REDUCTIONS (220%)-

Locket No.

50-334 Unit Name' BVPS Unit #1 Date

_Mey 4 1992 Completed By Onvid T.' Jones REPORT MONTH APRIL 1992 Telephena (412) 393-7612 i

f Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.

Date Typel_

(Hours).

Retson2 Down Reactor 3 Report #

. Code 4 Code 5 Prevent Recurrence 1

1920413 F

0 8

5 N/A HC HTEXCH Unit reduced output from 100% to approximately 30% to repair tube lesks in the Unit's main condenser; s

2 920415 F:

0 B

5' N/A.

IF.

INSTRO Unit reduced output to approx. 70%-

to re-calibrate controt red H-2 position indicator.

t i

1 2

3 4

F-Forced Reason:

Method:

Exhibit F~

itructions for S-Scheduled A-Equipment Failure.(Explain) 1-Manual Preparar of Data Entry Sheets 8-MaintenarMe or Test 2-Manual Scram for Lic-

,ee Event Report (LER) File C-Refueling 3-Automatic Scram (NUREG0161).

D-Regulatory Restriction 4-Cont 'd. f r om Prev ious Mor.th E-Operator Training & License Exam 5-Reduction 5

F-Administrative 9-Other Exhibit H-Same Source.

G-Operational Error (Explain)

H-Other (Explain) i I

i t

u -

i NARRATIVE SG8%RY OF MotmLY. OPEPATING EXPDUFNCE l# TIT 2 APRIL 1992

. April 1 The Unit remined shutdcun in Mode 6 for the Unit's third throtqh refueling outage.

-. April 19 April 20 The Unit entered Mode 5 at 2350 hours0.0272 days <br />0.653 hours <br />0.00389 weeks <br />8.94175e-4 months <br />.

' April 21 The Unit renained in Mode 5 for the remirx3er of the report

-through

- period.

- April 30 e

P pe w

w-r gg s

s

AVERAGE DAILY UNIT I%TR LEVEL DOCKET 10.

50-412 UNIT BVPS Unit 2 DATE May 4, 1992 T14PLEITD BY David T. Jo:.ec, TELEPHONE (412) 393-7612

!Olini April 1992 DAY AVEPME DAILY EGTR LEVEL DAY AVERIGE DAILY KMER LEVEL (MWe-Net)

(IHe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 L

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

23 0

13 0

29 0

14 0

30 0

15 0

i 16 0

INS 1FIA"I' IONS On this format, list tue average daily unit power level IEe-Net for each day in the reporting month. Campute to the nearest whole r:ogawatt.

. ~.

OPEPATING DATA REPORT DOCKET NO..

50-412 REPORT DATE:

05/05/92 COMPLETED BY: DAVID T. JONES TELEPHONE:

(412) 393 7612 OPEPATING SI611LS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: APRIL 1992
3. LICENSED THERMAL POWER (MWt):

2652 4 NAMEPLATE-RATING (Gross MWe):

923 5.. DESIGN ELECTRICAL RATING (Net MWe):

836 6l MAX. DEPENDABLE CAPACITY (Grcss MWe):

870

7. MAX. DEPENDABLE CAPACITY (Net MWe):

820

3. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WilICll RESTRICTED, IF ANT (Net MWe):

None

10. REASONS FOR RESTRICTIONS IF ANY:

N/A THIS MONTH YEAR TO DATE CUMVLATIVE

11. HOURS IN REPORTING PERIOD:

719.0 2903.0 39038,0

12. NO. OF HRS.. REACTOR WAS CRITICAL:

0.0 1751.1

'.32831,3

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.C 0.0 14 HOURS GENERATOR JAS ON LINE:

0,0 1750.7 32632.7

15. UNIT-RESERVE SHUTDOW HOURS:

0.0 0.0 0.0

16. CROSS THEPJ4AL ENEGY GEN, (MWH):

0.0.

4176762.0 79536509.4

17. GROSS ELECT. - Et,ERGY GEN. (hWH):

0.0 1346432,0 25521013.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

.-2808.0 1268399.0 24073884.0

19. UNIT SERVICE FACTOR; (PERCENT) 0.0 60.3 83.6
20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 60.3 83.6
21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 53.3 74.5
22. UNIT CAPACITY FACTOR (DER): PCT 0.0 52,3 73,8
23. UNIT FORCED OUTAGE RA*iE: (PERCENT) 0.0 0.0 3.7
24. SHOTD0k.. SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE.AND DURATION OF EACH):

THE UNIT'S THIQ REFURLING OUTAGE IS CURRENTLY IN PROGRESS.

25; IF SHUT DCVN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

5/23/92-

26. UNITS.'IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A _

COMMERCIAL OPERATION N/A N/A

UNIT SHUTDOWNS.AhD POWER REDUCTIONS (120%)

. E ocket No.

'50-412

~

Unit Name' BVPS Molt #2 i

Date

_May 4 lf92 Completed By.

David T.

ipnes REPORT MONTH MARCH 1992 Telephone (412) 393-?612 Method of Licensee Cause & Corrective,

.Luration Shutting Event lystem Component Action to

'No.

Date-Typel

,(Hours)-

Reason 2 Down Reactor 3 Report #

Code 4 Code 5 Prevent Recurrence 10 920401 LS 719.0 C

4 W/A' 7

FUELXX Unit remained shutdown for tte third refueling outage.

T i

[

1 2

3 4

F-Forced Reason:

Method:

Exhibit F-Instructions for S-Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets B-Maintenance or Test 2-Manual Scrse for Licensee Event Report (LER) File C-Ref uet ing -

3-Automatic sur$m (NUREG0161).

D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exim 5-Reduction 5

F-Administrative 9-Other Exhibit H-Same Source.

G-Operational Error (Explain)

H-Other (Explain) i r