ML20096C887
| ML20096C887 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 01/11/1996 |
| From: | Wigginton D NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20096C892 | List: |
| References | |
| NUDOCS 9601180352 | |
| Download: ML20096C887 (4) | |
Text
_ _ _ _ _ _
,$* *h, UNITED STATES g
Q NUCLEAR RERULATORY CCMMISSION
~*
2 WASHINGTON, D.C. 30006 4 001
\\,*****/
GULF STATES UTILITIES COMPANY **
CAJUN ELECTRIC POWER COOPERATIVE AND ENTERGY OPERATIONS. INC.
DOCKET NO. 50-458 RIVER BEND STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 86 License No. NPF-47 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A. ' The application for amendment by Gulf States Utilities * (the licensee) dated November 20, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized i
by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and ~
- E01 is authorized to act as agent for Gulf States Utilities Company, which has been authorized to act as agent for Cajun Electric Power Cooperative, and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.
- Gulf States Utilities Company, which owns a 70 percent undivided interest in River Bend, has merged with a wholly owned subsidiary of Entergy Corporation. Gulf States Utilities Company was the surviving company in the merger.
9601180352 960111 PDR ADOCK 05000458 P
I E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have
]
been satisfied.
a j
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment; l
and Paragraph 2.C.(2) of Facility Operating License No. NPF-47 is hereby amended to read as follows:
4 (2). Technical Soecifications and Environmental Protection Plan l
The Technical Specifications contained in Appendix A, as revised i
through Amendment No. 86 and the Environmental Protection Plan 1
contained in Appendix B, are hereby incorporated in the license.
E01 shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
The license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
-t b
David L.
nton, Senior Project Manager l
Project Directorate IV-1 Division of Reactor Projects III/IV l
Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications i
Date of Issuance:
January 11, 1996 i
1
ATTACHMENT TO LICENSE AMENDMENT NO. 86 FACILITY OPERATING LICENSE NO. NPF-47 DOCKET N0. 50-458 Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by Amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT 3.3-6 3.3-6 i
RPS Instrumentation 3.3.1.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.3.1.1.16 Verify Turbine Stop Valve Closure and 18 months i
Turbine Control Valve Fast. Closure Trip 011 Pressure--Low Functions are not bypassed when THERMAL POWER is 2: 40% RTP.
SR 3.3.1.1.17 Calibrate the flow reference 18 months transmitters.
SR' 3.3.1.1.18
NOTES------------------
1.
Neutron detectors are excluded.
2.
For Functions 3, 4, and 5 in Table 3.3.1.1-1, the channel sensors are excluded.
3.
For Function 6, "n" equals 4 channels for the purpose of determining the 18 months on a STAGGERED TEST BASIS Frequency.
STAGGERED TEST BASIS Verify the RPS RESPONSE TIME is within limits.
RIVER BEND 3.3-6 Amendment No. 81,86