Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20097A947 + (12:42:50, 13 December 2024)
- ML20097A940 + (12:42:51, 13 December 2024)
- ML20097A928 + (12:42:53, 13 December 2024)
- DCL-92-118, Forwards Public Version of Revised Emergency Response Plan Std Operating Procedures III.06 HP-3 & III.60,dtd Mar 1992. W/920529 Release Memo + (12:42:54, 13 December 2024)
- ML20097A908 + (12:42:55, 13 December 2024)
- ML20097A894 + (12:42:57, 13 December 2024)
- ML20097A879 + (12:42:57, 13 December 2024)
- TXX-4293, Interim Deficiency Rept SDAR-136 Re Temp Envelope Requirements on Environ Qualification of Equipment Outside Containment or High Energy Line Breaks.Initially Reported on 840604.Westinghouse Program Developed to Address Issue + (12:42:58, 13 December 2024)
- ML20097A852 + (12:42:59, 13 December 2024)
- 05000278/LER-1984-009-01, :on 840801,HPCI Sys Declared Inoperable Due to Identification of Mechanical Failure of Second HPCI Steam Supply Line Hanger 3-23-DBN-S4.Cause Unknown.Hanger Repaired & HPCI Returned to Svc + (12:43:00, 13 December 2024)
- 05000317/LER-1984-008, :840808,battery 21 Declared Inoperable Due to Electrolyte Levels Above High Level Mark for 50% of Battery Cells.Caused by Expansion of Electrolyte During Equalize Charge.Test Procedure Changed + (12:43:03, 13 December 2024)
- RBG-18786, Interim Deficiency Rept DR-184 Re Shop Weld in Bf Shaw Co Support Trunnion.Interim or Final Status Rept Will Be Provided by 841115 + (12:43:04, 13 December 2024)
- 05000285/LER-1984-016, :on 840705,stack Noble Gas Monitor RM-062 High Alarm Setpoint Exceeded Limit.Caused by Drift in Alarm Card. Monitor Reclibr to Tech Spec Requirements + (12:43:07, 13 December 2024)
- RBG-18760, Interim Deficiency Rept DR-179 Re Test Loop Diagrams Used to Perform Continuity Checks of Category I Instrumentation & Control Circuits.Interim or Final Status Rept Will Be Provided by 841011 + (12:43:08, 13 December 2024)
- 05000285/LER-1984-017, :on 840803,unplanned Actuation of Ventilation Isolation Actuation Sys Occurred.Caused by Containment Air Activity Particulate Process Monitor RM-050 Trip.Monitor Discriminator Sensitivity Adjusted + (12:43:10, 13 December 2024)
- ML20097A834 + (12:43:11, 13 December 2024)
- RBG-18761, Interim Deficiency Rept DR-174 Re Angle Joint Fillet Welds Supplied by Reactor Controls,Inc.Interim or Final Status Rept Will Be Provided by 841010 + (12:43:12, 13 December 2024)
- ML20097A830 + (12:43:13, 13 December 2024)
- ML20097A828 + (12:43:14, 13 December 2024)
- ML20097A826 + (12:43:15, 13 December 2024)
- TXX-4292, Interim Deficiency Rept SDAR-145 Re Piping Matl That Does Not Meet Ultrasonic Test Requirements for NB-2500 ASME Class 1 Applications.Initially Reported on 840815.Upon Completion of Investigation,Matter Determined Not Reportable + (12:43:16, 13 December 2024)
- ML20097A823 + (12:43:16, 13 December 2024)
- TXX-4291, Interim Deficiency Rept SDAR-140 Re Several Main Steam Relief Valves Not Qualified for Actual Loading Conditions. Completion Anticipated by 841009 + (12:43:17, 13 December 2024)
- ML20097A800 + (12:43:18, 13 December 2024)
- ML20097A794 + (12:43:18, 13 December 2024)
- ML20097A793 + (12:43:19, 13 December 2024)
- ML20097A777 + (12:43:20, 13 December 2024)
- ML20097A784 + (12:43:20, 13 December 2024)
- ML20097A776 + (12:43:21, 13 December 2024)
- ML20097A773 + (12:43:22, 13 December 2024)
- ML20097A768 + (12:43:23, 13 December 2024)
- ML20097A763 + (12:43:23, 13 December 2024)
- ML20097A758 + (12:43:24, 13 December 2024)
- ML20097A753 + (12:43:25, 13 December 2024)
- ML20097A748 + (12:43:26, 13 December 2024)
- ML20097A744 + (12:43:30, 13 December 2024)
- ML20097A736 + (12:43:31, 13 December 2024)
- RBG-42409, Documents Extension of Commitment Developed in Response to NRC Violation 9325-03,per Discussion W/W Smith on 960105. Commitment Due Date Extended to 961231 + (12:43:31, 13 December 2024)
- ML20097A724 + (12:43:32, 13 December 2024)
- ML20097A721 + (12:43:33, 13 December 2024)
- ML20097A720 + (12:43:33, 13 December 2024)
- ML20097A716 + (12:43:34, 13 December 2024)
- ML20097A712 + (12:43:35, 13 December 2024)
- ML20097A707 + (12:43:36, 13 December 2024)
- ML20097A705 + (12:43:37, 13 December 2024)
- ML20097A697 + (12:43:38, 13 December 2024)
- ML20097A692 + (12:43:38, 13 December 2024)
- ML20097A691 + (12:43:40, 13 December 2024)
- ML20097A690 + (12:43:40, 13 December 2024)
- ML20097A679 + (12:43:41, 13 December 2024)
- ST-HL-AE-5286, Forwards 2RE04 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) for STP Electric Generating Station,Unit 2 + (12:43:42, 13 December 2024)
- ML20097A667 + (12:43:43, 13 December 2024)