OPERATING DATA REPORT
,4 DOCKFT NO. 50 - 277 DATE AUGUST 15, 1984 COBPLETED BY PHILADELPHI A ELECTRIC COEPANY W.E.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GEN ER ATION DITISION-BU CLE AR TELEPHONE (215) 841-5022 OPERATIrG STATUS
==-..____...____... ____
- 1. UNIT NARE: PEACH BOTTOR UNIT 2 I NOTES: UNIT 2 CONTINUED ITS l
g l
= = _ - -
- 2. REPORTING PERIOD:
JULY, 1984 i
SCHEDULED SHUTDOWN FOR l
l g
- 3. LICENSED THERB AL POWER (BWT):
3293 l
ITS SIITH REFUELING AND l
=
4 BABEPLATE RATING (GROSS 55E) :
1152 i
BAINTENANCE OUIAGE.
]
1 l
- 5. DESIGN ELECTRICAL RATING OIET BWE):
1065 l
l g
g
- 6. BAIIBUS DEPENDABLE CAPACITY (GROSS BRE): 1098 l
l g
g
- 7. BAIIBUB DEPENDABLE CAPACITY (NET BBE) :
1051 l
l
- 8. IF CH ANGES OCCUR IN CAPACITY RATINGS (ITERS N UBBER 3 THROUGH 7) SINCE LAST REPORT, GITE REASONS:
- 9. POWER LEVEL TO NEICH RESTRICTED, IF ANY (NET BRE) :
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS BONTH YR-TO-DATE CUBULATIYh
- 11. HOURS IN REPORTING PERIOD 744 5,111 88,319
- 12. 535BER OF HOURS REACTOR WAS CRITICAL 0
2,584.7 62,283.6
- 13. SEACTOR RESERTE SHUTDOWN HOURS 0.0 0.0 00
- 14. HOURS GENER ATOR ON-LINE 0.0 2,544.8 60,556.6
...____=
- 15. UNIT RESERVE SHUTDOWN BOURS 0.0 0.0 0.0
- 16. GROSS THERB AL ENERGY GENERATED (BWB) 0 7,865,391 178,420,001
- 17. GROSS ELECTRICAL ENERGY GENERATED (59 H) 0 2,547,570 58,718,660
_.._.==--
=----- _
- 18. NET ELECTRICAL ENERGY GENERATED (558)
-5,203 2,448,104 56,284,534
- 19. UNIT SERTICE FACTOR 0.0 49.8 68.6
==___.
- 20. UNIT AT AILABILITY FACTOR 0.0 49.6 68.6
==
- 21. UNIT CAPACITY FACTOR (USING EDC NET) 0.0 45.6 60.6 Ngg 22. -DWIT CAPACITY-FACTOR-(USING DES EET)
- 4.0 45,0 ---
59.8
.so
-- =
ON CL 23. UNIT FORCED OUTAGE RATE 0.0 4.4 12.5
- 50 hh!
- 24. SBUTDOWNS SCREDULED OYER NEXT 6 BONTES (TYPE, DATE, AND DURATION OF EACB):
1 L_Cl SCHEDULED SBUTDONN FOR REFUELING AND BAINTENANCE, F1 s;&RTED 4/27/94
- W1:N:
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIBATED DATE OF STARTUP: 02/04/85 Mgg k
- 26. UNITS IN TEST STATUS (PRIOR TO COBREBCI AL OPER ATION) :
FORECAST ACHIEYED
(>OE INITIAL CRITICALITY WO d
EEIE INITIAL RLECTRICITY
__._=-
gS i
COBBERCIAL OPERATION O - NEG ATITE TALUE REPORTED FOR CONSISTENCY WITH FEDERAL EN ARGY REGULATORY COBBISSION REPORTS.
OPERATING DATA REPORT DOCKET NO. 50 - 278 DATE AUGUST 15, 1984 COEPLETED BY PHILADELPHI A ELECTRIC COBPANY N.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 OPERATING STATUS
- 1. UNIT MARE: PEACH BOTT05 UNIT 3 l NOTES: UNIT 3 EXPERIENCED l
.=--
=____=__ _
l l
- 2. REPORTING PERIOD:
JULY, 1984 l
ONE FORCED OUTAGE l
=.
l l
- 3. LICENSED THERB AL POWER (B97) :
3293 l
l
=
l g
4 NAREPLATE RATING (GROSS EWE) :
1152 l
l
=_
g g
- 5. DESIGN ELECTRICAL RATING [ NET ENE) :
1065 l
l g
g
- 6. MAIIBUM DEPENDABLE CAPACITY (GROSS ENE) : 1098 I
I l
l
- 7. 5411505 DEPENDABLE CAPACITY (NET HWE) :
1035 l
l
- 8. IF CHANGES OCCUR IN CAPACITY RATIN GS (ITZ55 NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEYEL TO WHICH RESTRICTED, IF ANY (WET BUE) :
- 10. REASONS FOR RESTRICTIONS, IF ANY:
TEIS 50 NTH YB-TO-DATE CUBULATITE
- 11. HOURS IN REPORTING PERIOD 744 5,111 84,215
- 12. NUBBER OF HOURS REACTOR NAS CRITICAL 670.9 4,268.0 61,067.8
--==.
- 13. REACTOR RESERTE SHUTDOWN HOURS 0.0 0.0 0.0
=--
14 BOURS GENERATOR ON-LINE 655.9 4,210.1 59,526.3
- 15. UNIT RESERTE SHUTDOWN HOURS 0.0 0.0 0.0
_ - = = =
- 16. GROSS THER51L ENERGY GENERATED 055H) 2,082,708 13,366,383 174,404,688
- 17. GROSS ELECTRICAL ENERGY GENERATED (RW E) 693,820 4,452,320 57,267,440
- 18. NET ELECTRICAL ENERGY GENERATED (BWB) 670,462 4,311,604 54,975,389
=
- 19. LMIT SRRTICE FACTOR 88.2 82.4 70.7
- 20. UNIT AYAILABILITI FACTOR 88.2 82.4 70.7
- 21. UNIT CAPACITY FACTOR (USING EDC NET) 87.1 81.5 63.1
==--
- 22. UNIT CAPACITY.JACTOR-(USING DES 31T)- -...
44.6.
. - - 79. 2 - -
. 1.3
- 23. UNIT FORCED OUT AGE R ATE 11.8 14.0 7.8
=
- 24. SHUTDOWNS SCHEDULED OYER NRIT 6 50NTES (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDONN AT END OF REPORT PERIOD, ESTIBATED D ATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COBEERCIAL OPERATION) :
FORECAST ACHIEYED INITIAL CRITICALITY l
INITIAL ELECTRICITT
=___--_-
C0551RCIAL OPERATION
=-
Wa..
UNIT $80TDONNS AND PONER REDUCTIONS DOCK ET NO. 50 - 277 UNIT M7BE PEACH BOTTON UNIT 2 DATE AUGUST 15, 1984 REPORT MONTH JULY, 1984 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY N.n.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022
-=. __
-.__=-
l l
l l
l METHOD OF l LICENSEE lSYSTE5lCOMPOWENTl CAUSE AND CORRECTIVE l
l TYPE lDUR ATIONl RE ASON l SHUTTING DONN I EVENT l CODE l CODE I ACTION TO GO.l DATE l (1) l (HOURS) l (2) l RE ACTO R (3) l REPORT S l (4) l (5) l PREVENT RECURRENCE
....._... =_
I l
1 l
l l
l l
l 5 I 840701 l S l 744.0 l
C l 1
i NA l
RC l FUELII l SHUTDONN FOR ITS SIITH REFUELING OUTAGE.
I l
l ----- l I
l 1
l l
l l
l 744.0 l
l l
l l
l (1)
(2)
(3)
(4)
F - PORCED REASON RETHOD EIBIBIT G - INSTRUCTIONS S-bCHEDULED
& - EQUIPRENT FAILURE (EIPLAIN) 1 - MANUAL FOR PREPARATION OF DkTA B - M AINTEN ANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - BEFUELING 3 - AUTOMATIC SCRAR.
EVENT REPORT (LkR)
D - REGULATORT RESTRICTION 4 - OTHER (EIPLAIN)
FILE (NO RLG-0161)
E - OPERATOR TRAINING + LICENSE EIARINATION '
F - ADRINISTRATIVE (5)
G - OPERATIONAL ERROR (EIPLAIN)
H - OTHER(EIPLAIN)
EIRIBIT I - SARE SOURCE 1
l
UNIT SHUTDONNS AND PONER REDUCTIONS DOCKET NO. 50 - 278 UNIT NARE PEACH BOTTOM UNIT 3 DATE AUGUST 15, 1 84 REPORT RONTH JULY, 1984 COMPLETED BY P13ILADELPHIA ELECTRIC COMPANY W.H.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION G EN ER ATIO N DIVISION-NUCLEAR TELEPHONE (215) 841-5022
.... = - - - - = -
-
--- =-
I l
l l
l HETHOD OF l LICENSEE lSYSTE5lCOMPONENTI CAUSE AND CDBRECTIVE l
lTYPEIDURATIONl REASON l SHUTTING DOWNl ETENT l CODE l CODE I ACTION TO NO.l DATE l (1) l (NOURS)I (2) l REACTOR (3) l REPORT 8 l (4) I (5) l PREVENT RECURRENCE l
l 1
1 I
I I
l 1
6 l 840711 i F I 88.10 i
H I 3
l NA l IA l INSTRU l APRR HI,GH FLUI SCRAM OCCURRED FOLLONING A l
l l
l l
l l
l l
LIGHTNING STRIKE ON 500KV BUS TIE LINE I
l 1 ----- 1 I
l I
I I
i l
l 88.1 I
I l
l I
I
( 1)
(2)
(3)
(4)
F - PORCED REASON METHOD EIHIBIT G - INSTRUCTIONS S-SCHEDULED A - EQUIPMENT FAILUBE (EIPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST.
2 - MANUAL SCRAR.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTORATIC SCRan.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EIPL AIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING
- LICENSE RIARINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL EkROR (EIPLAIN)
H - OTHER (EIPLAIN)
EIRIBIT I - SAME SOURCE e
N AYERAGE-DAILY UNIT POWEB LEYEL DOCKET No. 50 - 277.
h UNIT PEACH BOTTOR UNIT 2 D ATE AUGUST 15, 1984 7
COMPANY PHILADELPHI A ELECTRIC COMPANY W.H.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH JULY 1984 s~
\\
DAY AVERAGE DAILY POWER LEVEL DAT AVERAGE DAILY POWER LEVEL (MW E-NET)
(HWE-NET) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
. (
5 0
21 0
6 0
22-0 7
0 23 0
4 8
0 24 0
9 0
25 0
10 0
26 0
11 0
27 0
l 12 0
28 0
13 0
29 0
14 0
30 0
l i
15 0
31 0
16 0
l i
r l
)
i; y
s
._ \\,
e-
AYERAGE DAILY UNIT POWER LEYEL DOCKET NO. 50 - 278 r
UNIT PEACH BOTTOM UNIT 3 DATE AUGUST 15, 1984 COMPANY PHILADELPHIA ELECTRIC COMPANY N.B.ALDEN EEGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022
____==---
HONTH JULY 1984 t
DAY AVERAGE DAILY POWER LEYEL DAY AYERAGE DAILY POWER LEVEL (RWE-NET)
(M WE-NET) 1 1051 17 936 2
1052 18 1010 3
1053 19 1056 4
1053 20 1052 5
1053 21 904 6
1057 22 1055 7
1065 23 1053 8
1064 24 1049 9
1065 25 1054 10 1069 26 1058 11 856 27 1058 12 0
28 1055 13 0
29 1055 14 0
30 1056 15 202 31 1058 16 814 l
I l
~
gocboS Wo. @@-8WW a
Attachment to
/
g;/*
Monthly Operating 3
Report for July, 1984 b.
REFUELING INFORMATION 1.
Name of facility:
Peach Bottom Unit 2
- 2. ' Scheduled date for'next refueling shutdown:
I April 27, 1984 3.
Scheduled date for restagt following refueling:
February 4, 1985 g
4.
Will refueling or resumption of operation thereafter require a technical specification change or other' license amendment?
' Yes!
If answer is yes, what, in general, will these be?
Technical Specifications to accommodate reload fuel.
Modifications to reactor core operating limits.
Technical spe'cification changes associated with snubber reduction program.
(
5.' Scheduled date (s) for submitting proposed licensing action and suppo.; ting information:
August 31, 1984 for reload fuel and snubber reduction program.
l 6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unroviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
+
1 None expected.
c.1 of 7.
The number of fuel assemblies (a) in the core and (b) in the spent l
fuel storage pool:
l (a)
Core - 764 Fuel Assemblies (b)
Fuel Pool - 1170 Fuel Assemblies, 58 Fuel Rods 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been reqdested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies, i*
P' 9.
Th'e'projectec d3te of the last refueling that can be discharged to
( j) the spent -f,uel. pool assuming the present licensed capacity.
[]
September, _1990 (March,1986, with reserve full
!h s =
core discharge) f.~
s y
!L*
~
'Dockat No.'50-278 Attachmsnt to
?*
Monthly Operating R
Raport for July, 1984 EEEEEhlE9 ly[g333TIgg
- 1.. Name of facility:
Peach Bottom Unit 3 2.
Scheduled date for next refueling shutdown:
March 30, 1985.
3.
Scheduled date for restart following refueling:
September 21, 1985.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes.
If answer is yes, what, in general, will these be?
Technical Specifications to accommodate reload fuel.
Modifications to reactor core operating limits.
Technical specification changes associated with snubber reduction program.
5.
Scheduled date (s) for submitting proposed licensing action and supporting information:
June 21, 1985 for reload fuel 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analjcis methods, significant changes in fuel design, new operating procedures:
None expected.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
Core - 764 Fuel Assemblies y
(b)
Fuel Pool - 1212 Fuel Assemblies, 6 Fuel Rods 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.
19.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
September, 1991 (March,1987, with reserve for full core discharge)
Docket Nos. 50-277/60-278 Attachment to Monthly Operating Report for July, 1984' Peach Bottom Atomic Power Station Narrative Summary of Operating Experiences j
July, 1984 UNIT 2 Unit 2's' Refueling / Pipe Replacement Outage continued throughout the month of July.
Installation of recirculation discharge nozzle caps have been completed, measurements for head spray piping replacement have been taken, all recirculation suction nozzles have been cut, and pre-operational tests for chemical decontamination of the pipe.to be removed have been completed.
Critical path outage work currently being performed is chemical decontamination of the recirculation and Residual Heat Removal piping.
On July 8, the E-3 Diesel Generator was removed from service for an annual inspection and was returned to service on July 14.
On July 27, Dye Penetrant examinations on the reactor vessel N-2 (Recirc. Inlet) thermal sleeve to safe end welds revealed cracks in 3 welds.
UNIT 3 The unit began the month at 98% power.
On July 11, 1984, the unit tripped when a lightning strike near the substation initiated a sequence of electrical breaker openings culminating in an automatic reactor scram.
While the unit was shut down, a Reactor Water Cleanup System isolation valve failed to open during a functional test.
The valve operator was replaced to correct the problem.
Also, an external-leak on the condensate system 'C' drain cooler was repaired.
The unit returned to service on July 15, 1984.
On July 17, reactor power was reduced to 825 MWe when a gasket on a strainer in the lube oil system for the
'A' reactor feedwater pump failed, resulting in a loss of oil from the lube oil reservoir.
The feedpump was returned to service three hours later.
Power was reduced on July 20 for a control rod pattern adjustment and returned to. full power on July 22.
The unit continued at i
full power for the remainder of the month.
1
. PHILADELPHIA ELECTRIC COMPANY 23O1 MARKET STREET P.O. BOX 8699 PHILADELPHIA, PA. 9101
- 215:8414000 1
August 15, 1984 Docke t Nos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention:
Document Control Desk
SUBJECT:
Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:
Attached are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of July,1984 forwarded pursuant to Technical Specification 6.9.1.C under the guidance of Regulatory Guide 10.1, Revision 4.
Very truly yours,
$$Y W. T. Ullrich Superintendent Nuclear Generation Division Attachment cc:
Dr. T. E. Murley, NRC Mr. A. R. Blough, NRC Site Inspector Mr. Stan P. Mangi, Dept. of Envir. Resources fiMr~2P. IAERoss2NRCJ INPO Records Center 3)JitD g4 0
M l ' L-Certstied
'>~