~ Georgia Power Company
~-4
- 333 Pie.dnont Avenue Attanta Georgia 30308 Telephone 404 526-7020 Mailing Address:
Post Office Box 4MS Atlanta Georgia 30:42 Georgia Power J. T. Beckham, Jr.
the sourt,em elt'ctrc sys:em Vice President and General Manager N; clear operations NED-84-415
~
Septenber 5, 1984 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief
-Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Cannission Washington, D. C.
20555 NRC DOCKET 50-366 OPERATING LICENSE NPF-5 EDWIN I. HAICH NUCLEAR PIANT UNIT 2 REQUEST 70 NEND TEDNICAL SPECIFICATIONS Gentlenen:
Georgis Power Cmpany's (GPC) letter dated April 10, 1984 provided a description of the modifications planned to satisfy NUREG-0737 Item
.II.E.4.2(7), which requires that contaiment purge and vent valves close autmatically on a high contaiment radiation signal.
It was stated in the Jetter that revisions to Technical Specifications would be subnitted h llowing implenentation of the modifications.
The modificatiens have recently been cmpleted at Hatch Unit 2.
In accordance with the provisions of 10 CFR 50.90 as required by 10 CFR 50.59 (c) (1), GPC proposes to anend the Plant Hatch Unit 2 Technical Specifications (Appendix A to Operating License NPF-5) to reflect the implenentation of Iten II.E.4.2(7).
The proposed change adds limiting conditions for operation, trip setpoints, and surveillance requirenents for the monitors which provide the high radiation isolation signals to the contalment purge and vent valves.
The trip setpoint was calculated such that no -accident would result in radiation doses at the site boundary exceeding the EPA Protection Action Guide limits of 1 Ren whole body and 5 Ren thyroid.
The calculation was performed asstraing a delay of 30 minutes fra the time the setpoint is exceeded to the time of valve closure.
Because of this significant margin, response time testing of the radiation monitors is not considered necessary and is not proposed.
N l 0h k
9%(
8409130355 840905 PDR ADOCK 05000366 gh P
PDR l
m TGeorgiaPower d Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Septenber'5, 1984 Page 'IWo
%e proposed change has been reviewed and approved by the Plant Review Board 'and the Safety Review Board cnd has been determined not to constitute unreviewed _ safety question.
The' probability of occurrence and the consaluences of an accident or malfunction of squignent important to safety an would not be increased above those analyzed in the FSAR because the change provides. additional redundancy to previously existing containment isolation signals.; ne possibility of an accident or malfury tion of a different type
. than.any analyzed in the - FSAR is not created by the change because no n failure mode is introduced.
for any Technical Specification is not reduced because the change results in an isolation signal which is more conservative than existing signals.
The proposed change has been determined not to involve significant hazards considerations as discussed in Enclosure 2.
Payment of the appropriate licensing fee is enclosed.
Ledbetter of the Georgia Department of Pursuant to 10 CFR 50.91, J. L.
Natural Resources will be provided a copy of this subnittal.
'J. T. Beckhan, Jr. states that he is Vice President of Georgia Power Cmpany and is authorized to execute this oath on behalf of Georgia Power Cmpany, and that to the best of his knowledge and belief the facts set forth in this letter are true.
GEORGIA IGER CCMPANY By:g J. T. Beckhan, Jr.
to and subscribed before me this 5th day of Septenber,1984.
Swo Notary Public, Georgia, State at Large My Commission Empires Sept.18,1987 g
~
~ Notary Public JH/mb Enclosure xc:
H. C. Nix, Jr.
Senior Resident Inspector J. P. O'Reilly, (NRC-Region II)
J. L. Ledbetter
.. - -,.. - -