ML20097A834

From kanterella
Jump to navigation Jump to search
RO 370-84-17:on 840806,separation of 2-inch Pipe Weld in Rhr/Chemical & Vol Control Sys HX Occurred.Ler Will Be Submitted by 841005 Due to Extensive Investigation,Analysis & Review of Event
ML20097A834
Person / Time
Site: Mcguire
Issue date: 09/05/1984
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
LER-370-84-17, NUDOCS 8409130414
Download: ML20097A834 (1)


Text

E

- DUKE POWER GOMPANY P.O. BOX 33180 CHARLOTTE N.C. 28242 HALB. TUCKER' TELEPHONE ,

nos emessouN, (704) 373-4531 WitLEAB PaontTTION September 5, 1984 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

McGuire Nuclear Station, Unit 2 Docket Number 50-370 LER 370-84-17 Gentlemen:

On August 6, 1984 a separation of a 2" pipe weld in the Residual Heat Removal / Chemical and Volume Control System Heat Exchanger occurred. This event has been determined to be reportable under the criteria of 10 CFR 50.73(a)(z)(vi), with the report due on September 5,1984. However, due to the extensive investigation, analysis, and review of this event, License Event Report 370-84-17 is still being prepared. The LER will be submitted by October 5, 1984. If there are any questions, please call Scott Gewehr at (704) 373-7581.

Very truly yours, c -

H. B. Tucker SAG /ibh cc: Mr. J. P. O'Reilly, Regional Administrator U. S. Nuclear Reg. Comm. - Region II 101 Marietta Street Suite 3100 Atlanta, Georgia 30323 Records Center Institute of Nucleat Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 Mr. W. T. Orders NRC Resident Inspector McGuire Nuclear Station American Nuclear Insurers c/o Dottie Sherman, ANI Library The Exchange, Suite 245 g

270 Framington Avenue Framington, CT. 06032 4y9QO 4j4