Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20097G215 + (12:24:38, 13 December 2024)
- ML20097G207 + (12:24:39, 13 December 2024)
- ML20097G210 + (12:24:39, 13 December 2024)
- ML20097G206 + (12:24:40, 13 December 2024)
- ML20097G205 + (12:24:41, 13 December 2024)
- 05000249/LER-1984-009-07, :on 840808,operator Received Alarm Indicating High O2 Concentration in Torus.Caused by Failure of Torus to Reactor Bldg Vacuum Breaker 3-1601-20B Due to Shearing of Flathead Mounting Bolts + (12:24:42, 13 December 2024)
- ML20097G187 + (12:24:43, 13 December 2024)
- ML20097G184 + (12:24:45, 13 December 2024)
- ML20097G172 + (12:24:45, 13 December 2024)
- IR 05000321/1996001 + (12:24:46, 13 December 2024)
- ML20097G169 + (12:24:48, 13 December 2024)
- ML20097G164 + (12:24:48, 13 December 2024)
- ML20097G155 + (12:24:50, 13 December 2024)
- ML20097G150 + (12:24:51, 13 December 2024)
- ML20097G134 + (12:24:51, 13 December 2024)
- ML20097G115 + (12:24:52, 13 December 2024)
- 05000265/LER-1984-007-01, :on 840610,90% Closed Limit Switch Stuck in Closed Position.Due to Intense Heat Near Control Valves, Switch Removed to Determine Cause.Cause Unknown.Mod M-4-1(2)-84-20 in Process + (12:24:54, 13 December 2024)
- ML20097G095 + (12:24:55, 13 December 2024)
- 05000362/LER-1984-033-01, :on 840805,plastic Const Cap Discovered Obstructing Annular Suction Line Between Condensate Storage Tank T-121 & Sump Area of Condensate Storage Tank T-120. Caused by Misinterpretation of Design + (12:24:57, 13 December 2024)
- ML20097G085 + (12:24:59, 13 December 2024)
- 1CAN069201, Forwards Rev 0 to SIR-92-037, ASME Code Case N-481, Evaluation of Arkansas Nuclear One Unit 1 Reactor Coolant Pumps. Rept Provides Results of VT-2 Exam & ASME Code Case N-481 Evaluation + (12:25:00, 13 December 2024)
- ML20097G080 + (12:25:00, 13 December 2024)
- ML20097G078 + (12:25:01, 13 December 2024)
- ML20097G069 + (12:25:02, 13 December 2024)
- ML20097G077 + (12:25:02, 13 December 2024)
- ML20097G068 + (12:25:03, 13 December 2024)
- JAFP-92-0454, Special Rept:On 911003,discovered pin-hole Leak in Diesel Fire Pump.Caused by Discharge Pressure.Surveillance Test Procedure Was Revised + (12:25:04, 13 December 2024)
- BECO-LTR-96-008, Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station + (12:25:04, 13 December 2024)
- U-602547, Discusses Info Re Change to QA Program Re Method Util Plans to Use for Meeting Procedure Adherence Guidelines Contained in ANSI N18.8-1976 + (12:25:06, 13 December 2024)
- ML20097G046 + (12:25:06, 13 December 2024)
- ML20097G042 + (12:25:07, 13 December 2024)
- 05000298/LER-1995-022, :on 951213,reactor Trip Signal,Esf Occurred. Caused by Personnel Error.Training to Maint Planners Provided to Enhance Ability to Identify & Develop Post Maint Testing Requirements + (12:25:09, 13 December 2024)
- ML20097G040 + (12:25:13, 13 December 2024)
- ST-HL-AE-5296, Requests to Update NRC Distribution Lists to Reflect New Title + (12:25:14, 13 December 2024)
- ML20097G029 + (12:25:15, 13 December 2024)
- ML20097G025 + (12:25:16, 13 December 2024)
- RBG-42477, Forwards 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (12:25:16, 13 December 2024)
- LIC-96-0018, Certifies That ANI & Maelu Policies 96134 & Nelia Policy 95087 for on-site Property Damage & Decontamination Insurance Will Be in Force as of 960401 + (12:25:17, 13 December 2024)
- ML20097G023 + (12:25:19, 13 December 2024)
- ML20097G020 + (12:25:20, 13 December 2024)
- NRC-96-0007, Provides Response to Requested 180-day Actions Required by GL 95-07, Pressure Locking & Thermal Binding of Safety- Related Power-Operated Gate Valves + (12:25:20, 13 December 2024)
- LIC-96-0012, Forwards Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (12:25:21, 13 December 2024)
- 0CAN029605, Forwards Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (12:25:22, 13 December 2024)
- BSEP-96-0051, Forwards Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (12:25:23, 13 December 2024)
- ML20097G006 + (12:25:23, 13 December 2024)
- ML20097G001 + (12:25:24, 13 December 2024)
- BVY-96-009, Monthly Operating Rept for Jan 1996 for Vermont Yankee Nuclear Power Station + (12:25:25, 13 December 2024)
- ML20097F998 + (12:25:25, 13 December 2024)
- ML20097F993 + (12:25:26, 13 December 2024)
- ML20097F991 + (12:25:27, 13 December 2024)
- ML20097F984 + (12:25:28, 13 December 2024)
- ML20097F987 + (12:25:28, 13 December 2024)