ML20097F984

From kanterella
Jump to navigation Jump to search
Forwards Draft Chapter 6, Pressurized Thermal Shock Integrated Risk for Calvert Cliffs Unit 1 & Potential Mitigation Measures, of Pressurized Thermal Shock Evaluation of Calvert Cliffs Unit 1 Nuclear Power Plant
ML20097F984
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 08/22/1984
From: Selby D
OAK RIDGE NATIONAL LABORATORY
To: Clay Johnson
NRC
Shared Package
ML20097F969 List:
References
REF-GTECI-A-49, REF-GTECI-RV, TASK-A-49, TASK-OR NUDOCS 8409190212
Download: ML20097F984 (1)


Text

_

O e

Chapter 6.

PTS Integrated Risk for Calvert Cliffs Unit 1 and Potential Mitigation Measures of A PRESSURIZED THERMAL SHOCK EVALUATION OF THE CALVERT CLIFFS UNIT 1 NUCLEAR POWER PIANT P r. s l

.3 II a jj L,_] jf written by The PTS Study Group of Oak Ridge National Laboratory By acceptance of this article, the pubbsher or recipient acknowledg.s the U.S. Government's right to reteen a nonesclusive, royalty-free I. cense 6n and to any copyright co reng the.,tici..

s Date of Draft: August 21, 1984 NOTICE: This document contains.Information of a preliminary nature.

It is subject to revision or correction and therefore does not represent a final report.

  • Research sponsored by U.S. Nuclear Regulatory Commission under Contract No. DE-AC05-840R21400 with the Martin Marietta Energy Systesse Inc.

with U.S. Department of Energy.

1 1

l l

I l

l 8409190212 840828 i

PDR ADOCK 05000317 l

P PDR

-.