Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-37324, Responds to Violations Noted in Insp Rept 50-458/92-18 on 920412-0523.Corrective Actions:Outboard Isolation Valve Closed & Tagged & 920412 Containment Breach Reviewed W/ Operators During Shift Briefings + (11:37:18, 13 December 2024)
- ML20099E786 + (11:37:19, 13 December 2024)
- JSP-377-92, Responds to SALP 11 for Feb 1991 Through Apr 1992.Items Needing Addl NRC Clarification Re Engineering/Technical Support & Safety Assessment/Quality Verification Listed on Encl + (11:37:20, 13 December 2024)
- ML20099E784 + (11:37:20, 13 December 2024)
- ML20099E775 + (11:37:21, 13 December 2024)
- ML20099E772 + (11:37:22, 13 December 2024)
- ML20099E771 + (11:37:22, 13 December 2024)
- ML20099E764 + (11:37:24, 13 December 2024)
- ML20099E756 + (11:37:25, 13 December 2024)
- ML20099E749 + (11:37:26, 13 December 2024)
- 05000482/LER-1992-012, :on 920707,discovered That Sp to Demonstrate Operability of Containment Personnel Airlock & Containment Emergency Escape Airlock Not Performed by 920526 & 0321, Respectively.Caused by Computer Error + (11:37:27, 13 December 2024)
- 05000339/LER-1984-011-02, :on 841019 & 22,emergency Diesel Generator 2H Tripped on High Jacket Coolant Temp.Following Calibr of Temp Switch,Diesel Tripped on High Crankcase Pressure on 841102. Caused by Spurious Instrumentation Problems + (11:37:30, 13 December 2024)
- ML20099E733 + (11:37:31, 13 December 2024)
- TXX-4367, Forwards Rev 1 to Program Plan & Issue-Specific Action Plans, Per 841019 & 23 Meetings W/Nrc.Rev Adds Two non-util Members to Senior Review Team & Replaces All Issue Team Leaders w/non-util Experts + (11:37:31, 13 December 2024)
- ML20099E730 + (11:37:32, 13 December 2024)
- 05000373/LER-1984-066-01, :on 841015,train a ammonia-chloride Alarm Received.Faulty Tape Removed + (11:37:34, 13 December 2024)
- ML20099E720 + (11:37:35, 13 December 2024)
- ML20099E709 + (11:37:36, 13 December 2024)
- ML20099E706 + (11:37:36, 13 December 2024)
- ML20099E705 + (11:37:37, 13 December 2024)
- AECM-84-0508, Forwards Response to Items 2.1 & 2.2.2 of Generic Ltr 83-28 Re Equipment Classification of Reactor Trip Sys Components & Vendor Interface Program,Respectively.Programs in Place Meet Intent of Proposed Vendor Interface Program + (11:37:38, 13 December 2024)
- ML20099E699 + (11:37:38, 13 December 2024)
- ML20099E698 + (11:37:39, 13 December 2024)
- ML20099E695 + (11:37:40, 13 December 2024)
- ML20099E688 + (11:37:40, 13 December 2024)
- ML20099E687 + (11:37:41, 13 December 2024)
- BECO-84-196, Responds to NRC 841001 Request for Addl Info Re Inservice Insp Program.Revised Relief Request PRR-9 to Include All Nozzle Areas That Require Relief Will Be Submitted After Startup from Refueling Outage 6 & Prior to 850331 + (11:37:42, 13 December 2024)
- ML20099E683 + (11:37:42, 13 December 2024)
- ML20099E682 + (11:37:43, 13 December 2024)
- ML20099E681 + (11:37:44, 13 December 2024)
- ML20099E678 + (11:37:44, 13 December 2024)
- ML20099E673 + (11:37:46, 13 December 2024)
- ML20099E669 + (11:37:47, 13 December 2024)
- ML20099E671 + (11:37:47, 13 December 2024)
- ML20099E668 + (11:37:48, 13 December 2024)
- ML20099E663 + (11:37:49, 13 December 2024)
- ML20099E656 + (11:37:49, 13 December 2024)
- ML20099E655 + (11:37:50, 13 December 2024)
- 05000321/LER-1984-019-01, :on 841011,outer Clamp on Seismic Restraint for RHR Svc Water Pump E11-C001B Discovered Missing.Caused by Inadequate Const/Installation.Clamp Will Be Replaced During Pump Reassembly + (11:37:52, 13 December 2024)
- 05000413/LER-1984-014-02, :on 841011,component Cooling Water Sys Found to Have Potential for Overpressurization Should Tubing Failure Occur in Reactor Coolant Pump Thermal Barrier Hx.Surge Tanks Provided + (11:37:54, 13 December 2024)
- AECM-84-0509, Monthly Operating Rept for Oct 1984 + (11:37:55, 13 December 2024)
- ML20099E644 + (11:37:55, 13 December 2024)
- ML20099E640 + (11:37:56, 13 December 2024)
- ML20099E628 + (11:37:57, 13 December 2024)
- ML20099E635 + (11:37:57, 13 December 2024)
- ML20099E624 + (11:37:58, 13 December 2024)
- ML20099E621 + (11:37:59, 13 December 2024)
- BSEP-84-2468, RO 1-84-17:on 841103-05,testing Revealed Presence of Crack Indications at Four Pipe Welds on Reactor Recirculation Loop 12-inch Riser Piping + (11:38:00, 13 December 2024)
- SECY-20-0031, Weekly Information Report - Week Ending April 3, 2020 + (11:38:00, 13 December 2024)
- ML20099E608 + (11:38:02, 13 December 2024)
- ML20099E596 + (11:38:03, 13 December 2024)
- 05000413/LER-1992-007-01, :on 920703,discovered That Previous 72 H Leak Rate Test Had Not Been Performed on Air Lock Per Ts.Caused by Lack of Communication.Operations Support Group Trained Re Communications of Turnover Responsibility + (11:38:04, 13 December 2024)