Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- W3P84-3252, Forwards Proprietary Rev 3 to STD-P-04-002 & Rev a to FI-013 & Nonproprietary Rev 0 to Procedure RW-1-210 Re Radwaste Solidification Process Control Program.Proprietary Procedures Withheld (Ref 10CFR2.790) + (11:35:09, 13 December 2024)
- ML20099F403 + (11:35:09, 13 December 2024)
- ML20099F398 + (11:35:10, 13 December 2024)
- ML20099F392 + (11:35:11, 13 December 2024)
- ML20099F388 + (11:35:11, 13 December 2024)
- ML20099F387 + (11:35:12, 13 December 2024)
- ML20099F386 + (11:35:13, 13 December 2024)
- W3P84-3263, Forwards marked-up FSAR Page 8.3-51 Reflecting Static Uninterruptible Power Supply Change on Frequency Regulation & C-E Documentation to Justify Rev + (11:35:13, 13 December 2024)
- ML20099F384 + (11:35:14, 13 December 2024)
- ML20099F380 + (11:35:15, 13 December 2024)
- ML20099F377 + (11:35:16, 13 December 2024)
- ML20099F373 + (11:35:18, 13 December 2024)
- ML20099F365 + (11:35:19, 13 December 2024)
- TXX-4361, Forwards plant-specific Electrical Schematic/Elementary Diagram Incorporating Auto Shunt Trip Actuation,Per Generic Ltr 83-28 + (11:35:19, 13 December 2024)
- ML20099F363 + (11:35:21, 13 December 2024)
- ML20099F362 + (11:35:21, 13 December 2024)
- ML20099F359 + (11:35:22, 13 December 2024)
- ML20099F357 + (11:35:24, 13 December 2024)
- ML20099F354 + (11:35:25, 13 December 2024)
- ML20099F350 + (11:35:26, 13 December 2024)
- ML20099F342 + (11:35:27, 13 December 2024)
- ML20099F339 + (11:35:28, 13 December 2024)
- ML20099F336 + (11:35:28, 13 December 2024)
- ML20099F334 + (11:35:29, 13 December 2024)
- ML20099F302 + (11:35:30, 13 December 2024)
- ML20099F299 + (11:35:33, 13 December 2024)
- ML20099F295 + (11:35:34, 13 December 2024)
- 2CAN089204, Application for Amend to License NPF-6,changing TS 4.7.1.2.a.1 to Revise Required Value of Steam Supply Pressure for turbine-driven Emergency Feedwater Pump Surveillance Test to Inhibit SG Tube Damage Mechanism + (11:35:35, 13 December 2024)
- W3P84-3246, Submits Clarification of Deviation from Rev 2 to Reg Guide 1.97 Re post-accident Instrumentation.Commitment to Install Equipment Consistent W/Reg Guide or Justification to Maintain Present Equipment Will Be Provided + (11:35:35, 13 December 2024)
- ML20099F268 + (11:35:36, 13 December 2024)
- ELV-03924, NPDES Noncompliance Notification:On 920723,overflow of Oily Waste Separator at Waste Water Retention Basin to Savannah River Via Outfall OSN-12 Occurred.Caused by Valve Misalignment.Investigation Team Formed to Review Incident + (11:35:37, 13 December 2024)
- 05000336/LER-1992-012-01, :on 920706,inadvertent ESAS Actuation Occurred Resulting in Partial Loss of Normal Power & Undervoltage Actuation of Facility Z1.Caused by Deenergizing ESAS Sensor Cabinet.Power Restored to Vital 4,160-volt Bus + (11:35:39, 13 December 2024)
- ML20099F259 + (11:35:41, 13 December 2024)
- ML20099F261 + (11:35:41, 13 December 2024)
- NG-84-5153, Submits Assessment of Work Performed in Response to IE Bulletin 79-14 Re re-walkdown of Certain Piping Sys & Evaluation of Discrepancies Found in Original Walkdown. Final Rept Will Be Submitted by 850601 + (11:35:42, 13 December 2024)
- ML20099F242 + (11:35:43, 13 December 2024)
- ML20099F241 + (11:35:44, 13 December 2024)
- SNRC-1108, Requests NRC Issue Furtherance Certificate to Facilitate Util Issuance of Pollution Control Revenue Bonds.Draft Certificate & General Description of Pollution Control Facilities at Plant Encl + (11:35:44, 13 December 2024)
- 05000333/LER-1992-030, :on 920708,hourly Roving Fire Watch Patrol Missed for 1 H When Fire Watch Left Plant W/O Being Properly Relieved.Caused by Failure to Follow Procedures. Procedures to Strengthen Fire Watch Changed + (11:35:46, 13 December 2024)
- ML20099F226 + (11:35:49, 13 December 2024)
- ML20099F224 + (11:35:50, 13 December 2024)
- ML20099F222 + (11:35:50, 13 December 2024)
- ML20099F221 + (11:35:51, 13 December 2024)
- JAFP-92-0578, Clarifies 920713 Response to Violations & Deviations Noted in Insp Rept 50-333/92-81 on 920413-0501.Corrective Actions: Safety Function Sheet for Control & Relay Room Ventilation & Cooling Approved & QA Upgrade Initiated + (11:35:52, 13 December 2024)
- ML20099F220 + (11:35:52, 13 December 2024)
- ML20099F216 + (11:35:53, 13 December 2024)
- ML20099F191 + (11:35:54, 13 December 2024)
- ML20099F194 + (11:35:54, 13 December 2024)
- 3F1184-14, Forwards Approx Schedule for Submittal of Tech Spec Proposals & Revs for Suppl 1 to NUREG-0737 Items,Per 841001 Request + (11:35:55, 13 December 2024)
- ML20099F180 + (11:35:56, 13 December 2024)
- TXX-4360, Submits List of Requested Changes to Final Draft Tech Specs. Review of Final Draft Tech Specs Incomplete.Addl Mods May Be Necessary at Future Date + (11:35:57, 13 December 2024)