ML20099F334

From kanterella
Jump to navigation Jump to search
Advises That Independent Review of 25% of Fabrication/ Erection Documentation of Reactor Vessel Pedestal/ Containment Liner Completed.No Major Nonconformances Found. Minor Nonconformances Dispositioned
ML20099F334
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/06/1984
From: Herborn D
ILLINOIS POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
U-0725, U-725, NUDOCS 8503140190
Download: ML20099F334 (1)


Text

b_  %

1 l U-0725

[/[;sb'//

0982-L

(' k L30-84 (08-06)-L

e ri  !

!.1 i

' /. -/

S POWER COMPANY 1 L CLINToN Powtm 5f AfiON. P.o 00s 678. CLtNToN. ILLtNois 61727 1, .'

p August 6, 1984

l. .QM

%I t.+

\

2 ' ~,' Docket No. 50-461 IDirector of Nuclear Reactor Regulation '

1, l

'i, , Attention: Mr. A. Schwencer, Chief

, , l

  1. J. Licensing Branch No. 2
'pivision of Licensing

$U.S.NuclearRegulatoryCo= mission i Washington, D. C. 20555 A '

ASubj ect: Clinton Power 3tation Unit 1 i

- Documentation Review, Containment Liner / Pedestal

Dear Mr. Schwencer:

s. t.
5. '

In accordance with Illinois Power letter U-0572 f rom C. E. Wuller I

7 :to C. O. Thomas of the NRC dated October 29, 1982, an independent .

review of 25% of the fabrication / erection documentation of the reactor 7, vessel pedestal / containment liner for Clinton Power Station Unit I has f f

e .,been completed. The review, conducted by an authorized nuclear '

i' finspector employed by the Hartford Steam Boiler Inspection and Insurance Twenty-six l ~

(.jiCompany,revealedthatnomajornonconformanceswerefound.

minor nonconforming conditions were identified. They have since been dispositioned. ,

Based on the small number of minor nonconformances found in the large number of documents examined, we believe that the 25% reviev level The issuf[icient to establish that the documentation is satisfactory.

results of the independent review are available for your examination.

Should you have any questions, please contact me.

1 Sincerely yours,

& $. f {s - '

Pi' Daniel 1. Herborn jl

'k., Director - Nuclear Licensing 5

" ' * - and Configuration 4 Nuclear Station Engineering i t

-l.:;

f DIH/JBC/lm [

t -

~

J' ,

. cc :

B. L. Siegel, NRC Clinton Licensing Project Manager j f ,' '

NRC Resident Office g l

Regional Administrator, Region III, USNRC DESIGNATED ORIGINAll 2 l

1 Illinois D,epartment of Nuclear Safety ye p '

f a Certified gy jy, ,3 f(,

f _

_ h

  • *;.' B503140190 840806 L P. PDR ADOCK 05000461 [.

A pDR

- EM. . . , . _ _ c