ML20099F295
| ML20099F295 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 08/04/1992 |
| From: | ENTERGY OPERATIONS, INC. |
| To: | |
| Shared Package | |
| ML20099F283 | List: |
| References | |
| NUDOCS 9208120231 | |
| Download: ML20099F295 (4) | |
Text
..c m a,15 n
m~uA n-a
>-a.s
_a a
4 i
4 l
I l
PROPOSED TECHNICAL SPECIFICATION CilAH(15 e
t r
t 1
4
?,
' 9208120231 920004
- PDR ~ADOCK 05000260.
P,-
=c q.
g g
Y w
x n
h l'LMh ElliIfd1S -
1.,;,tifAG2NCY FEEDWAT1;E_jlETR1 L1H! TING CONDITION FOR OPERATION 3.7.3.2 - Two ciuergency feodwater pumps and ast.ociated. flow paths shall bo OPERABi.E with:-
- a. One motor driven pump capabin of being powered from an OPERALLE
-emergency bus, and g
- b. One turbino driven pump capable of being powered from an OPERABLE steam' supply system.
APPL 10$LILITYi H0!)ES 1, 2, and 3
]
P AUJ108:
Ifth ono nmorgency fondwater pump inopertible, restore the inoperabin pump
-to OPERADLELatatus within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in ll0T SliUTDOWN wfthin the next 12 thours.
6 SURVEILLANCE REQUIREMENTS
'4'.7.1.2 Each emergency fondwater pump shall be demonstrated OPERABLE:
a At least once por 31 days by:
- 1. Verifying that the turbine driven pump delivers a flow of 2'485 gpm.which'is capable of being supplied to the steem
. generators at'a dischargo pressure of 21200 psig when steam
. generator pressure is greater then 800 psia. The provisions--
J of-:Specdfication 4.0.4 aro not applicable.
t-
?..- Verifying th'at:the olectric driven pump delivers a flow of 2485 gpm which is capabin of being supplied to the steam-generators at a dischargo pressure of 21200 psig..
.3. Verifying:tlhat. each valvo (manual, power oporated or automatic)~in'the flow path that is not. locked, scaled, or
. otherwisn-secured in position. -is.fn its correct position.
d t
" ARKANSAS '. UNIT
?.-
3/4 7-5 Amendment No. 5J, p(
)
'en 4
y
,,,y
,,y,
p f, j.
-. x -
t
+
t
/ I q
r l 8,
t; Y
(?
3 t
i.
. \\
t j; p
- f. :,
j s
9 i
e b;
_HARKUP'0F CURRENT ANO-2 TECilNICA1, SPECIFICATION
't
- i
-(FOR INF9 ONLY) i r
V T-I a
s
+
.o
- i 4'
t 1
}
A PJ ll 1
i
- l f,
=l m
a y ;c s
p_
1 i;o h.a
l
' i
.j t
,.f-p 3
I k-p;
- i. i S-
_,\\*.
..m I
,i l
13
,<l l
I ow
-;f.-
.l
.l s
w
=
1
~
l,,I
. f,.~fbly-i.
.m J..
p 03461 PLANT SYSTEMS EMERGENCY FEEDWATER SYSTEM UMITINGCONDITIONf0_R_OPERAT10N 3.7.L2-Two emergency feedwater pumps and associated flow pathg shall be OPERABLE with:
a.
One motor driven pump capable of being powered f rom an OPERABLE emergency bus, and b.
One turbine driven pump capable of being powered from an OPERABLE steam supply system.
APPLICABILITY:
MODES 1, 2, and 3 ACTION:
With one emergency feedwater pump inoperable, restore the inoperable pump to OPERABLE status witnin 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
jjgVEliLANCE REQUIREMENTS 4.7.1.2' Each emergency feedwater pump shall be demonstre ted OPERABLE:
- a.
_At least once per 31 days by:
1.
Verifying that the turbine driven pursp delivers a flow of.
1 485 gpm which is capable _of being supplied to the steam genegors at 'a g3N4y pressure is greater than31200 psig en 4ht-ischarge pressure of sect __$ J T?
psiI.
The provisions of Specification 4-,0.4 are not applicable.
2.
-Verifying that the electric driven pump delivers a flow of 2.485 gpm which is capable of being supplied to the steam generators at a discharge pressure of 3,1200 psig.
3.
Verifying'that each valve (manual, power operated or l
automatic) in the flow path that is not-locked, sealed, or otherwise secured in position,-is-in its correct position.
l M
e i
L l
-ARKANSAS - UNIT 2 3/4 7-5 Amendment No. 51
.