ML20099F362 April 06, 2020 Monticello Nuclear Generating Station -Request for Information for the Upcoming Post-Approval Site Inspection for License Renewal (Phase IV)

Inspection Procedure: IP 71003, Post-Approval Site Inspection for License Renewal (Phase IV)

Inspection Dates: May 26 - 29, 2020 (in office prep; Tentative)

June 1 - 5, 2020 (on-site; Tentative)

Inspection Report: 05000263/2020014; Lead Inspector: Jorge Corujo-Sandin (Lead), Reactor Inspector Please note, the dates discussed here are subject to change due to the ongoing COVID-19 situation. The team leader and/or responsible Branch Chief will communicate with the site to provide further updates. If there are difficulties/delays providing the information requested here, due to COVID-19, please reach out to the Team Lead as soon as practicable.

On June 1, 2020 the U.S. Nuclear Regulatory Commission (NRC) will begin a Post-Approval Site Inspection for License Renewal (Phase IV) at Monticello Nuclear Generating Station. The purpose of the inspection is to review the implementation of the aging management program elements during the Period of Extended Operation (PEO). The inspection team will select for review a sample of the sites Aging Management Programs (AMPs).

This Request for Information (RFI) is separated into three Sections (A, B and C). Section A information will be used to facilitate the AMP sample selections. The team leader will make AMP selections and inform the licensee. Based on these selections, the licensee will provide the additional information requested under Section B. This information will be used as part of the inspection preparation and implementation. Requests under Section C should be available to the inspectors during the on-site week of inspection. See the table below for specific dates:

Requested Action: Expected Date:

Licensee provides Section A Information April 24, 2020 Team Leader communicates selection to the licensee May 4, 2020 Licensee provides Section B Information May 20, 2020 Licensee provides Section C Information June 1, 2020 Due to the ongoing COVID-19 situation please provide the information requested utilizing your IMS CERTREC system or similar. If this is not possible, please reach out to the Team Leader.

The Branch Chief responsible for this inspection is Ms. Ann Marie Stone. She can be reached at 630-829-9729 or AnnMarie.Stone@nrc.gov.

If there are any questions regarding this RFI, please contact the lead inspector Mr. Jorge Corujo-Sandin at 630-829-9741 or Jorge.Corujo-Sandin@nrc.gov as soon as possible.

A. Information Requested to Facilitate Aging Management Program (AMP) Sample Selection (1) Provide copies of corporate and/or site-specific program document/procedure related to overall aging management program.

(2) Provide a list of all site AMPs.

(3) Provide list of AMPs that were new or enhanced in the License Renewal Application (LRA)

(4) Provide list of AMPs that had commitment changes since entering the PEO.

(5) Provide list of AMPs that have incorporated newly identified SSCs since entering the PEO.

List or describe which SSCs were incorporated.

(6) Provide list of AMPs that have incorporated components from One-Time Inspection activities since entering the PEO.

(7) Provide any self-assessments and/or audits related to license renewal program implementation and/or AMP effectiveness.

(8) Provide a list of corrective action documents that were initiated as result of license renewal activities, self-assessments, and/or audits. (since entering the PEO)

(9) Electronic copies of Updated Final Safety Analysis Report, Technical Specifications, Technical Specifications Bases, Technical Requirements Manual, and Individual Plant Examination of External Events (IPEEE) if available.

(10) Site-specific responses and/or evaluations for NRC generic communications associated with license renewal that were issued after entering the PEO.

(11) Risk-ranking of top 250 basic events from your internal and external (if available) events site specific probabilistic safety analysis (PSA) sorted by Birnbaum Importance, Risk-Reduction Worth, Risk-Achievement Worth, and Fussell-Veseley (as applicable) (Provide in Excel format). Include basic event names/description.

(12) Provide a list of the top 10 risk important systems for the internal events model (and external, if available).

B. Information Requested for each AMP Selected for Review (As Applicable)

(1) Program basis documents and administrative procedures describing key program attributes such as program objectives, scope, detection and monitoring methods, administrative controls, acceptance criteria, corrective actions, and scope expansion requirements (2) Provide a summary document listing which implementing procedures are included in the selected AMP and what are their required performance frequency.

(3) Copies of implementing procedures for program activities (e.g. visual examination procedures, ultrasonic examination procedures, maintenance procedures, system walkdowns, etc.)

(4) Completed Work Orders (WOs) for the most recent aging management activities performed, including associated inspection and testing reports, as applicable. This request is limited to the last two completed activities (per procedure). If this request becomes too onerous based on the number of WO reach out to the lead inspector for additional scope clarification.

(5) Copies of aging related corrective actions documents associated with the selected AMP, and SSCs under its purview (for the last three years). A search of corrective actions documents should include keywords such as: aging, age management, degradation, wear, delamination, peeling, crazing, chipping, leak, crack, corrosion, rust, leaching, embrittlement, fatigue, blister, spalling, oxidation, loss of function, failed acceptance criteria, flow-accelerated, or other site specific terms/codes used in aging monitoring as appropriate.

(6) Updated license renewal scoping drawings showing the SSCs within the scope of the AMP (7) Gap analyses performed (if any) to assess the differences between the current AMP and the recommendations in the latest revision of NUREG-1801, Generic Aging Lessons Learned (GALL), and subsequent Interim Staff Guidance (8) Copy of evaluations performed for applicable external and internal operating experience (OE) issues associated with license renewal. This request is limited to OE items issued after entering the PEO.

(9) Description of instances where examination scope expansion was required based on the examination of a SSC in accordance with the AMP. Please describe the logic to select the scope expansion, and any resulting changes to the AMP. (This request is limited to work performed in the PEO)

(10) Description of instances where AMP examinations/inspections were eliminated or deferred. (This request is limited to work performed in the PEO)

(11) Description of instances where examination/inspection scope changes were required based on limitations encountered during the examination. (This request is limited to work performed in the PEO)

C. Information Requested to be available during the onsite week of inspection (1) Provide a brief presentation (informal) to the inspection team regarding aging management at the site. Topics to be covered:

a. How are aging related issue identified, documented and evaluated within the corrective action program and/or other aging tracking software/program.
b. Describe which individuals and/or organizations are responsible for identifying and evaluating aging related issues.
c. Describe the responsibilities regarding age management, if any, of the following:
i. System Engineers ii. AMP Owners iii. Corporate office Ideally, this should be presented Monday or Tuesday of the inspection week. Coordinate with the team leader for further detail.

(2) Copy of simplified system drawings (a.k.a. Horse Notes or Training Notes).

(3) A computer with network access to the sites corrective action program