ML20099F221
| ML20099F221 | |
| Person / Time | |
|---|---|
| Site: | Perry, Columbia, Seabrook, Waterford, South Texas, Comanche Peak, Midland |
| Issue date: | 07/12/1977 |
| From: | Pinsky G OWENS-CORNING FIBERGLAS CORP. |
| To: | Kniel K Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20099E716 | List: |
| References | |
| FOIA-91-469 NUDOCS 9208120185 | |
| Download: ML20099F221 (3) | |
Text
I r
p,,
/A A r. >
hBEN_.
/"* !
OWENS CORNING FIDERGLAS CORPORATION P. O. Dox tita, sHAWNE E MILStoN. KANLAs (tm PMoNt 1913) if July 12, 1977 t
...e..
b
' t 'g. y\\.h t.I lf*
,/
. g!
7
,/
N Mr. Karl Kniel
/fff g'.f
.\\
l Nuclear. Reactor Regulation fg e g/
' )
Division of Project Management
[
U. S. Nuclear Regulatory Commission y.
p.N t
i
/
s}
Washington, D.C.
20555 9
Dear Mr. Kniel ff
.j[
We would like the U. S. Nuclear Regulatory Commissicq to review our Topical Report for our Nuclear Containment Area Insulation System (Tu'K'on).
An
' " *~'"
_ abstract-of__the Topical Report is attached.
We have been in contact with Jim Snell and he is fully acquainted with our
-system.
Jim has suggested, and we agree, that we should make a formal technical presentation of our system to all those who will-be involved in the review process. We would like to make this' presentation when we submit
~~~
our Topical Report.
We hope this can be arranged the first week in August.
Our Nu'K'on insulation system has been completely developed and tested. The
' industry is.becoming excited about our system because we of fer both eco-nomic and technical advantages over systems used in the past. We began intensive marketing of our system in January of this year.
The industry's
' interest is clearly demonstrated by the following list of projects we have or will be allowed to bid on J_0 B, BID TO Midland #1 & 2 Bechtel
' Perry #1 & 2 Cleveland Electric illuminating System's '80' Equipment Combustion Engineering Comanche Peak #1 & 2 Texas Utilities Services, Inc.
Seabrook #1 &'2 United Engineers & Constructors Waterford #3 Ebasco
. WPPSS #3 6 5 Ebasco WPPSS #1 & 4 United Engineers & Constructors South Texas Project #1 & 2 Brown & Root In addition,- we are being technically evaluated for the bidder's list on ten
.(10) other projects.
t 920B12018S 911213 M
-469 PDR:
l'.
-+,...a
- ....m..,
Although we have not yet received a purchase order for our total system, Cleveland Electric Illuminating has given technical approval for the purchase of our material:
~ * "
- to be used on major piping penetrations for the Perry #1 6 2 projects.
If you need any additional information er if I can be of sny assistance, please contact me at (800) 255-6866.
Yours truly.
OWENS-CORNING FIBERCt.AS CORPORATION POWER & PROCESS CON 1 FACTI!iG SERVICES
/ ed.s au Gordon P. Pinsky i.
Nuclear Systems !4anager GPP:ja 1w N
a#@M'%A P
m
- - ~ ' '
... - ~
7 i
~
)
~
_ARSTRACT Owens-Corning Fiberglas' tiucicar Containment Insulation System (Nu'K'on) is a thermal insulation system designed for nucicar piping and equipment.
This Topical Report illustratca that the Nu'K'on system will not cause the malfunction of any component or Icad to a health hazard during normal operations; and, will not_ retard the operation of any cmergency system or complicate the ef fects of an accident when used in light water nucicar po..er plants.
The report includes a listin8 of both normal and accident design conditions; a complete potential problera analy-sin for insulation in generall description and analysis of the specific testing program used; a listing of all results and conclusions; and recoranendations for the general evaluations of inculation systems for saf ety performance.
4 v
$4 ;
e--
O
., - ~ _ _ - _ -.
.-