Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20100F430 + (10:56:51, 13 December 2024)
- ML20100F425 + (10:56:52, 13 December 2024)
- ML20100F419 + (10:56:54, 13 December 2024)
- ML20100F401 + (10:56:54, 13 December 2024)
- 05000325/LER-1996-002, :on 960123,manual Reactor Scram Occurred Due to Main Turbine Vibration.Caused by Rubs in the Lpt Diaphram & Shaft Packing.Addl Vibration Monitoring Equipment Installed + (10:56:56, 13 December 2024)
- ML20100F388 + (10:56:57, 13 December 2024)
- ML20100F382 + (10:56:58, 13 December 2024)
- ML20100F380 + (10:56:59, 13 December 2024)
- ML20100F374 + (10:57:03, 13 December 2024)
- ML20100F366 + (10:57:04, 13 December 2024)
- AECM-85-0099, Forwards Final Response to NRC 841212 Request for Addl Info Re BWR Owners Group Rept,In Response to NUREG-0737,Item II.D.1, Analysis of Generic BWR Safety Relief Valve Operability + (10:57:05, 13 December 2024)
- ML20100F363 + (10:57:06, 13 December 2024)
- ML20100F359 + (10:57:06, 13 December 2024)
- ML20100F358 + (10:57:07, 13 December 2024)
- ML20100F352 + (10:57:08, 13 December 2024)
- ML20100F348 + (10:57:09, 13 December 2024)
- ST-HL-AE-5283, Responds to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (10:57:10, 13 December 2024)
- ML20100F338 + (10:57:11, 13 December 2024)
- ML20100F319 + (10:57:12, 13 December 2024)
- BSEP-84-2098, Responds to NRC Re Violations Noted in Insp Repts 50/324/84-17 & 50-325/84-17.Corrective Actions:Agreement Ltrs & Procedure Revised & Will Be Sent for Review to Site Emergency Coordinator + (10:57:13, 13 December 2024)
- RBG-42462, Forwards Rev 0 to River Bend Station,Cycle 7,COLR, Feb 1996 & Rev 0 to 24A5188, Supplemental Reload Licensing Rept for River Bend Station Reload 6,Cycle 7 + (10:57:14, 13 December 2024)
- ML20100F316 + (10:57:14, 13 December 2024)
- ML20100F305 + (10:57:15, 13 December 2024)
- ML20100F304 + (10:57:16, 13 December 2024)
- ML20100F303 + (10:57:16, 13 December 2024)
- NSD-NRC-96-4643, Forwards Proprietary Info on Accident Specification & Phenomena Evaluation for AP600 Passive Containment Cooling Sys.Encl Provided in Response to NRC Request Made at 951206 Meeting.Encl Withheld (Ref 10CFR2.790) + (10:57:17, 13 December 2024)
- ML20100F297 + (10:57:18, 13 December 2024)
- ML20100F295 + (10:57:20, 13 December 2024)
- ML20100F294 + (10:57:21, 13 December 2024)
- PMNS20200350, 2019 Annual Assessment Meeting + (10:57:22, 13 December 2024)
- ML20100F289 + (10:57:23, 13 December 2024)
- ML20100F288 + (10:57:23, 13 December 2024)
- ML20100F287 + (10:57:24, 13 December 2024)
- ML20100F284 + (10:57:25, 13 December 2024)
- ML20100F282 + (10:57:26, 13 December 2024)
- ML20100F281 + (10:57:27, 13 December 2024)
- ML20100F276 + (10:57:28, 13 December 2024)
- SNRC-1115, Application for Amend 52 to OL Application,Consisting of Rev 34 to FSAR + (10:57:32, 13 December 2024)
- ML20100F269 + (10:57:33, 13 December 2024)
- HL-5108, Forwards 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (10:57:34, 13 December 2024)
- ML20100F264 + (10:57:35, 13 December 2024)
- ML20100F258 + (10:57:36, 13 December 2024)
- ML20100F262 + (10:57:36, 13 December 2024)
- ML20100F250 + (10:57:37, 13 December 2024)
- 05000348/LER-1985-001-01, :on 850214,unsealed Gaps Discovered Between Tops of Two Masonry Fire Walls & Room Ceilings.Cause Unknown.Design Changes Developed to Seal Gaps + (10:57:39, 13 December 2024)
- ML20100F230 + (10:57:41, 13 December 2024)
- ML20100F234 + (10:57:41, 13 December 2024)
- ML20100F225 + (10:57:42, 13 December 2024)
- ML20100F221 + (10:57:43, 13 December 2024)
- ML20100F210 + (10:57:44, 13 December 2024)
- 05000260/LER-1985-001-03, :on 850221,removal of Thermocouple Revealed 1-inch Long Wall Crack at Weld Located at Junction of Recirculation Sys Header & Riser.Cause Unknown.Crack Will Be Repaired by Weld Overlay + (10:57:46, 13 December 2024)