Interim Deficiency Rept (55(e)-84-17) Re Effect of Termination Cables on Seismic Qualification of Class 1E HPCS Battery Supplied by Ge.Initially Reported on 841022.Final Rept Will Be Submitted by 850222
ML20100F210
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/21/1984
From: Hooten B
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
(55(E)-84-47), (NMP2L-0256), NUDOCS 8412060493
Download: ML20100F210 (2)


Text

.-

y M V NIAGARA R UMOHAWK NBAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST. SYRACUSE, N Y.13202/ TELEPHONE (315) 474-1511 November 21, 1984 (NMP2L 0256)'

Mr. R. W. Starostecki, Director-U. S. Nuclear Regulatory Commission Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA _19406 Re: Nine Mile Point - Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

Enclosed is an interim report in accordance with 10CFR50.55(e) for the problem concerning High Pressure Core. Spray System battery

-terminations. This problem was reported via tel-con to S. Collins of your staff on October 22, 1984.

Very truly yours, B. G. Hooten Director Nuclear Operations BGH/GG:saa xc: ' Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 R. Gramm, NRC Resident Inspector Project File-(2)

KOOhokfo PDR.

I i

1 Ji JL4L__.

m y.

NIAGARA MOHAWK POWER CORPORATION

'NINE MILE POINT-- UNIT 2

~ DOCKET NO. 50-410 Interim Report for a Problem Concerning High Pressure _ Core Spray System Battery (Terminations (55) e)-84-47)

Description of the Problem

- The problem ~ concerns the effect of-the termination cables on the seismic qualification of.the Class 1E High Pressure Core Spray System battery, Mark

. No. 2BYS* BAT 2C/BYS, supplied by General Electric Company..

One -750 KCM external cable per pole was used.

This condition was identified during -

Inspection No. 50-410/84-11.

IEEE 344-1975 also states that tha effect of--

electrical connections, conduit, sensing lines, etc. shall be considered.

In. addition, subsequent to the --identification of.the above condition, it was

- observed that three battery cell connection posts were damaged.

This damage

- is believed to have occurred due to the use of 750 KCM cable.

The matter is still under investigation and a final report will be submitted by February 22, 1985 d