Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000382/LER-1992-003-03, :on 920327,unplanned Actuation of ESF Portion of Control Room Ventilation Sys (CRVS) Occurred,Causing CRVS to Isolate.Cause Not Determined.New resistor-capacitor Filters Installed + (10:14:44, 13 December 2024)
- 05000368/LER-1992-003-02, :on 920501,initiated Manual Reactor Trip After Mismatch in Charging & Letdown Flowrates Observed.Cause Unknown.Cause for Recurring High Dp Identified by 920901. Procedure 2203.012L Revised + (10:14:46, 13 December 2024)
- BVY-96-018, Monthly Statistical Rept for Feb 1996 for VT Yankee Nuclear Power Station + (10:14:48, 13 December 2024)
- ML20101B207 + (10:14:51, 13 December 2024)
- ML20101B206 + (10:14:52, 13 December 2024)
- ML20101B200 + (10:14:53, 13 December 2024)
- ML20101B192 + (10:14:54, 13 December 2024)
- ML20101B191 + (10:14:54, 13 December 2024)
- ML20101B187 + (10:14:55, 13 December 2024)
- ML20101B181 + (10:14:57, 13 December 2024)
- HL-5124, Forwards Monthly Operating Repts for Feb 1996 for Ei Hatch Nuclear Plant Units 1 & 2 & Revised Page E1-2 for Jan 1996 MOR + (10:14:58, 13 December 2024)
- 05000374/LER-1984-074-01, :on 841116,reactor Water Cleanup Isolation Received from Leak Detection High Ambient Temp Switch.Caused by Spurious Voltage Spike Generated When Thermocouple Wire Moved to Attach Test Equipment Leads + (10:14:59, 13 December 2024)
- ML20101B157 + (10:15:01, 13 December 2024)
- NSD-NRC-96-4662, Submits Response to NRC Requests for Addl Info on AP600 Design Certification Program,Including 10 follow-on Questions Re Level 1 PRA Topics & 2 follow-on Questions Re Accident Mgt + (10:15:01, 13 December 2024)
- ML20101B144 + (10:15:02, 13 December 2024)
- ML20101B119 + (10:15:03, 13 December 2024)
- ML20101B109 + (10:15:05, 13 December 2024)
- ML20101B114 + (10:15:05, 13 December 2024)
- ML20101B103 + (10:15:06, 13 December 2024)
- ML20101B099 + (10:15:07, 13 December 2024)
- U-601965, Annual Environ Operating Rept,1991 + (10:15:08, 13 December 2024)
- 2CAN049208, Forwards Addl Info to Support 890831 Relief Requests from First 10-yr Inservice Insp Interval Consisting of Listing of Limited Inservice Insp Exam Coverage Estimates for First Insp Interval + (10:15:09, 13 December 2024)
- ML20101B087 + (10:15:09, 13 December 2024)
- ML20101B085 + (10:15:10, 13 December 2024)
- PY-CEI-NRR-1486, Special Rept:On 920315,small Earthquake Occurred 4 Miles Northwest of Plant.On 920323,seismic Recorders Removed from Svc & Remained Inoperable for More than 30 Days.Several Instrumented Locations Available to Record Motion + (10:15:11, 13 December 2024)
- ML20101B083 + (10:15:12, 13 December 2024)
- 2CAN049205, Revises 910627 Application for Amend to License NPF-6, Changing TS 3.8.2.5 & Associated Bases Re Containment Penetration Conductor Overcurrent Protective Devices,Per NRC Request + (10:15:13, 13 December 2024)
- ML20101B080 + (10:15:13, 13 December 2024)
- ML20101B075 + (10:15:14, 13 December 2024)
- ML20101B072 + (10:15:16, 13 December 2024)
- ML20101B063 + (10:15:17, 13 December 2024)
- ML20101B062 + (10:15:18, 13 December 2024)
- ML20101B061 + (10:15:19, 13 December 2024)
- ML20101B059 + (10:15:19, 13 December 2024)
- 05000219/LER-1984-029, :on 841105,TN-9 Spent Fuel Shipping Cask Lifted by 100 Ton Capacity Reactor Bldg Crane Above Top Plate W/Unadjusted Vertical Limit Switches.Caused by Deficient Procedure.Personnel Reinstructed + (10:15:22, 13 December 2024)
- ML20101B055 + (10:15:23, 13 December 2024)
- 05000413/LER-1984-019-02, :841108,closed Inlet Valve to Vent Sampling Pump Prevented Continuous Sampling.Caused by Personnel Error.Inlet & Outlet Valves Locked Open + (10:15:26, 13 December 2024)
- RBG-19655, Interim Deficiency Rept DR-261 Re Auxiliary Contacts on Ite Rowan Relays Supplied by Gould Brown-Boveri.Next Rept Will Be Submitted by 850214 + (10:15:27, 13 December 2024)
- ML20101B042 + (10:15:28, 13 December 2024)
- ML20101B043 + (10:15:28, 13 December 2024)
- ML20101B033 + (10:15:30, 13 December 2024)
- ML20101B030 + (10:15:34, 13 December 2024)
- ML20101B027 + (10:15:35, 13 December 2024)
- ML20101B023 + (10:15:36, 13 December 2024)
- ML20101B020 + (10:15:37, 13 December 2024)
- ML20101B018 + (10:15:37, 13 December 2024)
- RBG-19654, Final Deficiency Rept DR-160 Re Lugs Connecting Potential Transformer Leads to 5-kV Emergency Switchgear Buses Supplied by Gould.Initially Reported on 841107.Engineering & Design Coordination Repts Issued to Replace Leads & Lugs + (10:15:38, 13 December 2024)
- TXX-9219, Suppls 880708 & 890526 Responses to NRC Bulletin 88-004 Re Potential safety-related Pump Loss.Mod to Chemical & Vol Control Sys Consists of Replacing Four Diaphragm Valves W/ Globe Valves in Min Flow Recirculation Line + (10:15:39, 13 December 2024)
- ML20101B012 + (10:15:40, 13 December 2024)
- ML20101B009 + (10:15:44, 13 December 2024)
- ML20101B001 + (10:15:45, 13 December 2024)
- ML20101B000 + (10:15:46, 13 December 2024)