Text
o i
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRAT'VE
SUMMARY
OF OPERATIONS NOVEMBER There were no unit shutdowns or significant power reductions during the month of November.
The following major safety-related maintenance was performed in the month of November:
1.
Performed miscellaneous corrective and preventive maintenance on diesel generators.
8412200163 841130~
PDR ADOCK 05000364 R
pyg lff
JU-JU4 UNIT.
2 i
~
12-5-84 DA21 COMPLETED SY J. D. Woodard (205) 899-51564 TELEPHONE November, 1984
.40E!
DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL
@lWe Net)
(MWe-Net) 818 g,
g7 837 2
823 13 826 J
~
-- f4 - --
g9_.
4' 827 gg 835 3
828 21 919 836 840 w
6 832 7
23 839 g
838 24 R14 9
91s 25' ou 828 10 26 823 II 836 27 819 834 g3 gu 3
l3 AnA
- 9 839 839 14 30 817 IS 834 3;
16 81n i
R G UCUONS On tiiis form:r. list the 2ver:ge d:ly. nit power !cvelin MWe Nc! fut e:ch d:y in the reporting month.C.2mpute to 4
, the ne:re:t whole me;: wast.
(9p7)
I l
l
~
I J
4 V)
OPERATING DATA REPORT
(
DOCKET NO.
50-364 DATE 12-5-84 COMPLETED BY J.D. Woodard TELEPHONE (9nsi R99-5156 OPERATING STATUS
- 1. Unit Name:
J seph M. Parley - Unit 2 Notes
- 2. Reporting Period:
h amhne 14AA I)' Cumulative data since
- 3. Licensed Thermal Power (MWt):
2652 7-30-81, date of '
- 4. Nameplate Rating (Gross MWe):
860 commercial operation, 829
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe): 852.5 809.1
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through i) Since Last Report, Give Reasons:
N/A N/A
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reso.s For Restrictions. If Any:
N/A 7N This Mo' nth Yr..to.Date Cu ulative
- 11. Hours In Reporting Period 720 8,040 29,281
- 12. Number Of flours Reactor Was Critical 720.0 7,646.8 26,189.6
- 13. Reactor Rewrve Shutdown Hours 0.0 0.0, 138.0
- 14. Hours Generator On Line 720.0' 7.562.5 7s.861.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0 O.0
- 16. Gross The mal Eriergy Generated (MWH) 1,906,767
'19,743,227 65',08'1,071
- 17. Gross Electrical Energy Generated (MWH) 626,882 6.382,032 21,368.908
- 18. Net Electrical Energy Generated (MWH) 598,478 A n7n 7An 9n 97n vnA
- 19. Unit Service Factor 100.0 94.1 88.1
- 20. Unit Availability Factor 100.0 94.1 88.3
- 21. Unit Capacity Factor (Using MDC Net) 102.7 93.3 85.6 100.3 91.1 83.5
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate n.n s.o ss
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
Refuelinc/ maintenance outnee 1/4/85. nonrnrimntelv 5% veeks.
i
- 25. If Snut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved h
INITIAL CRITICALITY 05-06-81 05-08-81 UD-24-0I UD-2N-01 INITIAL ELECTRICITY COMMERCIAL OPERATION 08-01-81 07-30-81 en n
DOCK ET NO.
50-364 UNIT SIIU1 DOWNS AND POWER REDUCT10NS UNIT NAhlE J.M. Farlev-Unit 2 DAIE 12-5-84 COhlPLET ED llY
.T n. Unnanra REPORT MONill November. 1984 TEl.LPil0NE. One Aqq s196 w.
E E
jg
}
}s_EE5 Licensee g r,
{n.
Cause & Corrective 2
Event p
g'8 Action to No.
Date g
3g mO U
Prevent Reeverence H
yE 5
jg Report
- g 6
THERE WERE NO I NIT SHUTDOWNS OR SIGNIFICANT POWER REDUCT: ONS DURIL G THE MONTE OF 30VEMBER.
4 I
2 3
4 F: Forced Reason:
hiethod:
Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1.hlanual.
for Preparation or Data ll klaintenance of Test 2 Manual Scram.
En y Shecis for I.icensee C Ilefueling 3 Automatic Scram.
Event ReporI (1. Ell) File (NUREG- '
D llegulatosy Resiriction 4 Other (Explain) 0161) i E-Operator Tsaining & I.icense Examination F Administrative 5
G Opciational Error (lixplain) lishibis I Same Somee (9/77) ll Othes (Explain)
MalHng Address
- Alab ms Pow;r Comp ny 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building AlabamaPower thesoutr rne:ectncsistem e
December 10, 1984 Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attauned are two (2) copies of the November 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of Appendix A of the Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very truly, s'
R. P. Mcdonald RPM /KWM: sam Enclosures xc: Director, IE (10 copies)
Director, RII (1 copy) lj l
,