Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BSEP-96-0097, Monthly Operating Repts for Feb 1996 for BSEP + (10:06:04, 13 December 2024)
- ML20101D420 + (10:06:10, 13 December 2024)
- 05000354/LER-1995-038-02, Forwards LER-95-038-02 Re Failure to Comply W/Required Action Statement Upon Removal of Failed Snubber on RHR Shutdown Cooling Line.Suppl Updates Corrective Actions + (10:06:13, 13 December 2024)
- ML20101D417 + (10:06:14, 13 December 2024)
- ML20101D415 + (10:06:15, 13 December 2024)
- RC-96-0072, Forwards Summaries & Conclusions for Evaluations Performed on SFP Cooling Subsys to Support Acceptability of SFP Peak Temps + (10:06:15, 13 December 2024)
- AECM-84-0528, Forwards Amend 2 to Indemnity Agreement B-72.Amend Deletes Item 3 & Substitutes Listed Licenses + (10:06:16, 13 December 2024)
- ML20101D408 + (10:06:17, 13 December 2024)
- ML20101D406 + (10:06:17, 13 December 2024)
- 05000354/LER-1996-001, :on 960113,safety & Turbine Acs Heat Exchangers Fouled W/Detritus Occurred Due to Failed Svc Water Strainer. Strainers Replaced & Enhanced Maint & Design Mod + (10:06:20, 13 December 2024)
- ML20101D401 + (10:06:21, 13 December 2024)
- ML20101D396 + (10:06:22, 13 December 2024)
- ULNRC-03346, Transmits Relief Requests R-1a,E-3a,E-4a,E-6 & E-7 to ISI Program Plan.Relief Requests Submitted Based on Insp Results from Refuel 7 & Represent Final Relief Requests for First ten-yr Insp Interval + (10:06:22, 13 December 2024)
- ML20101D376 + (10:06:23, 13 December 2024)
- NLS8400290, Responds to 841026 Request for Plans & Proposed Schedules to Implement Improvements in Water Level Measurement & Instrumentation Sys to Improve Reliability & Accuracy,Per Generic Ltr 84-23.Analog Equipment Will Be Installed + (10:06:26, 13 December 2024)
- ML20101D355 + (10:06:27, 13 December 2024)
- NSD-NRC-96-4666, Forwards Rept on Impact of Fan Cooler Operation on AP600 Aerosol Removal Rates & post-LOCA Aerosol Releases from Containment,In Support of RAI 470.25.Response to RAI 470.25 Scheduled for Completion by 960329 + (10:06:28, 13 December 2024)
- ML20101D335 + (10:06:29, 13 December 2024)
- ML20101D332 + (10:06:29, 13 December 2024)
- ML20101D326 + (10:06:31, 13 December 2024)
- B11394, Forwards marked-up Draft STS for Four Loop Operation of Plant.Draft STS for Three Loop Operation Forthcoming. Requests Meeting Be Arranged W/Nrc for Early Jan 1985 to Discuss Review Process & Future Draft Submittals + (10:06:32, 13 December 2024)
- BSEP-96-0072, Submits Suppl Response to NRC GL 94-02, Long-Term Solutions & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs + (10:06:32, 13 December 2024)
- ML20101D320 + (10:06:33, 13 December 2024)
- ML20101D317 + (10:06:34, 13 December 2024)
- ML20101D316 + (10:06:35, 13 December 2024)
- 05000412/LER-1996-001, :on 960212,PSC Rod Bank Pulse Step Counter Positions Indicating 0 Steps.Caused by Electrical Distribution Sys Disturbance That Occurred 36 H Earlier. Performed Manual Cold Start of PCS + (10:06:37, 13 December 2024)
- ML20101D310 + (10:06:38, 13 December 2024)
- ML20101D307 + (10:06:38, 13 December 2024)
- ML20101D302 + (10:06:39, 13 December 2024)
- ML20101D301 + (10:06:40, 13 December 2024)
- ML20101D300 + (10:06:41, 13 December 2024)
- ML20101D294 + (10:06:42, 13 December 2024)
- ML20101D282 + (10:06:42, 13 December 2024)
- ML20101D281 + (10:06:43, 13 December 2024)
- ML20101D279 + (10:06:44, 13 December 2024)
- 05000454/LER-1984-010-08, :on 841112,boron Dilution Protection Sys Actuated.Caused by Noise Spike Due to Pulling Fuse.Mod to Boron Dilution Protection Sys Being Designed + (10:06:46, 13 December 2024)
- 05000373/LER-1984-076, :on 841111,undervoltage Trip of Reactor Protection Sys Bus a Occurred.Caused by Deenergized Relays & Ruptured Hose.Regulating Transformer Installed to Limit Undervoltage Condition + (10:06:48, 13 December 2024)
- RBG-19626, Interim Deficiency Rept DR-228 Re Cylinder Head Valves in Standby Diesel Generator 1EGS*EG1A Supplied by Tdi.Next Rept Will Be Provided by 850221 + (10:06:50, 13 December 2024)
- ML20101D274 + (10:06:50, 13 December 2024)
- ML20101D263 + (10:06:55, 13 December 2024)
- ML20101D258 + (10:06:55, 13 December 2024)
- ML20101D245 + (10:06:56, 13 December 2024)
- JAFP-92-0435, Special Rept:On 920504,CO2 Fire Suppression Sys Declared Inoperable When Walkdown Revealed That 4 Instead of 5 Nozzles Installed in Sys.Caused by Absence of Design Calculations.Replacement Nozzle Installed on 920518 + (10:06:57, 13 December 2024)
- ML20101D241 + (10:06:58, 13 December 2024)
- RBG-19629, Interim Deficiency Rept DR-168 Re Interpretation of W3 Welding Procedure for Performing Weld Repair.Next Rept Will Be Provided by 850221 + (10:06:59, 13 December 2024)
- RBG-19625, Interim Deficiency Rept DR-193 Re ECCS Suction Lines in Auxiliary Bldg.Next Rept Will Be Provided by 850220 + (10:07:00, 13 December 2024)
- RBG-19628, Interim Deficiency Rept DR-238 Re Installation of Pacific Scientific Snubbers (PSA 35 & 100) & Associated Bergen- Paterson Clamps (PT 6220-50 & PT 6202-120).Next Rept Will Be Provided by 850221 + (10:07:00, 13 December 2024)
- ML20101D225 + (10:07:01, 13 December 2024)
- ML20101D220 + (10:07:02, 13 December 2024)
- 05000254/LER-1996-006, :on 960210,TS 3.0.A Incorrectly Invoked Due to Procedural & Operator Knowledge Deficiencies.Policy Statement Developed & Presented to Licensed Operator Re Expectations for Use & Entry Into TS 3.0.A + (10:07:04, 13 December 2024)
- ML20101D209 + (10:07:05, 13 December 2024)
- ML20101D203 + (10:07:06, 13 December 2024)