---.- --- -. ___ _..___

Georgia Powe* Company l

40 inverness Center Parkway i

' Post Offce Box 1295 j- ' *'

Birmingham Alabama 35201

  • Telephene 205 877 7122 i

C. K. McCoy Georgia Power l

Vce President, Nuclear Vogtle Protect.

the southerrs electic system March 12, 1996 l

LCV-0603-K Docket Nos. 50-424 50-4?5 Tac Nos.

M92131 M92132 i

I U. S. Nuclear Regulatory Commission

' ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT PROPOSED CONVERSION OF Tile UNIT 1 AND UNIT 2 TECHNICAL SPECIFICATIONS BASED ON NUREG-1431 By letter dated May 1,1995, (LCV-0603) Georgia Power Company (GPC) proposed to amend the Vogtle Electric Generating Plant (VEGP) Unit I and Unit 2 Technical Specifications (TS). The proposed changes would, in part, convert the existing VEGP TS to the improved TS for Westinghouse plants as represented by NUREG-1431. Within the scope of this conversion, GPC proposed to relocate the following Administrative Control requirements to the Final Safety Analysis Report (FSAR) Update:

6.2.3, " Independent Safety Engineering Group (ISEG),"

V l

6.4.1, " Plant Review Board (PRB),"

i 6.4.2, " Safety Review Board (SRB),"

6.9,

" Record Retention "

.j In addition, the requirements of Specification 6.7.2 and 6.7 3 related to the review of the procedures of Specification 6.7.1 and changes thereto, would also be relocated to the FSAR 4

Update.

/Bory, U

9603200186 960312 PDR ADOCK 05000424-l

. p PDR

\\: D a

a T

-e

--+7-

. ~..

l U. S. Nuclear Regulatory Commission LCV-06D3-K Page 2 Subsequent to our May 1,1995, submittal, the NRC issued Administrative Letter 95-06,

" Relocation of Technical Specification Administrative Controls Related to Quality Assurance /'

This letter provided NRC staff positions and lessons learned related to the relocation of the above TS requirements. At the request of the NRC staff, and in accordance with the recommendations of Administrative Letter 95-06, GPC states that the above referenced requirements will be relocated with no reduction in requirements to Chapter 17 of the FSAR Update. Future changes i

to these relocated requirements will be controlled in accordance with 10 CFR 50.54(a).

Sincerely, C. K. McCoy CKM/NJS xc:

Georgia Power Comoany Mr. J. B. Beasley, Jr.

Mr. M. Sheibani NORMS LL S. Nuclear Regulatorv Commission i

. Mr. S. D. Ebneter, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle i

. w

..r-