Monthly Operating Repts for Feb 1996 for Catawba Nuclear Station Units 1 & 2
ML20101D302
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 02/29/1996
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20101D292 List:
References
NUDOCS 9603200178
Download: ML20101D302 (10)


Text

. .-

OPERATING DATA REPORT DOCKET NO 50-413 DATE March 15. 1996 OPERATilE STATUS COMPLETED BY R.A. Williams 1 TELEPHONE 704-382-5346 I

1. Unit h ee: Catamba 1
2. Reporting Period: February 1, 1996-February 29,1996
3. Licensed Thereal Power (MWt): 3411
4. Nameplate Rating (Stoss MWe): 13054 Notes
  • Nameplate Rating
5. Design Electrical Rating (Not MWe): 1145 (Brass NWel calculated as
4. Marious Dependable Capacity (Gross MWe): 1192 1450.000 MVA .90 power j
7. Marisan Dependable Capacity (Net MWe):  !!29 factor per Page 111, )
8. If Changes Occur in Capacity Ratings (Itees Number 3 Through 7) Since Last NUREG-0020.- l Report. Give Reasons:

)

9. Power Level To Which Restricted, If Any (Net MWe):  !'
10. Reason For Restrictions, if any:

This Month Yr.-to-Bate Cumulative

]

11. Hours In Reporting Period 696.0 1440.0 93553.0.
12. Number Of Hours Reactor Was Critical 696.0- 1369.1 73662.7
13. Reactor Reserve Shutdown Hours --0-- - --0--
14. Hours Generator On-Line 696.0 1348.9 72437.6
15. Unit Reserve Shutdown Hours --0-- - --0--
16. Gross Thereal Energy Generated (MWH) 2088420 4182470 236132729
17. Gross Electrical Energy Generated (ItlH) 747794 1497392 83400203
18. Net Electrical Eastgy Benerated (MWH) 705303 1411806 79456895
19. Unit Service Factor- 100.0 93.7 77.4
20. Unit Availability Factor 100.0 93.7 77.4
21. Unit Capacity Factor I!! sing i1DC Net) 89.8 86.8 74.0
22. Unit Capacity Factor (Using DER Net) 88.5 85.6 73.2
23. Unit Forced Outage Rate 0.0 6.3 8.2
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling - June 13, 1996 - 99 dsys

25. If Shut Down At End Of Report Period. Estimated late of Startup:
26. linits In Test Status (Prior to Coseercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTR! CITY COMMERCIAL OPERATION 9603200178 960314 ~

PDR ADOCK 05000413 R PDR

1

, OPERAilll6 DATA REPORT l

DOCKET 110 50-413 till!T -Catasha i j BATE March 15. 1996 l

COMPLETED BY R.A.Ililliams 1 TELEPHDIlE 704-302-5346 i

l M0llTH February. 1996 l l

1 E AVERAGE M ILY Poller LEVEL' E AVERAGE MILY P0lER LEVEL q (Mlle*t) (llie-liet) i I 1163 17 4&B 2 1163 il 469 3 1162 - 19 556 I

4 11&1 20 1000 5 1158 21 1168 6' 1152 22 '1158 s

7 1141 23 1157 8 1139 24 1161 ____

9 1154 25. 1163 10 1156 26 1155

!! 1153 27 '1152 12 1150 28 1155 13 1132 29 1162 14 481 i

15- 458 16 459 l

l

4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-413 UNIT NAME Um;antsa 1 .

DATE us/13/sb REPORT MONTH February 1996 COMPLETED BY x. A. nilliams TELEPHONE Ciue)-asz-dasb (1) (2) (3) (4) (5)

R MET- '

E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O WN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N RX NO. CODE CODE PREVENT RECURRENCE 6-P 96- 2-14 F --

B --

EA TRANSF MAIN POWER TRANSFORMER MAINTENANCE 7-P 96- 2-19 F --

B --

IA INSTRU NUCLEAR INSTRUMENTATION SYSTEM /

THERMAL POWER MISMATCH (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Entw Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restriction , ,

4-Other (Explain) File (NUREG-0161))

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

_ _ _ _ . _ _ . _ _ _ _______________.___________________.________________________________s m_ _ _._____.___m

_.____________m _ _ _ _ . _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _

+

DOCKET: 50-413 UNIT: Catawba 1 e

Date: 03/15/96 NARRATIVE

SUMMARY

j MONTH: February,1996 2'

Catawba Unit 1 began the month of February operating at 100% full power. 'Ihe unit operated at or near 4

100% full power until 02/13/96 at 2045, when the unit began decreasing power and held at 45% power on i 02/14/96 from 0240 to 02/19/96 at 1514 for maintenance on main power transformers (Required per unit 2 loss of offsite power event). During power escalation, the unit held at 67% power from 1830 to 2210 due to

' nuclear instrumentation system / thermal power mismatch. The unit returned to 100% full power on 2/20/96

' at 1150 and operated at or near 100% power the remainder of the month.

4 J

4 i

i 4

Prepared by: R. A. Williams Telephone: (704)- 382 5346

~

MONTHLY REFUFI ING INFORMATION REOUEST

l. Facility name: Catawba _ Unit 1
2. Scheduled next refueling shutdown: June 1996
3. Scheduled restart following refueling: Sep**=har 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

l l

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or difTerent design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 191 (b) in the spera fuelpool: SQ
8. Present licensed fuel pool capacity; lill )

Size of requested or planned increase: =

9. Projected date oflast refueling which can be accommodated by present license capacity:

September 2002 l

DUKE POWER COMPANY DATE: March 15.1996 Name of

Contact:

R. A. William

  • Phone: (704)- 382-5346

-1 l

l i

. . 4, .

l i

OPERATING BATA REPORT DOCKET NO 50-414 BATEllarch 15. 1996 GPERATilsliTAIM Coll'LETED BY R.A. Williams TELEPHONE 704-302-5346

-1. Unit Name: Catauba 2

-2. Reporting Period: February 1, 1996-February 29,1996

3. Licensed Thereal Poser (IEft): 3411
4. Naseplate Rating (Bress Igle): 13055 Notes eNaseplate Rating.
5. Design Electrical Rating (llet IRie): 1145 (Stess INiel calculated as

. 6. Maxieue Dependable Capacity (6ress ille): 1192- 1450.000 MVA .90 poser

. 7. Marious Dependable Capacity (Net INie): 1129 .

facter per Page ill,

8. If Changes occur in Capacity Ratings (itses llueber 3 Through 7) Since Last NURE6-M20.

!  : Report. Give Reasons:

. 9. Power Level.To lihich Restricted, if Any (llet Ille):

'10. Reason For Restrictions, if any u.

i This llenth Yr.-to-Date Casulative f

! 11. Hours In Reperting Perled' 696.0 1440.0 83569.0'

.- 12. Ilmeber Of Hours Reacter lias Critical ' 453.3 .1197.3 65363.5~

-  !!3.ReacterReserveShutdownHours --0--  ; 14. lieurs Generator On-Line- 415.1 .'1159.1 64296.7

-15. Unit Reserve Shutdown Hours - . ~- -

l - 16. Sress Thereal Energy Benerated (IIIH) 1387556 3916194' 207332732 i' 17. 8tess Electrical Energy Generated (IllH) 492873 1 4 2297 . 73'M664

-'18. list Electrical Energy Generated (IllH) 462214 1327684 69239941-

19. Unit Service Facter 59.6 80.5 76.9
20. Unit Availability Facter 59.6 00.5 76.9 i 21. Unit Capacity Facter (Using 110C liet) 58.8 -II.7 73.2

'22. Unit capacity Facter (Using DER Wet) 58.0 80.5 72.4

23. Unit Forced Outage Rate W.4 19.5 9.1 j --24. Shutdeen Scheduled Over liest 6 llenths (Type, Date, and Duration of Each): j 4

None

25. If Shut Down At End Of Report Period. Estimated late of Startup:
26. Units In Test Status (Prior to Ceasercial Operation): Ferocast- Achieved j- INITIALCRITICALITY  !

4 Ill!TIAL ELECTRICITY j C0filERCIAL OPERAT1011 I

i t ,

J

=-%i ri-r -, ;r- , , -

.-4 w-- - . - -

g. p

. - - . . . ~ . . . . . . - . . . ..-.~. ....- - . - - -- ..- . .. . . _ . . . . - . ~ - . . . .-.

i

. OPERAi!N M TA REPORT l i i 1 l -

. DOCKET IN) 50-414

! ILili Catada 2 .

MTE Marth 15. I996  !

CS FLETED BY R.A.ll1111a==  !

TELEPlWE 7M-3R2-53M i l'  !

j  !

L  !

llBitTH Februarv. 1996 .

l e,

l

~

! My, . AYERASE MILY P0llER LEVEL- 31 AYERAIE MILY poler LEVEL l'

(llie-itet) (Illie-list) -

L ~1 11&& 17 0 .

'2 1163 II 3&5 '

i .- 3 1165 19 1129

+

4 .- 1L&& 20 1146

.5 1166 21 1153

~

6- 608 22 1151

.. . t 7 0 23- 1151

.i

l.  ;

r

'S 0 M- 1158 l 9 0 25 1163 i

.i

10 0 26 1160 '

t 1

11 0 27 1159 1 I

. 12 0 28 1160 -) ,

. 13 0 29 1167

\ .

14 0 1

15 : 0 16 0 I

i i

I-

. _ . . , _ - . . - J ., _ . . _ . . . . _ , _ __'

.__m. . _.m.. .._ .- ._ . -_ _ _. . _ _ _ _ .-

UNIT SHUTDOWNS AND POWER REDUCTIONS ' DOCKET NO. 50-414 /

UNIT NAME uu; Antea 2 .

DATE ud/1d/sb REPORT MONTH February 1996 COMPLETED BY x. A. williams TELEPHONE t ius ; -s ese-ose 6 (1) (2) '(3) (4)' (5)

R MET-E HOD -

T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 1 96 6 F 280.95 A 3 EA XXXXXX REACTOR TRIP DUE TO LOSS OF OFFSITE POWER 1-P 96- 2-18 S --

B --

HA VALVEX MAIN TURBINE CONTROL VALVE MOVEMENT TESTING 2-P 96- 2-18 F --

B --

IA INSTRU NUCLEAR INSTRUMENTATION CALIBRATION t

(1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram (LER D-Regulatory Restriction 4-Other (Explain) Event File Report (NUREG-0161))

E-Operator Training & License Examination F-Administrative (5) l G-Operator Error Exhibit I - Same Source l H-Other (Explain) (Explain) ,.

4

_ _ . ._._ _ _ _ - _ _ _ _ _ _ _.________m__.____.-.______.__-______-.-__._..___m.._._m__m.-_-_.___..-m_ _ . _ _ _ _ _ . . _ _ _ _ _ . _ _ _

-I, 4

I DOCKET: 50-414 UNIT: Catawba 2 Date: 03/15/96 1 NARRATIVE

SUMMARY

MONTH: February,1996 Catawba Unit 2 began the month of February operating at 100% full power. De unit operated at or near 100% full power until 02/06/96 at 1230, when the unit tripped due to loss of offsite power. The unit was placed on-line 02/18/96 at 0528. During power escalation, the unit held at 64% power from 1700 to 1808 - .

I due to main turbine control valve movement testing. He unit held at 69% power from 1843 to 2253 due to nuclear instrumentation calibration. De unit returned to 100% full power on 02/23/96 at 1630 and operated at or near 100% power the remainder of the month.

)

i l

l i

-I Prepared by: R. A. Williams Telephone: (704)- 382-5346

MONTHLY REFUFI tNG INFORMATION REQUEST

1. Facility name: Catawba. Unit 2
2. Scheduled next refueling shutdown: March 1997
3. Scheduled restart following refueling: May 1997

! THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF i

ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

i ,

I l l 4. Will refueling or resumption of operation thereafter require a technical specification change or  !

otherlicense amendment? j Ifyes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information. I l
6. Important licensing considerations (new or different design or supplier, unreviewed design or j l performance analysis methods, significant changes in design or new operating procedures).

i

7. Number of Fuelassemblies (a) in the core: 121 (b) in the spent fuelpool: 524 l
8. Present licensed fuel pool capacity: lill j Size of requested or planned mcrease: =

i

9. Projected date oflast refueling which can be accommodated by present license capacity:

September 2011  ;

l DUKE POWER COMPANY DATE: March 15.1996 Name of

Contact:

R. A. Williame Phone: (704)- 382-5346 i

i'