Forwards Rev 4 to Radiological Emergency Plan & Draft Evacuation Time Estimates for Clinton Power Station Plume Exposure Emergency Planning Zone Dtd Jul 1984.Encls Resolve SER Outstanding Issue 18
ML20101D401
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/13/1984
From: Spangenberg F
ILLINOIS POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML20101D404 List:
References
U-0768, U-768, NUDOCS 8412240045
Download: ML20101D401 (1)


Text

._ _ _ . _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ . ___ -____ - ___ _ _____ -

. U-0768 054-84(12-14)L 1A.120 ILLIN0/8' POWER COMPANY IP CLINToN POWER STATION P.o. Box 678. CLINToN, ILLINOIS 61727

. Docket No. 50-461 December 13, 1984 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief ,

Licensing Branch No. 2

Division of Licensing

.U. S. Nuclear Regulatory Commission

~ Washington,-D.C. 20555

Subject:

Clinton Power Station Unit 1 SER Outstanding Issue No. 18 Clinton Power Station Emergency Plan, Revision 4 Clinton Power Station Evacuation Time Estimates

Dear Mr. Schwencer:

Enclosed are 10 copies of the" Clinton Power Station (CPS) Emergency Plan, Revision 4 dated December 15,1984 (Copy Numbers 201-210). This revision incorporates responses to Mr. David Rohrer's comments on Revision 3 of the CPS Emergency Plan. Changes inccrporated 'on this revision are denoted by a revision bar in the right hand margin.

Because of the significant number of changes, the entire CPS Emergency Plan has been reissued.

Also enclosed are 10 copies of the " Evacuation Time Estin.ates for the Clinton Power Station Plume Exposure Pathway Emergency Planning Zone" dated July 1984. These evacuation time estimates are in draft form and are currently being revised to reflect comments received-from state and local agencies. It is anticipated that the final report of the evacuation time estimates will be submitted in January 1985.

It is our understanding that submission of Revision 4 of the CPS Emergency Plan and the draft evacuation time estimates should resolve the NRC staff concerns cn Outstanding Issue No.18.

Sincerely yours,

/

%.]J 4 F. A. Spa enb rg Director - Nuclear Li ensing and Configuration Nuclear Station Engineering TLG/em-cc: B.L. Siegel, NRC Clinton Licensing Project Manager D. Rohrer, Division of Emergency Preparedness and Engineering Responses (Copy 211)

- NRC Resident Office Regional Administrator, Region III USNRC (Copies 212 and 213)

M W

Illinois Department of Nuclear Safety (Copy 214)

I

  • 9412240045 841213 DR ADOCK 05000 6