Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101N162 + (09:20:35, 13 December 2024)
- ML20101N160 + (09:20:36, 13 December 2024)
- ML20101N159 + (09:20:37, 13 December 2024)
- 05000352/LER-1992-010, :on 920605,north Stack wide-range Accident Monitor Discovered Inoperable & Unable to Perform Design Function Since 920507.Caused by Equipment Malfunction & Procedure Deficiency.Procedure Revised + (09:20:39, 13 December 2024)
- ML20101N150 + (09:20:40, 13 December 2024)
- 05000302/LER-1992-010, :on 920604,determined That Inadequate Level of Detail of Initial Plant Design Calculation Causes Operation Outside Design Basis.Control Transformers Replaced W/Larger Control Transformers + (09:20:42, 13 December 2024)
- RC-96-0099, Submits Response to GL 96-01, Testing of Safety-Related Logic Circuits + (09:20:43, 13 December 2024)
- U-602001, Responds to Rev 1 to Generic Ltr 92-01 Re Reactor Vessel Structural Integrity.All Reactor Vessel Beltline Matls Determined to Be Capable of Maintaining Charpy Upper Shelf Energy Above 50-ft Pounds + (09:20:44, 13 December 2024)
- ML20101N143 + (09:20:45, 13 December 2024)
- 05000302/LER-1992-011, :on 920605,failure to Install Electrical Isolation Device in Interlock Relay Branch Circuit Results in Potential Loss of Control Power to Containment Isolation Valve.Control Power Will Be Uninterrupted + (09:20:46, 13 December 2024)
- ML20101N135 + (09:20:48, 13 December 2024)
- 05000412/LER-1992-009, :on 920605,auxiliary Feedwater Pump Started, Causing Automatic Isolation of SG Blowdown & Trip of Main Feedwater Pump B.Caused by Faulty Latch Mechanism in MG-6 Relay.Latch Mechanism Adjusted + (09:20:50, 13 December 2024)
- ML20101N132 + (09:20:51, 13 December 2024)
- ML20101N131 + (09:20:52, 13 December 2024)
- RC-96-0095, Forwards Present Level of Property Insurance & Cash Flow Statement for Facility,Per 10CFR50.54(w)(3) & 10CFR140.21(e) + (09:20:53, 13 December 2024)
- ML20101N127 + (09:20:54, 13 December 2024)
- ML20101N117 + (09:20:55, 13 December 2024)
- ML20101N124 + (09:20:55, 13 December 2024)
- SNRC-1982, Identifies Changes Lipa Desires to Implement in Activities Identified in Shoreham Dp & Supplements + (09:20:56, 13 December 2024)
- ML20101N107 + (09:20:57, 13 December 2024)
- 05000341/LER-1992-020, :on 911120,HPCI Sys Start Failure Occurred During Quarterly Surveillance Test.Caused by Egr Not Responding to Signal from EG-M Control Unit.Egr Replaced + (09:20:59, 13 December 2024)
- ML20101N101 + (09:21:00, 13 December 2024)
- ML20101N093 + (09:21:01, 13 December 2024)
- 05000341/LER-1992-005, :on 920603,determined That Standby Gas Treatment Sys Division 1 & 2 Inoperable.Caused by Relay 111CR Energized & Sealed in Hindering Start of Sgts.Visual & Physical Insp of Circuitry Performed + (09:21:02, 13 December 2024)
- 05000302/LER-1996-008, :on 960304,discovered That Ambiguous Note Caused Misinterpretation of Improved TS (ITS) SR 3.4.12.1 & Failure to Perform Required Surveillance Prior to Mode Ascension.Its Bases for SR Will Be Revised + (09:21:05, 13 December 2024)
- ML20101N088 + (09:21:06, 13 December 2024)
- ML20101N052 + (09:21:07, 13 December 2024)
- ML20101N068 + (09:21:07, 13 December 2024)
- ML20101N049 + (09:21:08, 13 December 2024)
- ML20101N042 + (09:21:09, 13 December 2024)
- ML20101N048 + (09:21:09, 13 December 2024)
- ML20101N033 + (09:21:10, 13 December 2024)
- ML20101N028 + (09:21:10, 13 December 2024)
- ML20101N026 + (09:21:11, 13 December 2024)
- 05000370/LER-1996-002-02, :on 960306,past Inoperability of EDG 2B Occurred Due to Low Lube Oil Pressure Caused by Unanticipated Interaction of Sys & Components.Increased Frequency for Periodic Venting + (09:21:13, 13 December 2024)
- ML20101N014 + (09:21:14, 13 December 2024)
- ML20101N013 + (09:21:15, 13 December 2024)
- ULNRC-03355, Forwards Info for Change License NPF-30,modifying Section 5.3.1 to Reflect Change in Maximum Initial Fuel Enrichment to 5.0 W/O U-235 for Reload Fuel,Subject to Ifba Requirements in Same TS Section + (09:21:16, 13 December 2024)
- ULNRC-03354, Forwards Present Level of Insurance & Sources of Insurance, Applicable to Plant + (09:21:16, 13 December 2024)
- ML20101M985 + (09:21:17, 13 December 2024)
- ML20101M984 + (09:21:18, 13 December 2024)
- ML20101M983 + (09:21:19, 13 December 2024)
- TXX-9608, Forwards Response to NRC Re Violations Noted in Insp Rept 50-445/96-02 on 960117-30.Corrective Actions:Cited Procedure Including Steps to Address Conditions Previously Not Considered + (09:21:19, 13 December 2024)
- NSD-NRC-96-4680, Provides Responses to RAI on AP600 Design Certification Program + (09:21:23, 13 December 2024)
- ML20101M967 + (09:21:24, 13 December 2024)
- NSD-NRC-96-4683, Forwards Info in Response to NRC 950525 RAIs on AP600 post- 72 H Support Actions + (09:21:25, 13 December 2024)
- ML20101M962 + (09:21:26, 13 December 2024)
- ML20101M955 + (09:21:26, 13 December 2024)
- ML20101M952 + (09:21:27, 13 December 2024)
- NSD-NRC-96-4682, Informs That Westinghouse Review of Matl Encl W/Nrc 960401 RAI Re AP600 Hydrogen Recombination Subsystem for Proprietary Info,Indicates That Identified Matls Contain No Info That Westinghouse Considers Proprietary + (09:21:28, 13 December 2024)
- ML20101M938 + (09:21:29, 13 December 2024)