ML20101M983
| ML20101M983 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 07/02/1992 |
| From: | Reynolds N WASHINGTON PUBLIC POWER SUPPLY SYSTEM, WINSTON & STRAWN |
| To: | Bolch P, Bright G, Schink D Atomic Safety and Licensing Board Panel, TEXAS A&M UNIV., COLLEGE STATION, TX |
| References | |
| CON-#392-13067 OL, NUDOCS 9207090102 | |
| Download: ML20101M983 (1) | |
Text
..
/3067 WINSTON & STRMVN
,.tn ;i ;:
nwse F*t0EN>c4 H wwsfoN osmoul 1400 L $1f1EET. N W cu.cm cirse 5!LA$ H $tRAAN089110 6)
WASHINGTOft DC 20005 3s'02 15 wie wac*tm omvt 72 JUL -2 P3 :05
'" ";,,7 % " '
.,yr c ;r g w tm.<
7,',*.T.." f,I,*,l msete novi ari seso d00hi hNr r, * !, cirJ wa rea. m ****=>
July 2, 1992 M ANC" Peter d.
Bloch, Esquire Da'?f.d R. Schink Chairman, Atomic Safety and Department of Oceanography Licensing Board Texas A&M University U.S. Nuclear Regulatory College Stat. ion, Texas 77843 Commission Washington, D.C.
20555 Mr. Glenn O.
Bright Atomic Safety and Licensing Board U.S.
Nuclear Regulatory Commission Wachington, D.C.
20555 Subj:
Washington Public Power Supply System (WPPSS Nuclear Project IJo. 1) Docket Nq,_1Q 460 OL Gentlemen!
In accordance with the October 14, 1983. Memorandum and Order in the captioned proceeding, the Washington Public Power Supply System hereby submits its quarterly status report regarding co1struction activitios at WNP-1.
During the second quarter of 1992, no significant safety-related construction activities were performed at WNP-1, although a limited engineering effort vna continuing.
We do not anticipate any change in thir level of activity during the next several months.
since ly,
%A Nichobis,S.
e nolds Counsel {forAp'licant cc:
Service List I
.D) 9207090102 920702 PDR ADOCK 05000460' Q
PDR e
~ -. -,
-,,r.
r
,