Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101Q564 + (09:09:09, 13 December 2024)
- ST-HL-AE-4141, Forwards Suppl to 911105 Response to Violations Noted in Insp Repts 50-498/91-21 & 50-499/91-21 Re Issuance of Vital Area Keys.Response Withheld + (09:09:16, 13 December 2024)
- TXX-9227, Responds to NRC Re Deficiency/Unresolved Items Noted in Configuration Mgt Insp Repts 50-445/91-202 & 50-446/91-202 on 911118-1213.Scheduled Walkdowns Will Include Identification of Cable Tray Hangers + (09:09:17, 13 December 2024)
- U-602005, Advises of Change in Titles for Ms Perry & Jg Cook.Perry Title Changed to Senior vice-president & Cook Title Changed to vice-president & Manager of Facility.Correspondence List Should Be Revised to Reflect Change + (09:09:18, 13 December 2024)
- ML20101Q553 + (09:09:19, 13 December 2024)
- U-601943, Responds to NRC Re Violations Noted in Insp Rept 50-461/91-21.Corrective actions:stellite-free Parts for Valves Expected to Be Received in May/June 1992,per Generic Ltr 89-10 & Walkdown of Pad Eye Lugs Completed + (09:09:27, 13 December 2024)
- ST-HL-AE-4127, Responds to Weaknesses Noted in Insp Repts 50-498/92-09 & 50-499/92-09.Corrective Actions:Training of All Personnel Involved in Offsite Notification Message Preparation Will Emphasize Need to Review Message for Accuracy + (09:09:27, 13 December 2024)
- ML20101Q544 + (09:09:28, 13 December 2024)
- ML20101Q536 + (09:09:29, 13 December 2024)
- ML20101Q525 + (09:09:30, 13 December 2024)
- ML20101Q532 + (09:09:30, 13 December 2024)
- W3P85-0023, Forwards Tabulation of Milestones,Projected & Actual Dates, for Sequence of Events at Facility.Amended License Granting Full Power Operation Needed by 850226 to Assure Commercial Operation in Early June + (09:09:37, 13 December 2024)
- ST-HL-AE-5336, Confirms Acceptability of Refueling Practices W/Licensing Basis.Util Evaluation,Performed in Accordance w/10CFR50.59, Confirming That Routine Performance of Full Core off-loads Acceptable Encl + (09:09:44, 13 December 2024)
- ML20101Q505 + (09:09:45, 13 December 2024)
- SNRC-1131, Responds to Generic Ltr 84-23, Reactor Vessel Water Level Instrumentation in Bwrs. Issues Addressed in Generic Ltr Previously Considered & Answered in 821028,1104 & s & 821208 Resolution of Suffolk County Contention 8 + (09:09:45, 13 December 2024)
- ML20101Q499 + (09:09:52, 13 December 2024)
- ML20101Q498 + (09:09:53, 13 December 2024)
- ELV-03877, Monthly Operating Repts for June 1992 for Vogtle Units 1 & 2 + (09:09:54, 13 December 2024)
- ML20101Q494 + (09:09:54, 13 December 2024)
- ML20101Q493 + (09:09:55, 13 December 2024)
- ML20101Q482 + (09:09:56, 13 December 2024)
- ML20101Q487 + (09:09:56, 13 December 2024)
- ML20101Q479 + (09:09:57, 13 December 2024)
- ML20101Q465 + (09:10:03, 13 December 2024)
- JPN-92-036, Provides Results of Reactor Vessel Head Weld Insp Conducted During 1992 Refueling Outage + (09:10:04, 13 December 2024)
- ML20101Q454 + (09:10:05, 13 December 2024)
- ML20101Q449 + (09:10:06, 13 December 2024)
- ML20101Q452 + (09:10:06, 13 December 2024)
- ML20101Q443 + (09:10:16, 13 December 2024)
- ML20101Q417 + (09:10:30, 13 December 2024)
- ML20101Q420 + (09:10:30, 13 December 2024)
- ML20101Q415 + (09:10:31, 13 December 2024)
- ML20101Q413 + (09:10:32, 13 December 2024)
- ML20101Q403 + (09:10:39, 13 December 2024)
- ML20101Q400 + (09:10:40, 13 December 2024)
- ML20101Q386 + (09:11:02, 13 December 2024)
- BSEP-84-2757, Forwards LER 2-84-17.W/o Encl + (09:11:10, 13 December 2024)
- ML20101Q382 + (09:11:10, 13 December 2024)
- 05000369/LER-1984-030, Suppl to LER 84-030:review Revealed Installation Error That Would Result in Failure of Upper Head Injection Accumulator Discharge Valves to Isolate on Low Level.Analysis of Safety Significance & Encl + (09:11:19, 13 December 2024)
- NSD-NRC-96-4688, Forwards Responses to NRC follow-on Questions Provided in 950907,1018 & s Re I&C Modeling in AP600 PRA + (09:11:19, 13 December 2024)
- B14192, Special Rept:On 920601,Millstone Unit 2 Entered TS 3.3.3.3 When Seismic Monitoring Sys Removed from Service to Support SG Replacement Outage.Operations Personnel Instructed on Appropriate Actions Re Response to Monitor Alarm + (09:11:20, 13 December 2024)
- ML20101Q362 + (09:11:21, 13 December 2024)
- ML20101Q360 + (09:11:29, 13 December 2024)
- ML20101Q352 + (09:11:30, 13 December 2024)
- ML20101Q349 + (09:11:31, 13 December 2024)
- ML20101Q344 + (09:11:32, 13 December 2024)
- ML20101Q348 + (09:11:32, 13 December 2024)
- ML20101Q343 + (09:11:34, 13 December 2024)
- ML20101Q337 + (09:11:35, 13 December 2024)
- ML20101Q341 + (09:11:35, 13 December 2024)
- NSD-NRC-96-4687, Forwards Proprietary Diskette Containing Updated AP600 MAAP4 Parameter File Used for AP600 Level 2 PRA & Proprietary Info Re Modeling of AP600 PRA Dvi Line Break Case 3BE. Proprietary Diskette & Info Withheld Per 10CFR2.790 + (09:11:36, 13 December 2024)
- ML20101Q331 + (09:11:37, 13 December 2024)