MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
edl'\ U 4(be h
Duquesne L%ht 1. _ m _ e N, ow c., ;
V G lt ,s 4
- * ; p. ot iA y.9?7 0001 July 10, 1992 Deaver Valley Power Station Unit 1 - Docket 11o. 50-334, Licenso llo. DIM-66 Unit 2 - Docket No. 50-412, Licenso llo. IlPF-73 Monthly Copratim Ppport U. S. !!uclear Rcqulatory Comndssion Docu ent Control Denk Wanhirgton, D.C. 20555 Gentleren:
In accordance with I g e nlix A, Technical Specifications, the lionthly Or>cratirq Report is subnitted for Unit 1 and Unit 2 for the Ironth of June, 1992.
Very truly yours, l '
/ &-
J. D. Sieber Vice President Nuclear Group DTJ/1xg Enclosures cc: NRC Regjonal Off3ce King of Prussia, PA 4
9207140322 920630 PDR R
ADOCK 05000334 pop
//
'/f i
_ _ . . - _ . . . ~ _._.- . .. . . . . . . .
flARRATIVE Sut%RY OF KtmEY OPD&TIllG EXPERIDiCE U! TIT 1 JtNE 1992 l
June 1 The Unit operated at a runimi value of 100% output durirg through the entire report priod.
June 30 l
\
i I
'l
[
i b
9 W
4 f
- , - . . ..,_.,,v, __-.,--..-_...,._..v. ,- , , - . . . . . , ~% y.. .- , . , , - , _, ,, , w t.
AVIRAGE DAILY UllIT KEER IBtEL DOCKET 10. 50-334 __
LUIT BVPS Un3 1 DATE _Guly 2, 1:32 _.
CEMPIITED BY David.T. Jones.
TELErilotiE (412) 393-7612 IQmt June 1992 DAY AVEPME DAILY luiER LEVEL DAY AVEPME DAILY TORDI LEVET, (IS4e-liet) (144e-Not) 1 817 17 __ 804 ,
2 817 18 _,,
813 3 813 19- 913 l 4 813 20 825 5 , , _ _ _ . 821 21 825 , , , ,
6 813 _ _. 22 .. 829 7 808 23 8_1_7 8 808 24 _ 817 9 817 25 821 10 .817 26 817 __
11 821 27 817 12 817 28 821 __,
13 808 29 813 14 816 _ 30 . 817 15 821 16 821 .
DiSITUCTIONS On this formt, list the average daily unit pcuer level M4e-Net for each day in the reportirg month. Ccrpute to the nearect whole megawatt.
i A
1 1 OPERATING DATA REPORT l
, DOCRE? r7.. 50 334
- REPORY dTE
- 07/02/92
- COMPLETED BY: DAVID T. JONES
! TELEPHONE: (412) 393 7612 t
4 OPERATING STA1TS I" l l
3
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes )
i 2. REPORTING PERIOD: JUNE 1992
, 3. LICENSED THERMAL POWER (MVt): 2652
- 4. NAMEPLATE RATING (Gross MVe): 923 4 I 5. DESIGN ELECTRICAL RATING (Net MVe): 835 !
, 6. MAX. DEPENDABLE CAPACITY (Gross MVe): 860 .
i
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 810 i l
i 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, CIVE REASONS: ;
l 4
- 9. POWER LEVEL TO VilICll RESTRICTED, IF ANY (Net MVe): None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMUIATIVE I
- 11. HOURS IN REPORTING PERIOD: 720.0 4367.0 141719.0
- 12. NO OF RRS. REACTOR VAS CRITICAL: 720.0 4367.0 89690.6
- 13. REACTOR RESERVE SHUTDOWN 110URS: 0.0 0.0 4482.8
- 14. HOURS GENERATOR VAS ON LINE
- 720.0 4367.C 87798.2 .
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH): 1902940.0 11378755.0 209890931.5
- 17. GROSS ELECT. ENERGY GEN. (MVH): 622430.0 3733090.0 67531493.0 L8. NET ELECTRICAL ENERGY GEN. (MVH): 587796.0 3524290.0 63091840.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 64.0
- 20. UNIT A*,'AILABILITY FACTOR:(PERCENT) 100.0 100.0 64.0
- 21. UNIT CAPACITY FACTOR (MDC): PCT 100.8 99.6 57.7
- 22. UNIT CAPACITY FACTOR (DER): PCT 97.8 16.7 56.0
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 16.0 24 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SliUT DOWN AP END OF REPORT PERIOD, ESTIMATED DATE OF STARTU": _
- 26. UNITS IN TESP STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST- ACHIEVED INITIAL CRITICALITY N/A N/A
, INITIAL ELECTRICITi ___N/A N/A l COMMERCIAL OPERATION , N/A _ ,
N/A l
l
\
vb o __ > w - - ,_s _
k
~ .
k UNIT SHUTDOWNS AND PCWER REDUCTiens (2201) Docket No. 50-334 .
\ Unft Name SwPs Unit R1 1 Date jut y 6. 1992
\ Ceapseted By D a vid _Tdwes REPORT MON!N ,;UNE 1992 .elephone (412) 393-7612 Method of Licenses Cause & Corrective Duration shutting Event Systes Component f. Action to Reason 2 Dcan Reactor 3 Report # Cove 4 Code 5 Present Recurrence N o .. Date Typet (Rours) -
WOME 4
i i t
3 4 1 2 Met"od:
n Exhibit F-Instructions for F-Forced Reason:
Pres; ration of Data Entry sheets S-scheduled A-Equipment Failure (Emplain) 1 Manual 2-Manual scram f or LI:ensee Event Report nER) File 5-Maintenance or Test C-Refueling 3-Autocatic scram (WUREG0f61).
D-Reguistory Restrletion 4-C:nt h*. from Prewtous Month E-Operator Training & License Exam S Reduction 5 F-Administrative 9-0:her Eshible N-same source. :
S G-Operational Error (Emptain) vi-Other (Em: stain) tm 8
IUGRATIVE stiVARY OF
!DTI11LY OPEPATIllG INERIDICE UlIT 2 JLUE 1992 I
June 1 'Ihe Unit operatal at a nomimi value of 100% output.
thrcugh j
June 4 Jmm 5 At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the Unit ccamanced a load reduction to 30%
- output to perform mainterunoo on the "A" and "B" licater
. Drain Pumpo.
1 June 6 'Iho Unit continued to operate at a,Wtely 30% output.
l June 7 'Ihe Unit began per escalatico at 0717 hours0.0083 days <br />0.199 hours <br />0.00119 weeks <br />2.728185e-4 months <br /> followiry l
- campletion of minterunce on tha "A" and "B" Heater Drain i TuTo. Due to a problem with the packiry on the "A" lleater .
Drain Punp, a powr reduction frcm 72% cutput was ccamencal l at 1245 houra for packiry repairs. Followiry oxpletion of repairs, power escalacion to 100% output carnenced at 2138 hours0.0247 days <br />0.594 hours <br />0.00354 weeks <br />8.13509e-4 months <br />.
June 8 100% output was ach!cved at 0415 ho2rs.
June 9 'Ihe Unit operstxi at a ncininal value of 100% output durhg through tne reminder of tis report period.
June ~;0
4 AVDEE DAILY UNIT NER IIVEL DOCKET 10. 50-412 U! TIT _BVPS Unit 2 DATE July 2. 1992 Cat @Lt.T. ID BY David T. Jones TELEMONE (411}_J23-7612__
FDtml June 1992 DAY AVER 7CE DAILY frWIR LEVEL DAY AVDEE DAILY MER LEVEL (Wo-tieti (We-tiet) 1 822 17 812 2 821 18 817 3 818 19 820 4 815 20 829 5 758 21 830 6 168 22 828 7 ,
258 23 825 8 782 _
24 823 9 816 25 823 10 820 26 821 11 821 27 825 12 820 28 826 13 819 29 821 14 818 30 . _ , .
816 15 821 __
16 820 _
DETRUCI' IONS On this forrat, list the average daily unit powe.r level Wo-Net for each day in j the reporting month. Capute to the nearest whole nagavatt.
. . - -~ . , . , . . -
OPERI. TING DATA REPORT DOCKET NO.: 50 412 REPORT DATE: 07/02/92 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393 7612 OPFPATING STATUS
.m
- 1. UNIT NAME: BE/.VER VALLEY POWER S'i ATION, UNIT 2 Notes
- 2. REPORTING PERIOD: JUNE 1992
- 3. I.ICENSED THERMAL POWER (MWt): 2652
- 4. NAMEPLATE RATING (Gross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 836
- 6. MAX DEPENDABLE CAPACITY (Gross MWe): 870
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 620
- 8. IF CRANGES OCCUR IN CAPACITY RATIMOS SINCE LAST REPORT, GIVE REASONS:
V. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): .,,,
None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A __
/
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. ROURS IN REPORTINC PERIOD: /20.0 4367,0 40502.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL: 720.0 3004.0 34084.2
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0,0
- 14. HOURS GENERATOR WAS ON LINE: 720.0 2926.3 33808.3
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. CROSS THERMAL ENERCY GEN. (MWH): 1809717.0 7009788.0 82369535.4
- 17. GROSS ELECT ENERGY GEN. (MVH): 590582.0 2262506.0 26437087.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH): 5594t4.0 2126811.0 24932296,0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 67.0 63.5
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 67.0 83.5 21, UNIT CAPACITY FACTOR (MDC): PCT 94.8 59.4 74.4
- 22. UNIT CAPACITY FACTOR (DER): PCT 93.0 58.3 73,6
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.5 3.6
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOVN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
Occhet No. 50-412 -
- UNIT SMUIDOWws AkD POWER REDUCT Oks (r N1)
Unit Name SVPS Unit #2 Datt _ July 6. 1992 Completed 8y Cavid T. Jones REPCRT McWTM JUuE 1992 Telephone (412) 395-7612 - -
~
cause & Cor rectlye Method of Licensee Event Component Action to Duration shuttins systes Prevent Recurrence Reason 2 Dowra Reartor3 Report # Code 4 Code 5
- 20. Date Typet (Mours) 5 N/A RN PUMPXX Unit's output redJced from 100% to 14 920605 5 l 0 8 30% to perform maintenance en the "A" and "S" Mester Drain Pumps.
5 m/A un PowPrX Unit's output reduced f rom TZX to 15 920607 F 0 A 34% for packing repair: 6.. the "A" Meater Drain Pump.
I i
i I
I 1
! 1 3 4 2
1 F Forced Reason: Method: Exhibit F-Instructions f or 1-Manual Preparation of Data Entry Sheets S-Scheduled A-Equipment Failure (Emplain) for Licensee Event Report (LER) File 8-Maintenance or Test 2-Manual Scras C-sefueting 3-Automatic scram (NuREG0161).
D-Regulatory Restriction 4-Cont'd. fres Previous Month E-operator Training & ticense Emme 5-R educ t i on 5 F-Ada!nistrative 9-Other Eahibit M-same Source.
G operational Error _(Emplain)
N-Other (Esplain)
_ _ _ _ _