ML20101Q348
| ML20101Q348 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 07/09/1992 |
| From: | Cottle W ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20101Q351 | List: |
| References | |
| GNRO-92-00084, GNRO-92-84, NUDOCS 9207140250 | |
| Download: ML20101Q348 (2) | |
Text
- - - _
E,,
= ENTERGYL
%*aNI'"" """'
Pc< Gesm143 N69 15 00i C37 640!3 a
_ 4 W. T. Cottle v.o,--
July 9. 1992_
72n,..,_ ~,
U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C.
20555 Attention:- Document Control Desk-
SUBJECT:
-Grand Gulf-Nuclear Station
~
Unit 1 Docket No. 50-416 License No. NPF-29
! Post RF05 Startup Test Report GNR0-99./00084
. Gentlemen:
Entergy Operations,-Inc._ is transmitting, with this letter, the Grand Gulf N
' Nuclear Station (GGNS) Unit 1 Post Refueling Outage-5 (RF05) _Startup Tesi. -
Report. This report is sent in ecmpliance with the requirements of Grand y
-. Gulf: Technical Specifications 6.9.1.1, 6.9.1.1., and 6.9.1.3.
The_startup, physics testing was completed on June 16, 1992. The attached
. report provides a summary of each test and the results-where applicable.
n If further information-is: required, please contact this office.
Yours-truly,_
QFA WiC/JMA/cg_
attachments:
cc:
(See next page) i o
t_
~.~g H;Uca4 9207140250 920709 PDR ADOCK 05000416
}_I P.
pop p
RF05RPT/SCMPFLR f-1 1
2______.
b
July 9, 1992 GNRO-92/00084-
.Page 2 of 3 1
cc: Mr. D. C. Hintz (w/a)
Mr. J. L. Mathis (w/a)
Mr. R. 8. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. I Thomas (w/o)
Mr. Stewart D. Ebneter (w/a)
Regional Administrator U.S. Nuclear Regulatory Comission Region II 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia.-30323 Mr. P. W. O'Connor, Project Manager (w/a)
Office of Nuclear Heactor Regulation U.S. nuclear Regulatory Comission Mail Stop.13H3 Washington, D.C.
20555 I
(Z E
(
RF05RPT/SCMPFLR-i
..