' Electnc PONER COMPANY 231 w Mchv2po IL. ?Mo M.ww w O201 p u)2:12us VPHPD-92-242 NRC-92-073 July 10, 1992 U.
S.
NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station P1-137 Washington, D.
C.
20555 Gentlemen:
DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH HUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of June 1992.
Sincerely, E
Bob Link Vice President Nuclear Power
-Attachments Copies to L. L. Smith, PSCW
-NRC Regional Administrator, Region-III NRC Resident Inspector-tdbjl 9207140301 920630 PDR ADOCK 05000266 P
- t,
. AabsMegafIlinwuhEmvphpn&w :
-2
1 C?ERATING DATA REPOstT DOCKET NO. 50-266 j,.
DATE: July 2, 1992 i
i i~
COMPLETED BY Don C.s Peterson kl
' 414-755-2321 Ext. 361 i
i TELEPHONE:
OPERATI!8G STATUS e.
t'
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES I
{
- 2. REPGRTING PERIOD: Juw - 1992 j
- 3. LICENSED THERMAL POWER (MWT):
1518.5 l
- 4. NAMEPLATE RATING (GROSS MWE):
.523.8 jt
- 5. DES?GM. ELECTRICAL RATING (NET MWE):
497.0 f
l.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
509.0..
j j]~
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): '485.0 p
.8.
IF.' CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE RDLSONS:
[
. NA -
j h
- 9. POWER LEVEL 10 WRICH RESTRICTED, IF ANT (NET MWE):- NA
- 10. REASONS FOR' RESTRICTIONS,-(IF ANY)t i
.pg
.THIS MONTH TEFR TO DATE CUMULATIVE y
- 11. HOURS IN REPORTING PERIOD 720 4,367 189,791
)'
- 12. NUMBER OF HOURS RERCTOR WAS CRITICAL 628.9
'3,089.2 156,479.7 Il-
- 13. REACTOR RESERVE SNUTDOINI NOURS O.0 2.4 655.1 4 '
- 14. HOURS GENERATOR ON LINE 590.4 3,019.3 153,448.0 di 1
- 15. UNIT RESERVE SMUTDOWN HOURS 0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MMM) 807,140 4,445,107 215,095,110 17.: GROSS ELECTRICAL ENERGY GENERATED'.
.272,600 1,522,550 72,626,280 j
i'
- 18. NET ELECTRICAL ENERCT GENERATED (MefM)
-257,912.
<1,454,370 69,204,143
[
19.-UMIT SERVICE FACTUR 82.0%
69.1%
80.9%
20.' UNIT AVAILABILITY FACTOR 82.0%
-69.1%
81.3%
l i
21.1UIIIT CAPACITY PhCTOR (USING M C NET) 73.9%
68.7%
74.8%
22._-UNIT CAPACITY FACTOR-(USING DER NET) 72.1%-
67.0%
73.4%
p
[
- 23. VIIIT PostCED OUTAGE RATE ~
3.6%
0.7%
I*7%
I
- 24. SHUIDOINIS SCHEDULED OVER NEET 6 NORTRS (TTPE,'DATE, AND DURATION OF EACN):
l None
+
5 4!
4 25.~IF SMUTDOOMt AT END OF REPORT PERIOD,' ESTIMATED DATE OF STARTUP:
t i
NA 3
j; DATA' REPORTED AND FAC100tS CALCULATED AS REQUESTED 'IN NRC LETTER DATED SEPTEMBER 22, 1977 1
j i
i i
^
[
l' 1
POINT BEACH NUCLEAR FIANT DOCKET NO.
50 74 IM. RACE DAILY USTP POWER LEVEL UNTT NAAE Pcint Beadk Unit 1 MONTH JUNE - IW2 DATE Juk 3.1902 COMPLETED BY _ D. C. Peterson TELEPHONE 4I4/755-3 21 -
AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY
' POWER 1EVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET
'1
-14
' 11 23 21 477 2
-15 12 33 22 4%
3
-15 13 406 23 4%
-10 14
@6 24 495 4:
5,.
-28 15 67 25 AM 6.
106 16
@S 26
@4 7
2D7 17
@5 27 402 l'
8_
380 18
@9 28 491 9
490 19 -
4%
29 494 10 408 20 407 30 M
l-
. rBF6 (0190)
'Lm)na 1l
POINT BEA01 NUCLEA". FIANT Docket No.
50-266 Unit Name Point Beach. Unit 1 UNIT SHUTDOWNS AND POWER REDUCTIONS D le Juir 1 1902 Compkted By D. C Peterson REFORT MONTH JUNE - 1902 Telephone No.
414n55-232L 11361 I
i Method of Shutting 2
Nrs Date Type' Duration Reason Dces lxensee bent System Component Cause and Conem Action 1
920411 S
107 C-1 Scheduled refueling and _ --. ---- outage U1R19. Majorwort items include inspection 4
and eddy current testar.g d the ssensi r.~ a,.,iae.nm of full flow test Enem for ressdual best renwwal, safety injection and contarement spray pumps. A capaaty anciense of the asene drma mundiary feed-ster peep recircuistice Ene. Centrol power seyersticr,. for the 4810 voit tmees, kyw pressere suitnae work and asM electncal drawing walkdowns of the reactor protection and safeguards system.
4-Oh testing of au fuel rois Recondition eM testing of the n min steam isolation valves 2
920605 5
0.7 B
1 GewrecorTaken of!Fw for tur%ne overspeed test.
3 920611 P
22 A
1 IDI Vessel Unit ts6-= cmine to repai-heater d:nds tank saan=my leak.
I i
i 4
'F: Forced
' Reason-SMethod:
Mbit G -Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual -
for preparation of B - Maintenance or Testing 2 - Manual Scrata data entry sheets C-Refueling 3 - Automatic Scram LER file (NUREG4161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdont Licensing Exam 5 - Reduced Lead F 1Ldrninktrative 6 - Other (explain)
' Exhibit I-Same Source G - Opers.tional Error (explain)
H - Other (explain) co m >
DOCKET NO.
50-266 UNIT NAME Point Beach Nuclear Plant, Unit 1 DATE' July 3, 1992 COMPLETED BY D. C.
Paterson TELEPHONE 414-755-2321, Extension 361 After completing a 55-day refueling and maintenance outage on June 5, 1992, Unit i resumed full-power operation to average a daily power level of 358 MWe not for the month.
During this period, three Licensee Event Reports were submitted in accordance with 10 CFR 50.73:
1.
LER 92-004-00, Improper Sequencing of Emergency Safety Features 2.
LER 92-005-00, Excessive Cool-Down Transient 3.
LER 92-006-00, Failure of Main Steam Isolation Valve 1MS-2018 to Fully shut During-Performance of IT-280 Safety-related maintenance included the following:
1.
Replaced boric acid tank bubblers inlet check valve.
2.
Removed, inspected, and reinstalled electric auxiliary feedwater pump mini recirculation orifice elbow fitting (leads to a digital flow meter).
3.
Adjusted contacts of train A boric acid tank switch-over logic relay.
4.
Inspected, reworr.ed,-and retorqued-packing glands and stuffing bcxes on the-main steam isolation valves.
5.
Field wiring connectors were found to be reversed at the Jo-Bell lower reactor coolant pump oil sump high:
alarm.
Leads were normalized and marked-to help prevent future occurrences.
l i
_ - _ = _ _ _ _
a
^
OPERATING DATA REPORT DDCKET NO. 50-3r1 DATE: July 2, 1992 I
COMPLETED BY: Don C; Peterson TELEPHONE: 414~755-2321 Ext. 36I OPERATING STATUS
- 1. UNIT NAME:
POINT BEACH NUCLEAR PLANT - UNIT 2 NOTES
- 2. REPORTING PERIOD:- June - 1992
- 3. LICENSED THERMAL POWER (MWT):
1518.5
- 4. NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GR% S MWE):
509.0.
- 7. MAXIMUM DEPENDAB2 CAPACITY (NET MWE):
485.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
NA THIS MONTH YEAR TO DATE CUMULATIVE 720 4,367 174,576
- 11. HOURS IN REPORTING PERIOD
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4,367.0 153,096.8 0.0 11.6 228.3
- 13. REACTOR RESERVE SHUTDOWN HOURS 720.0 4,355.4 150,844.9
- 14. HOURS GENERATOR ON LINE 0.O O.0 302.2
- 15. UNIT RESERVE SHUTDOWN HOURS 16.. GROSS THERMAL ENERGY GENERATED (MWH) 1,126,747 6,573,149 216,040,306
- 17. GROSS ELECTRICAL ENERGY GENERATED 371,220 2,253,140 73,412,520
- 18. NET SLECTRICAL ENFRGY GENERATED (MWH) 354,707 2,155,851 69,975,629 100.0%
99.7%
86.4%
- 19. UNIT SERVICE FACTO:;
100.0%
99.7%
86.6%
- 20. UNIT AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.6%
101.8%
82.0%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 99.1%
99.31 80.7%
O.0%
0.01.
1.1%
- 23. UNIT FORCF'? ~RTTAGE RATE
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS.(TYPE, DATE, AND DURATION OF EACH):
Refueling Shutdown - September 25, 1992, 6 weeks duration
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC Ltalta DAT 1.s SEPTEMBER 22, 1977
POINT BEACH NUCLEAR FIANT DOLAe.1 NO.
50-301 AVERAGE DATLY UNTT POWER LEVEL UNIT NAhE Point Beadt Unit 2 '.
MONTH JUNE - IW2 DATE July 3_1902 COMPLEED BY D. C. Pet-rson i
TELEPHONE 414n551*21 AVERAGE AVERAGE A\\TRAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAX
_ MWe NET DAY MWe NET DAY MWe STT r
n 1
496 11 400 21 418 2
447 12 498 22 464 l
3 498 13 M
23 495 4
498 14 498 24 495 L
5 497 15 4%
25 4%
i 6
498 16 495 26 4%
7 499 17 405 27 404 8
$97 18 408 2h 406
' 9 457' 19 497 29 497 10 497 20 497 33 4%
(G90)
POINT DEACH NUCLEAR FIAhT Docket No.
50-301 Unit Name Point BeacfL Unit 2 UNIT SHUTDOWNS AND POMTR REDUCTIONS Date Juh 3.1W2 Compk:ted By D_ C Pet-rson REPORT MOSTH JUNE - 1092 Telephone No.
414M55-2321. Ext. 361 Methoa or Shuttmg Cause and Cserectrwe Action 1xemeeEwnt Systern Compcwwat Darste No.
Date Type (Houts)
Reason y y R -,~.: No.
Code' Code' To Pr *ent Recunence 8
2 i
l I
I l
'F: Forced
' Reason-
' Method:
'Dhibit G -Instruc6ons S: Scheduled A - Equipment Failure (explain) 1 - Manad for preparation of B - Maintenance or Testing 2 - Manuai Scram data entry sheets C - Refueling 3 - Automatic Scram LER Sc (bTJREG4161)
D - Regulatory Restridion 4 - Condnuation of E - Operator Trsining &
Previous Shutdown Licensing Exam 5 - Reduced Load F-AhLbdie 6 - Other (e plain)
' Exhibit I - Same Omtre G - Opciational Error (exp'ain)
H - Other (explain)
PBF 6 W %)
DOCKET No.
50-301 UNIT NAME Point Beach Nuclear Plant, Unit 2 DATE.
July 3, 1992 COMPLETED BY D.
C. Peternon TELEPHONE 414-755-2321, Extension 361 Unit 2 operated at approximately 493 Mwe net throughout this report period with no significant load reduction.
Safety-related maintenance included:
1.
Replaced internals of Bailey positioner on residual heat removal pump discharge to correct excessive air leak.
2.
Replaced flag indication mechanism on pressurizer heater group control switch.
mnm__---_-____-.-____.__..-_.._.._