Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20104A861 + (08:34:15, 13 December 2024)
- ML20104A850 + (08:34:17, 13 December 2024)
- ML20104A855 + (08:34:17, 13 December 2024)
- ML20104A845 + (08:34:18, 13 December 2024)
- ML20104A843 + (08:34:19, 13 December 2024)
- ML20104A839 + (08:34:20, 13 December 2024)
- LD-92-094, Forwards Repts on Approach to Assessment of Flood & Fire Protection in Sys 80+ Pra,Including PRA Flood Protection Assessment & Fire Hazards Risk Assessment (Phase I) + (08:34:21, 13 December 2024)
- ML20104A829 + (08:34:22, 13 December 2024)
- ML20104A824 + (08:34:23, 13 December 2024)
- ML20104A822 + (08:34:24, 13 December 2024)
- ML20104A815 + (08:34:25, 13 December 2024)
- ML20104A817 + (08:34:25, 13 December 2024)
- ML20104A810 + (08:34:27, 13 December 2024)
- ML20104A803 + (08:34:27, 13 December 2024)
- ML20104A788 + (08:34:28, 13 December 2024)
- LD-92-091, Forwards Responses to 920409 Request for Addl Info Re Sys 80+ Severe Accident Design Features + (08:34:30, 13 December 2024)
- ML20104A775 + (08:34:31, 13 December 2024)
- A09594, Requests Extension in Time to Respond to Issues 2 & 3 of RI-91-A-0064 Because of Close Relationship to Issues That Will Be Addressed in Response to RI-91-A-0052 & Need for More Time to Address Issues Adequately + (08:34:32, 13 December 2024)
- 3F0992-06, Responds to NRC Re Enforcement Action 92-002,per Util .Util Nearing Completion of Overall Upgrade to EOPs & Emergency Plan Training & Procedures Have Been Reviewed for Clarity in Classification of Events + (08:34:33, 13 December 2024)
- 05000370/LER-1984-034, :on 841221,reactor Actuation Occurred When Inverter Erroneously Removed from Svc.Caused by Operator Failing to Properly Identify Component to Be Removed from Svc.Personnel Counseled.Trip Setpoints Reset + (08:34:35, 13 December 2024)
- ML20104A739 + (08:34:36, 13 December 2024)
- ML20104A732 + (08:34:37, 13 December 2024)
- ML20104A731 + (08:34:38, 13 December 2024)
- ML20104A727 + (08:34:39, 13 December 2024)
- ML20104A726 + (08:34:40, 13 December 2024)
- ML20104A723 + (08:34:41, 13 December 2024)
- ML20104A712 + (08:34:42, 13 December 2024)
- ML20104A706 + (08:34:43, 13 December 2024)
- ML20104A698 + (08:34:43, 13 December 2024)
- BECO-85-020, Requests Schedular Extension Until 851130 to Complete Environ Qualification of Equipment.Matrix Containing Equipment Items W/Basis for Request & Justification for Continued Operation Encl + (08:34:44, 13 December 2024)
- AECM-85-0027, Corrected Response to NRC 841109 Request for Addl Info Re Util Proposed Provisions for Isolating Div I Remote Shutdown Panel Control Circuits from Potential Damage Due to Control Room Fire + (08:34:46, 13 December 2024)
- RBG-19-926, Forwards Revised Page to 841105 Response to SER Open Items 4 & 6 Re Inservice Test Program & Preservice Insp Program, Respectively.Corrected Page Revises Response to Item VI by Correcting Typo + (08:34:46, 13 December 2024)
- ML20104A650 + (08:34:47, 13 December 2024)
- ML20104A642 + (08:34:48, 13 December 2024)
- PLA-2394, Forwards Change T to Physical Security Plan.Change Withheld (Ref 10CFR73.21 & 2.790) + (08:34:49, 13 December 2024)
- ML20104A639 + (08:34:50, 13 December 2024)
- ML20104A634 + (08:34:51, 13 December 2024)
- ML20104A628 + (08:34:52, 13 December 2024)
- ML20104A612 + (08:34:55, 13 December 2024)
- ML20104A611 + (08:34:56, 13 December 2024)
- RBG-19-929, Forwards Rev to Position on Fuel Storage Areas.Fire Patrol Will Monitor Activities & Promptly Respond to Events Should Portion of Fire Protection Equipment Remain Incomplete for Fuel Storage Zone + (08:34:57, 13 December 2024)
- B13717, Submits Results of Review Subj to Some Different Interpretations & Further Clarification That Might Be Helpful to Ensure Completeness of Response to Allegation RI-90-A-0202 + (08:34:58, 13 December 2024)
- ML20104A589 + (08:34:59, 13 December 2024)
- ML20104A593 + (08:34:59, 13 December 2024)
- ML20104A583 + (08:35:00, 13 December 2024)
- ML20104A578 + (08:35:01, 13 December 2024)
- ML20104A575 + (08:35:02, 13 December 2024)
- 05000272/LER-1979-020-03, /03L-0 on 790225:pressurizer Level Channel II Was Declared Inoperable.Caused by non-linearity of Strain Gauge in Level Sensor Transmitter.Strain Gauge Replaced Along W/ Zero & Span Potentiometers.Transmitter Recalibrated + (08:35:04, 13 December 2024)
- ML20104A570 + (08:35:06, 13 December 2024)
- ML20104A569 + (08:35:07, 13 December 2024)
- ML20104A562 + (08:35:08, 13 December 2024)