Submits Second Interim Deficiency Rept:Tensile Anchor Capacities Lower than Assumed in Design Allowables,Initially Reported on 790212.Stud Anchor Testing Underway;Complete Analysis to Be Submitted Before Unit 1 Fuel Load
ML20104A824
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/14/1979
From: Gilleland J
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7906140364
Download: ML20104A824 (1)


Text

TE( JESSEE VALLEY AUTHORIT',

,, s CH ATTANOOG A. TENNESGCE 37401 500C Chestnut Street Tower II G

?.

=-

3 2.s zo MAY J.41979 s;

go 7J 3

T a1

-n9 42 Mr. James P. O'Reilly, Director c.n

, r.f Office of Inspection and Enforcement Il k.;a U.S. Nuclear Regulatory Commission Region II - Suite 3100 f) 101 Marietta Street

}

s Atlanta, Georgia 30303 c4

Dear Mr. O'Reilly:

i,

'd SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 - TENSILE ANCHOR CAPACITIES LOWER THAN ASSUMED IN DESIGN ALLOWABLES - NCR CEB 79 a>

SECOND INTERIM REPORT I

7 y

The subject deficiency was initially reported to NRC-0IE Inspector Tom Burdette on February 12, 1979, in accordance with 10 CFR 50.55(e).

Our first interim report was submitted on' March 14, 1979.

Testing of the stud anchors is still in progress.

TVA expects to furnish the results and a complete analysis of the testing program for Sequoyah before Sequoyah unit 1 fuel load.

If you have any quopions concerning this matter, please get in touch with D. L. Lambert at FTS 854-2581.

Very truly yours, L

L, f

./ -

'f. E. Gilleland

",7, W' Assistant Manager of Power cc:

Mr. John G. Davis, Actirig Director

,Q Office of Inspection and Enforcement p',

U.S. Nuclear Regulatory Commission

,ff ( /.

,.p\\,

Washington, DC 20555

.< m e,'0 m

7906140%cl 9%275L

,, w n., -, -

vI

.ea

e 5

REGULATURY I( 3RMATION DISTRIBUTION SYS'

' (RIDS) g. ~. 6... '

ACCESSION NRR:7906140364 00C.DATE: 79/05/1a NOTARIZED: NO DOCKET s FACIL:50-327 Sequoyah Nuclear Plant, Unit 1, Tennessee Valley Auth 05000327 50-328 Sequoyah Nuclear Plant, Unit 2, Tennessee Valley Auth 05000328 AUTH,NAME AUTHUR AFFILIATION

~

GILLELAND,J.E.

Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION O'REILLY,J.P.

Region 2, Atlanta, Office of the Director

SUBJECT:

Provides secono interim deficiency rept on tensile anchor capacities lower than assumed in design allowables initially reported on 790212. Stud anchor testing underway &

complete analysis to be submitted before Unit 1 fuel load, DISTRIBUTION CODE: B019S COPIES RECEIVED LTR s/. ENCL f2 SIZES s(.......

TITLE: CONSTRUCTION DEFICIENCY REPORT (10CFR50.55E).

NOTES:./L QGWl&AGbO' LU...&%. 0Aff_AIQj.. T9..QW..%C,6(ANTff J'2..GCIL..Wr.

RECIPIENT COPIES RECIPIENT COPIES ID CODE /NAME LTTR ENCL ID CODE /NAME LTTR ENC DCTION:

14 PM [f 5/L uEN 1

l 15 BC Lod 8 4ty 1

/

20 LA /414 # 9 1

21 AD t/M.ssocco 1

l BNTERNAL:

EFG FILE

)

1 1

02 NRC PDR 1

1 v2 46 2

0 07 EDO & STAFF 1

1 08 MPA 1

09 DEPY DIR DPM i

1 10 QAB 1

l 11 STANDRDS DEV 1

1 12 JORDAN,E/IE 1

1 13 FIELD COOR/IE 1

1 16 AD FOR ENGR 1

1 17 AD PLANT SYS 1

1 17 AD REAC SFTY 1

l 19 AD SYS/PROJ 1

1 22 DIR DPM 1

23 OELD 1

1 l

AD/ SITE TECH 1

DIRECTOR DSE 1

1 GEOSCIENCES BR 1

L STRUCT ANLYS BR 1

1 i

IXTERNAL: 03 LPDR 1

04 NSIC 1

24 ACRS 16 1

i 1

I t

l avh 3 L 8:s j

l i

l l

l l

NPr I e

I O

fh[I TOTAL NUMBER.0F COPIES REQUIRED: LTTR 43 ENCL 43