ML20104A803
| ML20104A803 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 09/02/1992 |
| From: | Sieber J DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| TAC-M84229, NUDOCS 9209140156 | |
| Download: ML20104A803 (3) | |
Text
..
- v9 W ty EhAref $1Jit00 s-,n,,-
9 i
September 2, 1992 4
JO.W D 54 9t R (Aff up 64lh 3El ! 2%
Yse thesdtet - NJC fd8 i
l
'j.
U.
S. Nuclear Regulatory Commission Attn:
Document' Control Desk l
Washington, DC 20555
Subject:
Beaver Valloy Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Correction to Proposed Operating License Change Roqunst.
j No. 198 j'
(TAC No. 84229) 1.
j.
Reference:
_ Proposed Operating License Change RequeC a
l j
No. 198 (TAC No. 84229), dated August _18, 1992 I
4-Attachr.ent D-was provided in the above referenced. request to liet i
those surveillances for which a surveillance interval extension ~in-requested.-
Several surveillances were omitted from that submitta3.
j Therefore, please repltce Attachment D with the corrected attachment dR i
which includes'the following additional surveillances:
i Survaillance 1
Recuirement Function Que Date i-4.4.11.3 Valve-Exercise 3/21/93
[
4.5.2.f Valve Exercise
~3/13/93 1.5.3.1 Valve Exercise 3/13/93 4.6.3.1.2.f Valve Exercise 3/21/93
- 4.7.3.1.c
'alve Exercise 3/21/93 4.4.5.3 steam Generator 1/11/93-Category C-3 Inspection Sincerely, i
4-6-
t
- l j
i
/
D.
Sieber Attachment-W.'R'ssbach,- Sr.sResident Inspector
~
l cc: Mr. L.
o P
Mr. T.'T.-Martin, NRC Region"I Administrator
'l Mr. A. W. De Agazio,-Project Manager Mr._T. M. Gerusky,: Director BRP/ DER Mr. R. JanatijnBRP/ DER-Mr. M. L.
Bowling--- (VEPCO) i 9209140156 920902
~'
{;
<*nnn PDR-ADOCK 05000334 I-h
- P-PDR
~
a
[
N ATTACHMENT D j
Beaver Valley Power Station, Unit No. 1 Proposed Operating License Change No. 198 j
EXTENDED TECHNICAL SPECIFICATION SURVEILLANCES i
Technical Specification - 4.3.1.1.1 Table 4.3-1 Due 2/27/93 Reactor Trip System Instrumentation -
Channel Calibration and Functional Test i
Technical Specification - 4.3.1.1.3 Table 3.3-2 Due 3/30/93 i
Reactor Trip System Instrumentation -
Response Times Technical Specification - 4.3.2.1.1 Table 4.3-2 Due 3/2/93 Engineered Safety Feature Actuation System Instrumentation -
Channel-Calibration and Functional Test Technical Specification - 4.3.2.1.3 Table 3.3-5 Due 3/2/93 3
Engineered Safety Feature Actuation System Instrumentation -
Response Times Technical Specification -. '
3.1 Table 4.3-3 Due 3/4/93 Radiation Monitoring Inst umentation -
i Channel Calibration l
Technical Specification - 4.3.3.3.1 Table 4.3-4 Due 3/11/93 Seismic Monitoring Instrumentation -
Channel Calibration Technical Specification - 4.3.3.5 Tablo 4.3-6 Due 3/3/93 Remote Shutdown Instrumentation -
Channel Calibration f
i Technical Specification - 4.3.3.8 Table 4.3-7
-Due 3/9/93 Accident Monitoring Instrumentation -
Channel Calibration Technical Specification - 4.4.5.3 Due 1/11/93 4
j Steam Generator Category C-3 Inspection
+
l
' Technical Specification - 4.4.9.3.1.b Due 3/11/93 Overpressure Protection System -
Channel Calibration i
Technica1LSpecification - 4.4.11.1.b Due 3/9/93 PORV Operabi'lity - Channel Calibration 4
Technical Specification - 4.4.11.3 Due 3/21/93 Valve Exercise Technical Specification - 4.5.1.2.b-Due 3/12/93' Accumulator' Operability - Channel Calibration l'
l Technical Specification - 4.5.2.f Due 3/13/93 Valve' Exerc.4se
.T
ATTAQHMENT D (continued) f Beaver Valley Power Station, Unit No. 1 Pr.oposed Operating License Change No. 198 Technical Specification - 4.5.3.1 Due 3/13/93 Valve Exercise Technical Specification - 4.6.3.1.2.e Due 3/8/93 Containment Isolation Valves - Check Valve Lift Test Technical Specification - 4.6.3.1.2.f Due 3/21/93 Valve Exercise Technical Specification - 4.7.3.1.c Due 3/21/93 Valve Exercise Technical Specification - 4.7.13.1.b Due 4/21/93 Auxiliary River Water System Test Technical Specification - 4.8.1.1.1.b and 4.8.1.2 Due 3/10/93 Emergency Switchgear Operation and Diesel Generator Auto Load Tests Technical Specification - 4.8.1.1.2.b Due 4/26/93 Diesel Generator Test and Inspection Technical Specification - 4.8.2.3.2 Due 3/6/93 DC Distribution - Battery Cell Conditions and Charger Capacity Technical-Specification - 4.8.2.4.2 Due 3/6/93 DC Distribution - Battery and Charger Service Testing l
i i
f' y'
m g.-..
+.