Correction to 920818 Proposed OL Change Request 198 to License DPR-66,consisting of Listing of Surveillance for Which Surveillance Interval Extension Requested
ML20104A803
Person / Time
Site: Beaver Valley
Issue date: 09/02/1992
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-M84229, NUDOCS 9209140156
Download: ML20104A803 (3)


Text

..

  1. v9 W ty EhAref $1Jit00 s-,n,,-

9 i

September 2, 1992 4

JO.W D 54 9t R (Aff up 64lh 3El ! 2%

Yse thesdtet - NJC fd8 i

l

'j.

U.

S. Nuclear Regulatory Commission Attn:

Document' Control Desk l

Washington, DC 20555

Subject:

Beaver Valloy Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Correction to Proposed Operating License Change Roqunst.

j No. 198 j'

(TAC No. 84229) 1.

j.

Reference:

_ Proposed Operating License Change RequeC a

l j

No. 198 (TAC No. 84229), dated August _18, 1992 I

4-Attachr.ent D-was provided in the above referenced. request to liet i

those surveillances for which a surveillance interval extension ~in-requested.-

Several surveillances were omitted from that submitta3.

j Therefore, please repltce Attachment D with the corrected attachment dR i

which includes'the following additional surveillances:

i Survaillance 1

Recuirement Function Que Date i-4.4.11.3 Valve-Exercise 3/21/93

[

4.5.2.f Valve Exercise

~3/13/93 1.5.3.1 Valve Exercise 3/13/93 4.6.3.1.2.f Valve Exercise 3/21/93

- 4.7.3.1.c

'alve Exercise 3/21/93 4.4.5.3 steam Generator 1/11/93-Category C-3 Inspection Sincerely, i

4-6-

t

- l j

i

/

D.

Sieber Attachment-W.'R'ssbach,- Sr.sResident Inspector

~

l cc: Mr. L.

o P

Mr. T.'T.-Martin, NRC Region"I Administrator

'l Mr. A. W. De Agazio,-Project Manager Mr._T. M. Gerusky,: Director BRP/ DER Mr. R. JanatijnBRP/ DER-Mr. M. L.

Bowling--- (VEPCO) i 9209140156 920902

~'

{;

<*nnn PDR-ADOCK 05000334 I-h

P-PDR

~

a

[

N ATTACHMENT D j

Beaver Valley Power Station, Unit No. 1 Proposed Operating License Change No. 198 j

EXTENDED TECHNICAL SPECIFICATION SURVEILLANCES i

Technical Specification - 4.3.1.1.1 Table 4.3-1 Due 2/27/93 Reactor Trip System Instrumentation -

Channel Calibration and Functional Test i

Technical Specification - 4.3.1.1.3 Table 3.3-2 Due 3/30/93 i

Reactor Trip System Instrumentation -

Response Times Technical Specification - 4.3.2.1.1 Table 4.3-2 Due 3/2/93 Engineered Safety Feature Actuation System Instrumentation -

Channel-Calibration and Functional Test Technical Specification - 4.3.2.1.3 Table 3.3-5 Due 3/2/93 3

Engineered Safety Feature Actuation System Instrumentation -

Response Times Technical Specification -. '

3.1 Table 4.3-3 Due 3/4/93 Radiation Monitoring Inst umentation -

i Channel Calibration l

Technical Specification - 4.3.3.3.1 Table 4.3-4 Due 3/11/93 Seismic Monitoring Instrumentation -

Channel Calibration Technical Specification - 4.3.3.5 Tablo 4.3-6 Due 3/3/93 Remote Shutdown Instrumentation -

Channel Calibration f

i Technical Specification - 4.3.3.8 Table 4.3-7

-Due 3/9/93 Accident Monitoring Instrumentation -

Channel Calibration Technical Specification - 4.4.5.3 Due 1/11/93 4

j Steam Generator Category C-3 Inspection

+

l

' Technical Specification - 4.4.9.3.1.b Due 3/11/93 Overpressure Protection System -

Channel Calibration i

Technica1LSpecification - 4.4.11.1.b Due 3/9/93 PORV Operabi'lity - Channel Calibration 4

Technical Specification - 4.4.11.3 Due 3/21/93 Valve Exercise Technical Specification - 4.5.1.2.b-Due 3/12/93' Accumulator' Operability - Channel Calibration l'

l Technical Specification - 4.5.2.f Due 3/13/93 Valve' Exerc.4se

.T

ATTAQHMENT D (continued) f Beaver Valley Power Station, Unit No. 1 Pr.oposed Operating License Change No. 198 Technical Specification - 4.5.3.1 Due 3/13/93 Valve Exercise Technical Specification - 4.6.3.1.2.e Due 3/8/93 Containment Isolation Valves - Check Valve Lift Test Technical Specification - 4.6.3.1.2.f Due 3/21/93 Valve Exercise Technical Specification - 4.7.3.1.c Due 3/21/93 Valve Exercise Technical Specification - 4.7.13.1.b Due 4/21/93 Auxiliary River Water System Test Technical Specification - 4.8.1.1.1.b and 4.8.1.2 Due 3/10/93 Emergency Switchgear Operation and Diesel Generator Auto Load Tests Technical Specification - 4.8.1.1.2.b Due 4/26/93 Diesel Generator Test and Inspection Technical Specification - 4.8.2.3.2 Due 3/6/93 DC Distribution - Battery Cell Conditions and Charger Capacity Technical-Specification - 4.8.2.4.2 Due 3/6/93 DC Distribution - Battery and Charger Service Testing l