Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20104B151 + (08:33:13, 13 December 2024)
- ML20104B148 + (08:33:14, 13 December 2024)
- ML20104B147 + (08:33:15, 13 December 2024)
- ML20104B146 + (08:33:16, 13 December 2024)
- RBG-19914, Interim Deficiency Rept DR-274 Re Field Wiring to Asco & Target Rock Corp Solenoid Valves.Next Rept Anticipated by 850227 + (08:33:17, 13 December 2024)
- NRC-92-0111, Forwards Rev 6 to Radiological Emergency Response Preparedness Plan. Rev Clarifies Conditions & Indications in Table D-1 Re Clarification of Emergencies & Modifies Text to Reflect NRC-approved Amend 82 to TSs Issued 920609 + (08:33:19, 13 December 2024)
- ML20104B121 + (08:33:21, 13 December 2024)
- RBG-19915, Interim Deficiency Rept DR-213 Re Pressure Setting on Safety Relief Valves for Air Start Sys Air Receivers on HPCS Diesel Generator Supplied by Ge.Next Rept Will Be Provided by 850306 + (08:33:22, 13 December 2024)
- RBG-19916, Interim Deficiency Rept DR-197 Re Seismic Testing of Category I Leakage Control Sys Air Compressor Used for Penetration Valves.Next Rept Anticipated by 850219 + (08:33:23, 13 December 2024)
- ML20104B104 + (08:33:23, 13 December 2024)
- ML20104B092 + (08:33:24, 13 December 2024)
- ML20104B085 + (08:33:25, 13 December 2024)
- ML20104B080 + (08:33:26, 13 December 2024)
- ML20104B084 + (08:33:26, 13 December 2024)
- ML20104B079 + (08:33:27, 13 December 2024)
- 05000272/LER-1984-028, :on 841223,reactor Trip Initiated.Caused by Technician Error While Reducing Power Range High Flux Trip Setpoints.Corrective Actions Restricted to Individual Responsible for Occurrence + (08:33:29, 13 December 2024)
- ML20104B075 + (08:33:30, 13 December 2024)
- ML20104B061 + (08:33:31, 13 December 2024)
- ST-HL-AE-4206, Monthly Operating Rept for Aug 1992 for South Texas Project Units 1 & 2 + (08:33:32, 13 December 2024)
- RBG-19-937, Forwards Rev to FSAR Section 3.8.2.7.1.1,superseding Util Re Initial Structural Acceptance Test of Containment Vessel.Rev Will Be Included in Future FSAR Amend + (08:33:32, 13 December 2024)
- SNRC-1995, Requests Approval of Decommissioning Plan Change,Revising Methodology for Removal of Two Containment HX of RHR Sys. Possibility Exists That HX Shells May Need to Be Cut Into Several Sections to Enable Removal + (08:33:33, 13 December 2024)
- 05000458/LER-1992-007, :on 920326,motor Operated Valve Vulnerabilty to Hot Shorts Discovered During Review of NRC Info Notice 92-018.Caused by Lack of Thermal Overload Protection.Control Circuitry for Affected MOVs Will Be Reworked + (08:33:35, 13 December 2024)
- ML20104B000 + (08:33:37, 13 December 2024)
- ML20104B003 + (08:33:37, 13 December 2024)
- ML20104A998 + (08:33:38, 13 December 2024)
- 05000328/LER-1992-007-02, :on 920508,discovered That Both Containment Spray Pump Suction Valves Closed,Rendering Both Trains of Containment Spray Inoperable.Caused by Failure to Implement Configuration Control.Walkdown Completed + (08:33:40, 13 December 2024)
- ML20104A963 + (08:33:45, 13 December 2024)
- RBG-37-453, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/92-21 on 920608-12.Corrective Actions:Feedwater Piping Elbow Returned to Supplier for Repair & Util Issued 10CFR21 Rept on 920618 Reporting Min Wall Violation + (08:33:45, 13 December 2024)
- ML20104A960 + (08:33:46, 13 December 2024)
- ML20104A957 + (08:33:47, 13 December 2024)
- ML20104A956 + (08:33:48, 13 December 2024)
- ML20104A954 + (08:33:49, 13 December 2024)
- ML20104A951 + (08:33:50, 13 December 2024)
- ML20104A937 + (08:33:51, 13 December 2024)
- ML20104A936 + (08:33:51, 13 December 2024)
- ML20104A932 + (08:33:52, 13 December 2024)
- ML20104A931 + (08:33:53, 13 December 2024)
- JPN-92-046, Responds to NRC 920520 Request for Addl Info Based on Review of 910913 Submittal of Ipe,In Response to Generic Ltr 88-20, IPE for Severe Accident Vulnerabilities + (08:33:54, 13 December 2024)
- ML20104A909 + (08:33:56, 13 December 2024)
- ML20104A914 + (08:33:56, 13 December 2024)
- ML20104A903 + (08:33:57, 13 December 2024)
- ML20104A901 + (08:33:58, 13 December 2024)
- ML20104A899 + (08:33:59, 13 December 2024)
- ML20104A896 + (08:34:00, 13 December 2024)
- ML20104A889 + (08:34:01, 13 December 2024)
- ML20104A888 + (08:34:02, 13 December 2024)
- ML20104A885 + (08:34:03, 13 December 2024)
- ML20104A882 + (08:34:05, 13 December 2024)
- 3F0185-17, Submits Further Response to Generic Ltr 81-21.Util Plans to Adopt Gpu Nuclear Analytical Approach for Plan to Install Reactor Vessel Head Vent in Chicago Reactor-3,assuming NRC Will Grant Exemption.Plan Anticipated by 850315 + (08:34:06, 13 December 2024)
- ML20104A869 + (08:34:07, 13 December 2024)
- ML20104A868 + (08:34:12, 13 December 2024)