ML20104B075

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1992 for WCGS
ML20104B075
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/31/1992
From: Bailey J, Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NO-92-0271, NO-92-271, NUDOCS 9209140333
Download: ML20104B075 (7)


Text

,. _ -

~ _,

i f

-1 l~

WipLF CREEK 4

NUCLEAR OPERATING CORPORATION September 9, 1992

,,n 3. goii,7 Vice President NO 92-02il operatens l~

U.

S. Nuclear Regulatory Commission j

ATTN: Docurent Control Desk j

Mail Station Pl-137 l-Washington, D.

C.

20555

{

i l

Subject:

Docket No. 50-482:

August,.1992, Monthly j

Operating Report-l Gentlemen:

1 Attached is the August, 1992,. Monthly Operating Report for Wolf Creek' l

Generating Station. This submittal is being made in accordance witr the j

requirements of Technical Specificatien 6.9.1.8.

i Very truly yours, i

j s

gg 14 M

/

j John A.' Bailey 3

j Vice President

' Operations JA6,jra l-Attachment f'

cc:

A. T. Howell~ (NRC), w/a-J.

L. Milhoan' (NRC), w/a l

G.

A.' Pick (NRC), -w/a.

l=

W. D. Reckley (NRC), w/a i

it 1-p o

l-i 1.4 000 9209140333 920831 180x 411 t Burlington, KS f 6839 / Phone: (316) 364-8831 M-

' kl ~

PDR ADOCK 05000482 R

PDR An Equal Opporturuty Employer M F/HOYET

./

S 4

Attachment to NO.92-0271 WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION MONTHLY OPERATING REPORT MONTH:

Aunust -YEAR:

1991 Docket No.:.50-482 i

Facility Operating acense No.:.NPF-42 Report No.

90 1

4 l'

Prepared by:

Mt: clin G. Williams i

F l

l l-1 1

.--....r..-.

1 i

+

1 l

Attachment to NO 92-0271 1

i i

SUMMARY

K i

The following report highlights the opo. >:)g experience of Wolf Creek j

Generating Station-for_the month of Au,2v 1992.

This report is being provided pursuant to Technical Specif car,on t.).1.8.

l I.

SUMMARY

OF OPERATING EXPERIENCE i

l The unit operated at or near.100% pouar throughout the month of August with j

the exception of a power reduction following the loss of a 345 kV line.-

{

1he powe" reduction occurred on August 11, 1992 following the loss of the j

345 kV Lacygne line to ensure that grid stability would be maintained if a i

second line was lost.

Power was reduced to 80 percent for approximately 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

Power was returned to 100 percent after the 345 kV line was' returned to service.

II.

MAJOR SAFETY RELATED MAINTENANCE ACTIVITIES No major safety related maint;tance activities wete performed during the month of August.

T i

i l

Wolf Creek Generating Station

]

Monthly Operating Report l-August 1992 f

Page 1 of 5 l

- l l-l 7

--- =-

w----

e-w.-y--

we r-9 9

,.,w1 y-9 9

f y

.g,g-s-.-

~._

4 Attachment to NO 92-0271 4-OPERATING DATA REPORT DOCKET NO.' _50-482

}

WOLF CREEK GENERATING STATION-WOLF CREEK NUCLFAR OPERATING CORPORATION ~

j DATE 09-04-92 l

COMPLETED BY M. Williams TELEPHONE 316-364-8831

]

OPERATING STATUS i

1.

ReLorting Period:

August. 1992 Gross Hours in Reporting Period:

744 l

2.

Currently Authorized Power Level (MWt): 3411 Mar. Depend. Capacity (MWe-Net): 1131.

j

}

Design Electrical Ratin,; (MWe-Net):

1170 i

3.

Power Level to Which Restricted (If Any)(MWe-Net):

N/A

}

4 Reasons for restriction (If Any):

N/A l

This Month Yr. to Date Cumulative i

5.

Number of Hours Reactor was Critical 744.0 4.709.1 48.399.2 i

6.

Reactor Reserve Shutdown Hours 0.0 0.0 339.8 l

7.

Hours Generator on Line 744.0' 4.641.5

'47.753.7 i

j_

8.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 i

j 9.

Gross Thermal Energy Generated (MWH) 2.531.360 15.615.534 155. 7 t: 9.12 5 10.

Grosa Electrical Energy Generated (MWH)

'881.043

-5.444.676 54.158.182 11.

Net Electrical Energy Generated (MWHi 846.478 5.189.465 51.644.936_

i' 12.

Reactor Service Factor 100.0 80.4 78.9 l

13.

Reactor Availability Factor 100.0 80.4-79.5 l

14.

Unit Service Factor 100.0 79.3-77.9 15.

Unit Availability Factor 100.0 79.3 77.9 16.

Unit' Capacity Factor (Using MDC) 100.6 78.4'

-74.4

'l l-17.

Unit Capacity Factor (Using Design MWe) 97.2 75.8 72.

,l 1

18.

Unit Forced' Outage Rate 0.0 20.7 6.7 19.

Shatdowns Scheduled Over Next 6 Months (Type, Date, and' Duration of each): N/A i

{

20.

If Shut Down at End of Report Period, Estimated Date of Startup:

N/A I'

Wolf Creek Generating Station Monthly Operating Report August 1992 l

Page 2 of 5-

- _ - ~.

i Attachmont to NO 92-0271

}

l AVERAGE DAILY UNIT POWER LEVEL i

DOCKET NO.

50-482 WOLF CREEK GENERATING STATION i

VOLF CREEK NUCLEAR OPERATING CORPORATION l

DATE 09-04-92 l

COMPLETED BY M. Williams-i TELEPHONE 316-364-8837 l-MONTH August. 1992 le DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVELL

{

(MWe-Net)

(HWe-Net)

I 1

1141 17 1141 2

1140 18 1140 i

l 3

1139 19 1139 i

j 4

1138 20 1139 5

1141 21 1138 i

6 1141 22 1139' 4

i f

l 7

1141 23 1140 1

8 1139 24 1127 i

i 9

1139 25

'1138 10 1137 26 1141 1

11 1094

.27

'1147 i

I l

12 1137 28

-1142-L i

13-1136 29 1143 l

.14 1140 30 _,

1143 15, 1131

-31 1143-116-1141 3;

3 i-L 4

Wolf Creek Generating Station-Monthly Operating. Report August 1992'

}

Page-3 of!5-4 n-y-

m,~,

~

+ - - -

..w-,..

--e-.

Attachment to NC 92-G271 Uti1T SHUTDOWN AND POWER REDUCTIONS DOCKET NO.

50 482 WOLF CREEK GENERATIhG STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 09-04-92 COMPLETED BY M.

Williams REPORT MONTH August 1992 TELEPHONE 316-364-8831 I

TYPE METHOES SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORhr.CTIVE ACTIONS /C0ffiENTS No Date S: SCHEDULED (HOURS)

(1)

OR REDUCING POWER (2)

SUPEARY:

The unit operated at or near 100! power throughout the month of August with the exception of a power reduction on August 11, 1992 following the loss of e 345 kV line.

1) REASON: A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:

1.

MANUAL B: MAINTENANCE CR TEST F: ADMINISTRATIVE 2.

MANUAL SCRAM C: REFUELING G: OPEitATIONAL ERROR (EXPLAIN) 3.

AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4.

CONTINUED 5.

REDUCED LOAD 9.

OTHER Wolf Creek Generating Station Monthly Operating Report August 1992 Page 4 of 5

At'achment to NO 92-0271 t

4 4

WOLF OREEK NUCLEAR OPERATING CORPORATION 4

i j-WOLF CREEK GENERATING STATION i

UNIT NO. I 1

].

MONTH August. 1992 i

SUMHi.RY OF OPERATING EXPERIENCE j

Listed belaw in chronological sequence is a summary of operating experiences for t.is month which required load reduction or resulted in significant non-load related incidents.

j DATE TIME EVENT I

.. August 1, 1992 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />

-Unit at 1007 power.

August 11, 1992 0547 hours0.00633 days <br />0.152 hours <br />9.044312e-4 weeks <br />2.081335e-4 months <br /> Began reducing power to 80 percent due to the loss

-of a 345 kV line.

1155 hours0.0134 days <br />0.321 hours <br />0.00191 weeks <br />4.394775e-4 months <br /> Unit at 100 percent power after the 345 kV line was returned to' service.

August 31, 1992 2400 hoirs Unit at-100I power.

4 l

l l

l l

i i

+

i i

i f

i i;

Wol'f Creek Generating St ation:

Monthly Operating Report-August =1992 Page:S of.5 i

,nn.,--

~

-