ML20104A957

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Aug 1992 for Pbnp Units 1 & 2
ML20104A957
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/31/1992
From: Link B, Peterson D
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-92-106 VPNPD-92-302, NUDOCS 9209140275
Download: ML20104A957 (9)


Text

..

i.. +

i'

. Wisconsin LElectnc 1

POWER COMPANY '

231 W Mchigan,PO Bon 2046 Mhoukee WI 53201 (414) 2212M5 i

j VPNPD-92-302 i

NRC-92-106 s

September 9, 1992 i

Document Control Desk.

U.S.

NUCLEAR REGULATORY COMMISSION-Mail Station P1-137 l

Washington,.D.C.

20555 j-Gentlemen:

DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS

]

POINT BEACH-NUCLEAR PLANT, UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the-

[

Point Beach Nuclear Plant.for the calendar month of August 1992.

l-f Sincerely, Bob Link Vice President

=

Nuclear Power MFB/jg i

cc:

.L.

L.

Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector-i.

4 14iOOx0 L

9209140275.920831 II PDR A00CK 05000266' l

R.

PDR

)suurmor11kvasniEnegrarpwata,e _

o W

OPERATING DATA REPORT DOCIET NO. 50-266 DATJ: September 2, 1992 CAVPLETED BY Don C.

Peterson TELEPHONE:

414-755-2321 Ext. 361 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES
2. REPORTING PERIOD: August - 1992
3. LICENSED THERMAL POWER (MWT):

1518.5

4. NAMEPLATE RATING (GROSS MWE):

523.8

5. DESIGN ELECTRICAL RATING (NET MWE):

497.0

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

509.0.

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE}:

485.0 8.'IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

na

9. POWTR LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):

na

10. REASONS FOR RESTRICTIONS, (IF ANY):

na THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS-IN REPORTING PERIOD 744.0 5,855.0 191,279.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4,577.2 157,967.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 2.4 655.1
14. HOURS GENERATOR ON LINE 744.0 4,507.3 154,936.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH).

1,102,649 6,671,448 217,321,451

17. GROSS ELECTRICAL' ENERGY GENERATED 380,400 2,282,100 73,385,830
28. NET ELECTRICAL ENERGY GENERATED (MWH) 363,636 2,177,168 69,926,941
19. UNIT SERVICE FACTOR 100.0%

77.0%

81.0%

20. UNIT AVAILABILITY. FACTOR _

100.0%

77.0%

81.4%

21. UNIT CAPACITY' FACTOR (USING HDC NET) 100.8%

76.7%

75.0%

I

22. UNIT CAPACITY FACTOR (USING DER NET) 98.3%

74.8%

73.6%

23. UNIT FORCED OUTAGE RATE O.0%

0.5%

1.7%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

none

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

na DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 e

.s.__.

- ~. -. _

't POINT BEACil NUCLEAR PLANT DOCKET No.

50-2/6 -

AVERAGE DAIIX UNIT POWER LEVEL UNIT NAME Point Beach. Unit 1 MONTil AUGUST - 1992 DATE Ser3tember 3.1992 COMPLETED BY D. C. Peterson TELEPilONE 414/755-2321

-AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY-POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET

_DY MWe NET DAY MWe NET 1

491 11 489 21 494 2

492 12 4M8 22 495 3

490 1t 486~

23 455 4

489 it 487 24 495 I

5 488 15 486' 25 494 6

489 16 485 26 495 l

7 490 17 485 27 495 8

491 18 486 28 493 9

488 19 486 29 49c 10 489 20 490 30 490 31 491 m

. PD F 432Sa

~(03-93)

.i

.61

-;,,h.,

.m_

POINT BEACil NUCLEAR PIANT Docket No.

50-2th Unit Name Point Heach. Unit 1 UNIT SilUTDOWNS AND POWER REDUCTIONS Date September 3.1W2 Completed By D. C. Peterson REPORT MONTII AUGUST - IW2 Telephone No.

414/755-2321. Ext. 361 Met txx! of Shutting 2

Ihwn Licensee Event System Cunponent Cause and Corrective Arthm No.

Date Type' Duration Reason i

i I

' F: Forced Reason:

' Method:

' Exhibit G - Instructions 2

S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of Previous Shutdown E - Operator Training &

. 5 - Reduced Imad Licensing Exam F-Administrative 6 - Other (explain)

' Exhibit I - Same Source G - Operational Error (explain)

' H - Other (explain) l 4

l PIJF-CD2Sb (0F90)

I.

I L_.____

s

W

l. O \\

s DOCKET NO.

50-266 UNIT NAME Point Beach Nuclear Plant, Unit 1 DATE September 4, 1992 COMPLETED BY D.

C.

Peterson TELEPHONE (414)755-2321, Extension 361 Unit 1 operated at approximately 489 Mwe not throughout this report period with no significant load reduction.

The gas turbine generator refurbishment project is on schedule.

The reconditioned rotor is to be returned the first week of September, with project completion scheduled for September 27.

Safety-related maintenance included:

1.

Replaced shaft, bearings, and impellers on service water pump.

2.

Replaced magnetic-amplifier and bench calibration pressurizer level-I/I converter.-

3.

Leak checked all connections and re-charged electrical penetration - incore thermocouple connectors - to 15 psi nitrogen prassure.

4.

Installed bonnet locating pin on containment 9 pray pump discharge check level.

5.

Installed seismic mountings to analog instrumentation cabinets 1-C105 through 1-C114 and 1-C115 through 1-C133.

s i

Y

t j

OPERAT7NG DATA REPORT Dw A T NO. 50-301

)

i r

DATE: September 2, 1992 j

g COMPLETED BY: Don C.

Peterson TELEPHONE:

414-755-2123 Ext.361 OPERATING STATUS

{

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2. NOTES

[

2. REPORTING PERIOD: August - 1992
3. LICENSED TIERMAL POWEP (MWT):

1518.5 f

4. NAMEPLT.TE RATING (GROSS MWE):

523.8

5. DESIGN ELECTRICAL RATING (NET MWE):

497.0

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

509.0.

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

485.0 3

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7} SINCE LAST REPORT, GIVE REASONS:

na

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): ria i
10. REASONS FOR RESTRICTIONS,.(IF ANY):

3 na THIS MONTH YEAR 70 DATE CUWJLATIVE l

11. HOURS IN REPORTING PERIOD 744.0 5,855.0 176,064.C
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,855.0 154,584.8 13.. REACTOR RESERVE SHUTDOWN HOURS 0.0 11.6 228.3

[

14. HOURS GENERATOR ON LINE 744.0 5,843.4 152,332.9 4
15. ~JOIT RI*iERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,100,487 8,756,263 218,223,420

[

17. GROSS ELECTRICAL ENE.1GY GENERATED 382,400.

3,017,770 74,177,150 1

18. NET ELECTRICAL ENERGY GENERATED (MWH) 365,276 2,886,247 70,706,025
19. UNIT SERVICE FACTOR 100.0%

99.8%

86.5%

20. UNIT AVAILABILITY FACTOR 100.0%

99.8%

E6.7%

j

21. UNIT CAPACITY FACTOR (USING MDC NET) 101.2%

101.6%

B2.2%

22. UNIT CAPACITY FACTOR (USING DER NET) s3.8%

99.2%

80.8%

23. UNIT FOPCED OUTAGE RATE 0.0%

0.0%

1.1%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Maintenance / Refueling outage scheduled 9/26/92 - 11/12/92 Refueling 18..

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

na

' DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED /EPTEMBER 22, 1977

POINT BEACII NUCLEAR PLANT DOCKET NO.

50-Nil AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unh 2 MONTil AUGUST - 1W2 DATE September 3.1992 COMPLETED BY D. C. Petervm TELEPIIONE 414/755-2121 AVERAGE AVERAGE AVERAGE

' DAILY' DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY-MWe NET DAY MWe NET DAY MWe NET I

494 11 492 21 4tr7

-- 2 455

-12 491 22 49s 3-404 13 49)

L

_ #)$

4 494 14 4W 24 497 5

492 15 4W 25

  1. 2s 6

493 16

  1. 41 26 fr$

7 494 17' ASS 27

  1. 37 I

8

'493 18 499 28 495 9

492 19 4S9 29

  1. 72 10 492 20 494 30
  1. 12 31 494 M

. PBF4XCSa

-(0340)

POINT BEACII NUCLEAR IL\\NT Docket No.

50-911 Unit Name Point Beach. Unit 2 UNIT SIItJTDOWNS AND POMTR REDUCTIONS Date Septemin 1.1W2 Completed By D. C. Peterum REPORT MONTil AUGUST - 1W2 Telephone No.

414/755-2321. Ext. %1

  • Met!wd of Shutting Cause and Correctwe Actse Ikensee D ent System Cranement D-=raten T pe (Ilours)

Reason pyg Repxt.%

Gec*

Code' To Prevent Recurrence i

2 No.

Date 3

l 1

l l

l t

'F: Forced 2Reas<m:

' Method-

' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Mar.zal for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling -

3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Previous Shutdown Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain)

' Exhibit I - Same Source G - Operational Error (explain)

II -_ Other (explain)

- PU F Cl28b-(OM)

...... ~..... _ _ _......

i i

.. i c

r DOCKET NO.

50-301 UNIT NAME Point Beach Unit 2 DATE September 3, 1992 COMPLETED BY D.

C. Peterson TELEPHONE 414/755-2321, Ext. 361 Unit 2 operated at approximately 491 MWe not throughout this

[

report period with no significant load reduction.

Safety-related maintenance included the following:

1.

Re-connected (with spare breaker screws) moveable escutcheon plate pantograph links on feed breaker to a safeguards bus from a station service transformer.

i A

e s-g mew y-yg gr y

g-u y-pe yVy

  • yww--,y-py-wyy-py-

,qy y

9y-y-

ey-w+-y>n,

--+Mr,+p-y-.9,y-y,-p,,f

  • rwFq

't-irT'--t-T--'*-

- 'f 9 -W egtp'm wg yy+-'W--*-'