C9&L Carolina Power & Light Company SERIAL: NLS-85-021 J44 2 8 IS85 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 '& 50-324/ LICENSE NOS. DPR-71 & DPR-62 CERTIFICATION OF COMPLIANCE TO 10CFR50.49, ENVIRONMENTAL QUALIFICATION OF ELECTRICAL EQUIPMENT IMPORTANT TO SAFETY FOR NUCLEAR POWER PLANTS (GENERIC LETTER 84-24)
Dear Mr. Denton:
-Carolina Power & Light Company hereby reports on the status of compliance of Brunswick. Steam Electric Plant, Unit Nos. I and 2 with 10CFR50. 49. We are submitting this information in response to Generic Letter 84-24.
Due to late receipt of the Generic Letter, this letter is being submitted after the specified deadline with the verbal approval of the NRC Project Manager.
The Company certifies that:
(1)
An Environmental Qualification Program designed to satisfy the requirements of 10CFR50.49 is being implemented. Unless an unforeseeable situation develops, we do not plan to request an additional extension beyond the current schedule (the end of the
~,
'! arch 31,1985 outage for Unit 1 and the end of the November 30, 1985
~
outage for Unit 2).
(2)
The program includes the safety-related electrical equipment locatea in a harsh environment which is relied upon to remain functional during and following design basi.s events to ensure the capability to shutdown the reactor and maintain it in a safe shutdown condition. The Company confirms its belief that this equipment has been qualified or that justifications for continued operation (JCOs) for each type of equipment have been submitted.
(3)
The Company also confirms its belief that othar equipment within the scope of the rule has been qualified or that JCOs for each type of equipment have been submitted. This does not include equipment associated with the Regulatory Guide 1.97 effort which is on a schedule identified to the NRC in our letter dated December 27, 1984.
'In addition, the Generic Letter requested that specific IE Bulletins and Information Notices, which identify environmental qualification problems, be considered by licensees. We have in place a mechanism for the review and evaluation of Bulletins and Information Notices. Our evaluation of Bulletins and Information Notices is not limited to those listed in the Generic Letter.
IE Bulletin 82-04 and Infonnation Notices 82-11, 82-52, 83-45, 83-72, 411 Fayettevine Street
- P. C. Box 1551
- Raleigh, N C. 27602 O
~
8502010568 850128 1
PDR ADOCK 05000324
,1 P
PDR c
Mr. Harold R. Denton 84-23, 84,44, 84-47, 5 7, 84-68 and 84-78 have been reviewed and their resolutions have been completed or appropriate action has been identified or is being taken.
We -are enclosing with this letter a list of _the latest pertinent
. correspondence associated with the Environmental Qualification Programs.
If'you.have any questions, please contact Mr. Sherwood R. Zimmerman at (919) 836-6242.
Yours very truly,
/
. B. Cutter - Vi President Nuclear Engineering & Licensing PS/mf (10 75JSD) -
Enclosure-cc:
Mr. D. O. Mycrs (NRC-BNP)
-Mr. J. P. O'Reilly (NRC-RII)
Mr. M. Grotenhuis (NRC)
A.-B. Cutter, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his
'information,-knowledge and belief; and.the sources of his information are officers, employees, contractors, and agents of Carolina Power & Light Company.
tlJ Notary (3eal)~
/
'Mycommissionexpires:d[/8[#-
f.,
..IAR \\,
3 5
j r
P(jg
,,b' bit 4.,,.
p:
.:.;-s
- CORRESPONDENCE ASSOCIATED WITil THE BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 ENVIRONMENTAL QUALIFICATION PROGRAMS Brunswick Steam Electric Plant, Unit No. 1 Date Subject November 30,1984 Program description.
Submittal of revised JCOs.
Brunswick Steam Electric Plant, Unit No. 2 Date Subject
-April 25, 1984 Extension request.
(NLS-84-12 6)
July 6,1984 Additional information regarding (NLS-8 4-30 7) request for schedular extension.
- August. 30, 1984 Supplemental extension request. -
(NLS-8 4-388)
September ' 2 6, 1984 Submittal of revised JCOs.
November 5, 1984 Submittal of revised JCOs.
November 30, 1984 Submittal of ~ additional (NLS-84-491) information.
(10 75JSD/af)