Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20106C836 + (08:06:22, 13 December 2024)
- ML20106C832 + (08:06:23, 13 December 2024)
- ST-HL-AE-4222, Application for Amends to Licenses NPF-76 & NPF-80,changing TS 3.1.1.1 to Remove Variable Shutdown Margin Requirements for Modes 1 & 2 & Reflect That Reactivity Balance Can Only Be Performed When Reactor Critical + (08:06:24, 13 December 2024)
- ML20106C825 + (08:06:24, 13 December 2024)
- ML20106C819 + (08:06:25, 13 December 2024)
- JPN-92-060, Forwards Application for Amend to License DPR-59,revising Tech Spec Flow Requirement for Core Spray Pumps & Associated Bases + (08:06:26, 13 December 2024)
- ML20106C817 + (08:06:26, 13 December 2024)
- 05000301/LER-1992-002-01, :on 920828,discovered That CCW Sys Isolation Valves LW-63 & 64 Not Capable of Performing Intended Function.Caused by Inadequate Design Review.Ccw Sys Boundary Outside Containment Reestablished + (08:06:28, 13 December 2024)
- ML20106C809 + (08:06:29, 13 December 2024)
- ML20106C805 + (08:06:30, 13 December 2024)
- ML20106C803 + (08:06:31, 13 December 2024)
- ML20106C802 + (08:06:32, 13 December 2024)
- JPN-92-057, Forwards Application for Amend to License DPR-59,adding Operability & SR to TS Tables 3.12.1 & 4.12.1 to Reflect Plant Mod to Improve Fire Protection by Installing Automatic Fire Suppression Sys in Battery Room Corridor + (08:06:33, 13 December 2024)
- ML20106C793 + (08:06:34, 13 December 2024)
- ML20106C790 + (08:06:35, 13 December 2024)
- ML20106C775 + (08:06:35, 13 December 2024)
- ML20106C768 + (08:06:36, 13 December 2024)
- ML20106C761 + (08:06:37, 13 December 2024)
- PLA-3858, Forwards Revs to Emergency Response Data Point Library, Submitted Via .Data Revised Contained in Shaded Fields + (08:06:37, 13 December 2024)
- ML20106C754 + (08:06:38, 13 December 2024)
- ML20106C751 + (08:06:39, 13 December 2024)
- ST-HL-AE-1140, Revised Final Deficiency Rept Re Design of RHR Sys.Initially Reported on 820326.Re-evaluation Demonstrates That Use of Atmospheric Head Tank Inside of Reactor Containment Bldg Better Design Solution.Revised Design Drawing Encl + (08:06:39, 13 December 2024)
- JPN-92-055, Forwards Application for Amend to License DPR-59,revising Table 3.2-1, Instrumentation That Initiates Primary Containment Isolation to Reflect Installation of Addl Temp Elements in RWCU Pump Suction Primary Containment + (08:06:40, 13 December 2024)
- ML20106C745 + (08:06:41, 13 December 2024)
- ML20106C727 + (08:06:41, 13 December 2024)
- RBG-37523, Provides Response to Generic Ltr 92-04, Resolution of Issues Related to Recator Vessel Water Level Instrumentation in BWRs Pursuant to 10CFR50.54(f) + (08:06:42, 13 December 2024)
- ELV-04037, NPDES Noncompliance Notification:On 920914,water Discharged from Cooling Tower Basin Via Storm Drain to Retention Pond 1 & Alarm Received in Control Room.Caused by out-of-calibr Level Transmitter.Level Transmitter Will Be Repaired + (08:06:44, 13 December 2024)
- ML20106C715 + (08:06:44, 13 December 2024)
- ML20106C700 + (08:06:45, 13 December 2024)
- JPN-92-061, Provides Response to Generic Ltr 92-04, BWR Reactor Vessel Water Level Instrumentation Issues. Licensee Making Mods to Correct Instrument Line Slopes Prior to Plant start-up as Detailed in Attachment to Ltr + (08:06:46, 13 December 2024)
- ML20106C697 + (08:06:46, 13 December 2024)
- ML20106C694 + (08:06:47, 13 December 2024)
- ML20106C688 + (08:06:48, 13 December 2024)
- BECO-92-113, Responds to Generic Ltr 92-04 Dtd 920819, Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs Pursuant to 10CFR50.54(f) + (08:06:49, 13 December 2024)
- ML20106C676 + (08:06:50, 13 December 2024)
- ML20106C675 + (08:06:51, 13 December 2024)
- ML20106C662 + (08:06:51, 13 December 2024)
- ML20106C660 + (08:06:52, 13 December 2024)
- ML20106C657 + (08:06:53, 13 December 2024)
- ML20106C658 + (08:06:53, 13 December 2024)
- ML20106C654 + (08:06:55, 13 December 2024)
- ML20106C650 + (08:06:55, 13 December 2024)
- ML20106C649 + (08:06:56, 13 December 2024)
- 1CAN099203, Application for Amend to License DPR-51,changing Sodium Hydroxide Tank Level & Deleting Value for Weight of Sodium Hydroxide Specified in TS 3.3.4(B) & Revising Bases for TS 3.3.4 to Reflect New Level Value.Calculation Encl + (08:06:57, 13 December 2024)
- JSP-481-92, Forwards Rev 4 to Clinton Power Station Updated USAR & Clinton Power Station 10CFR50.59 Rept for May 1991 Through May 1992 + (08:06:58, 13 December 2024)
- ML20106C629 + (08:06:59, 13 December 2024)
- SNRC-1144, Revises Previously Transmitted Tdi Emergency Diesel Load Info Re Loss of Offsite Power Loads.Operating Time of Fuel Oil Transfer Pump Also Revised to Operate for 22 Out of Every 48 Minutes + (08:06:59, 13 December 2024)
- W3P85-0365, Summarizes Review of Initial Interviews & Exit Interviews Prior to Exceeding 5% Power,Per 840810 Commitment.Results of Comprehensive Rept Conclude That Issue 16 Satisfactorily Resolved W/No Adverse Effect on Safe Operation + (08:07:00, 13 December 2024)
- ML20106C613 + (08:07:01, 13 December 2024)
- ML20106C589 + (08:07:01, 13 December 2024)
- ML20106C582 + (08:07:02, 13 December 2024)
- ML20106C561 + (08:07:03, 13 December 2024)