Application for Amend to License DPR-59,revising Table 3.2-1 Instrumentation That Initiates Primary Containment Isolation to Reflect Installation of Two Addl Temp Elements in RWCU Pump Suction Primary Containment Penentration
ML20106C751
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/25/1992
From: Ralph Beedle
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20106C749 List:
References
NUDOCS 9210060332
Download: ML20106C751 (1)


Text

.

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMM!SSION in the matter of

)

NEW YORK POWER AUTHORITY

)

Docket No. 50-333 James A. FitzPatrick Nuclear Power Plant

)

liPPLICATIOf4 FOR AMENDMENT TO OPERATING LICENSE The New York Power Authority requests an amendment to the Technical Specifications contained in Appendix A to Facility Operating License DPR 59 for the James A. FitzPatrick Nuclear Power P! ant. Nis application is filed in accordance with Section 10 CFR 50.90 of the Nuclear Regulatory Commission's regulation.

This application for an amendment to the Amos A. FitzPatrick Technical Specifications revisos Table 3.2-1 " Instrumentation that initiates Primary Containment isolation" to reflect a plant modification which installed two additional temperature olomonts, associated cabling, temperature switches and circuitry in the area of the Roactor Water Cleanup (RWCU) pump suction primary containment penetration.

The Authority's equipment qualification program postulated a hi h energy 0

lino break in a nineteen foot section of RWCU pipe that runs betwoon the containment penetration and the RWCU "A" pump room. As a result, two now temperature elements were added to isolate the RWCU system from the reactor vossolin the event of a line break in this area. Six existing temperature elements monitor other RWCU system areas.

The NRC identified that Table 3.2-1 of the FitzPatrick Technical Specifications only listed six RWCU area high temperature instrument channels when ei ht channels were installed in the plant. This proposed 0

chengo adds those two now channels to correct Table 3.2-1 and to reflect the modification.

The proposed chan00s to the Technical Specifications are Attzhment I to this Application for Amendment to the Operating Licenso. The Safety Evaluation for the proposed change is included as Attachment 11.

New York Power Authority

~

alph E.

oeille STATE OF NEW YORK Executive Vice President COUNTY OF WESTCHESTER Nuclear Generation Subscribed and sworn to before me thisfi day of Of4 541992.

N 44A-b GERALDtNE STRAND htery PutA6c, State of New Yort

/ Notary Public No.4901272 QueMed in Westchester 9210060332 900925 m W M 27,1 PDR ADOCK 05000333 P

PDR-

.-