Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- AECM-85-0106, Forwards Summary of Certificates of Insurance for Nuclear Mutual Ltd Policy C85-026,NELIA Policy NX8420,MAELU Policy NXTA1561 & Nuclear Electric Insurance Ltd Policy X84-047 + (05:27:22, 13 December 2024)
- W3P85-0624, Informs of Intent to Apply Previously Approved QA Program to Transport & Packaging of Radwaste Matls Per 10CFR71.101. Program Accepted Via Sser 6 (NUREG-0787),Chapter 17 + (05:27:22, 13 December 2024)
- ML20113A334 + (05:27:23, 13 December 2024)
- 3F0385-23, Application for Amend to License DPR-72,consisting of Rev 0 to Tech Spec Change Request 133,proposing Requirement for post-accident Sampling Sys & Automated Isotopic Monitoring Sys,Per NUREG-0737,Items II.B.3 & II.F.1.2.Fee Paid + (05:27:24, 13 December 2024)
- ML20113A329 + (05:27:24, 13 December 2024)
- ML20113A321 + (05:27:25, 13 December 2024)
- ML20113A320 + (05:27:26, 13 December 2024)
- 3F0385-22, Application for Amend to License DPR-72,consisting of Change Request 134,revising Tech Specs Re Operability & Surveillance Requirements for Reactor Trip Breaker Shunt Trip Attachments,Per Generic Ltr 83-28.Fee Paid + (05:27:27, 13 December 2024)
- ML20113A319 + (05:27:27, 13 December 2024)
- ML20113A311 + (05:27:28, 13 December 2024)
- ML20113A312 + (05:27:28, 13 December 2024)
- ML20113A306 + (05:27:29, 13 December 2024)
- ML20113A305 + (05:27:30, 13 December 2024)
- LD-85-016, Informs of Transportation Error in 830811 Rev to CESSAR App 5A Re Nozzle Elevation of Pressurizer Safety Valve. Corrected Elevation Will Be Included in Future Amend to CESSAR + (05:27:31, 13 December 2024)
- PY-CEI-NRR-0222, Discusses Review of Reg Guides in FSAR Table 1.8-1 Re Preoperational Testing,Operations,Operational QA, Surveillance & Maint,Per Util .Clarifications to Be Added to FSAR Table 1.8-1 in Future Amend Encl + (05:27:32, 13 December 2024)
- ML20113A272 + (05:27:33, 13 December 2024)
- ML20113A285 + (05:27:33, 13 December 2024)
- ML20113A262 + (05:27:34, 13 December 2024)
- ML20113A237 + (05:27:35, 13 December 2024)
- NLS8500058, Forwards Endorsement 66 to Nelia Policy NF-200 + (05:27:35, 13 December 2024)
- ML20113A234 + (05:27:36, 13 December 2024)
- ML20113A233 + (05:27:39, 13 December 2024)
- RBG-20621, Forwards Suppl to Rev 4 to Physical Security Plan.Suppl Withheld (Ref 10CFR2.790).Affidavit Encl + (05:27:40, 13 December 2024)
- ML20113A209 + (05:27:41, 13 December 2024)
- 05000458/LER-1996-011, :on 960516,personnel Error Resulted in Missed Surveillance & Dry Floor Drain Sump Leakage Detection Monitoring Instrumentation Exceeded TS Allowed Outage Times. Appropriate Disciplinary Actions Taken + (05:27:43, 13 December 2024)
- ML20113A180 + (05:27:44, 13 December 2024)
- ML20113A173 + (05:27:45, 13 December 2024)
- ML20113A177 + (05:27:45, 13 December 2024)
- 05000282/LER-1996-010, :on 960520,determined That AFW Pumps Not Protected Against Runout for All Accident Conditions.Caused by Original Design of Afws Not Including Runout Protection for AFW Pumps.Procedures Revised + (05:27:47, 13 December 2024)
- ML20113A167 + (05:27:49, 13 December 2024)
- ML20113A161 + (05:27:50, 13 December 2024)
- ML20113A164 + (05:27:50, 13 December 2024)
- RBG-43019, Forwards Response to Exercise Weaknesses Noted Insp Rept 50-458/96-07 on 960415-19.Corrective Actions:Results of Exercise Reviewed W/Emergency Response Organization Members & Being Reviewed W/Operations Crews + (05:27:52, 13 December 2024)
- ML20113A160 + (05:27:52, 13 December 2024)
- ML20113A157 + (05:27:53, 13 December 2024)
- ML20113A152 + (05:27:54, 13 December 2024)
- ML20113A149 + (05:27:55, 13 December 2024)
- ML20113A146 + (05:27:56, 13 December 2024)
- BSEP-82-1754, Semiannual Environ & Effluent Release Rept,Jan-June 1982 + (05:27:58, 13 December 2024)
- ML20113A137 + (05:27:59, 13 December 2024)
- ML20113A131 + (05:28:00, 13 December 2024)
- ML20113A135 + (05:28:00, 13 December 2024)
- ML20113A128 + (05:28:01, 13 December 2024)
- 05000373/LER-1985-024-01, :on 850303,reactor Scram Occurred,Resulting from Turbine Control Valve Fast Closure.Caused by Offsite Fault on 345-kv Transmission Line 0101.Lines 0101 & 0104 Inspected + (05:28:03, 13 December 2024)
- ML20113A121 + (05:28:05, 13 December 2024)
- ML20113A115 + (05:28:08, 13 December 2024)
- ML20113A112 + (05:28:10, 13 December 2024)
- DCL-85-112, Public Version of Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 4 to EP OR-1 Re Offsite Support & Assistance & Rev 3 to OR-2 Re Release of Info to Public & 850401 Release Memo + (05:28:11, 13 December 2024)
- ML20113A102 + (05:28:12, 13 December 2024)
- ML20113A095 + (05:28:12, 13 December 2024)
- ML20113A092 + (05:28:13, 13 December 2024)
- ML20113A089 + (05:28:14, 13 December 2024)