Provides Notice of Completion of Rod Control Sys Timing Mod
ML20113A209
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 06/18/1996
From: Diprofio W
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NYN-96040, NUDOCS 9606240169
Download: ML20113A209 (2)


Text

(

i

%% l 5

,4 North North Atlantic Energy Service Corporat. m P.O. Box 300 {

h $ Atlantic seahreet, Nii O3874 (603) 474-9521 i

The Northeast Utilities System JN I 81996 l Docket No. 50-443 l l NYN-96040 i

United States Nuclear Regulatory Commission l Attention: Document Control Desk Washington, DC 20555 Seabrook Station Notice of Comnletion of Rod Control Timing Modification North Atlantic Energy Service Corporation (North Atlantic) committed by letter dated November 1, 1994', to install a Rod Control System timing modification during Refueling Outage 4. The NRC, in a 2 '

letter dated February 22,1995 confirmed the installation date and requested that North Atlantic provide notification of completion. This letter provides the requested notification. The Rod Control System timing modification was implemented during Refueling Outage 4 and was declared operational on December 6,1995. This letter also documents North Atlantic's commitment to perform a Rod Control System current order verification surveillance each refueling outage as recommended by the l Westinghouse Owners Group.

l Should you have any questions concerning this matter, please contact Mr. Anthony M. Callendrello, Licensing Manager, at (603) 474-9521, extension 2751.

l Very truly yours, NORTH ATLANTIC ENERGY SERVICE CORP.

Ag;fx William A. DiProfi[

Station Director  !

l l cc: T. T. Martin, Region I Administrator l

A. W. De Agazio, NRC Project Manager, Seabrook Station J. B. Macdonald, Senior Resident inspector, Seabrook Station

' NAESCO Letter NYN-94124 dated November 1,1994," Implementation Schedule for Generic Letter 93-04, Rod Control System Timing Modification"

  • USNRC Letter dated February 22,1995," Resolution of Generic Letter 93-04, Rod Control System Failure and Withdrawal of Rod Cluster Control Assemblies" 240034 9606240169 960618 '

PDR P

ADOCK 05000443 PM 4\

i l

j l

s __

^

,, United States Nuclear Regulitory Commission

. NYN-96040/Page 2 STATE OF NEW liAMPSlilRE Rockingham, ss. June 18,1996 i

Then personally appeared before me, the above-named William A. DiProfio, being duly sworn, did state that he is Station Director - North Atlantic Energy Service Corporation, that he is duly authorized to execute and file the foregoing information in the name and on the behalf of North Atlantic Energy Service Corporation and that the statements therein are true to the best of his knowledge and belief.