3F0385-23, Application for Amend to License DPR-72,consisting of Rev 0 to Tech Spec Change Request 133,proposing Requirement for post-accident Sampling Sys & Automated Isotopic Monitoring Sys,Per NUREG-0737,Items II.B.3 & II.F.1.2.Fee Paid

From kanterella
Jump to navigation Jump to search
Application for Amend to License DPR-72,consisting of Rev 0 to Tech Spec Change Request 133,proposing Requirement for post-accident Sampling Sys & Automated Isotopic Monitoring Sys,Per NUREG-0737,Items II.B.3 & II.F.1.2.Fee Paid
ML20113A323
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/29/1985
From: Westafer G
FLORIDA POWER CORP.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20113A327 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.3, TASK-2.F.1, TASK-TM 3F0385-23, 3F385-23, GL-83-37, NUDOCS 8504100200
Download: ML20113A323 (5)


Text

-

r .,

ese o

S  %

eee Power CORPOR ATION March 29,1985 3F0385-23 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Technical Specification Change Request No.133

Dear Sir:

Enclosed are three (3) originals and forty (40) copies of Technical Specification Change Request No.133 requesting amendment to Appendix A of Operating License No. DPR-72.

As part of this request, proposed replacement pages for Appendix A are enclosed.

This submittal proposes a programmatic technical specification requirement for the post-accident sampling system and the automated isotopic monitoring system.

An amendment application fee, check number 722340, of one hundred fifty dollars ($150), as required by 10 CFR 170, has been included with this Change Request.

Sincerely,

/

G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management PGH/feb Enclosures k cc: Dr. 3. Nelson Grace i Ih Regional Administrator, Region II f Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission t { *>' fl%j0 101 Marietta Street N.W., Suite 2900 i 04L' g Atlanta, GA 30323 ()

8504100200 850329 PDR ADOCK 05000302 P PDR GENERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151

STATE OF FLORIDA COUNTY OF PINELLAS G. R. Westafer states that he is the Manager, Nuclear Operations Licensing and Fuel Management for Florida Power Corporation; that he is authorized on the part of said company to sign and file with the

- Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief.

YJ G. R. Westafer j

/

Manager, Nuclear Operations Licensing and Fuel Management Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 29th day of March,1985.

/

Notary Public Notary Public, State of Florida at Large, My Commission Expires: November 19,1986

UNITED STATES OF AMERICA .

NUCLEAR REGULATORY COMMISSION IN THE MATTER OF )

) DOCKET No. 50-302 FLORIDA POWER CORPORKTION )

CERTIFICATE OF SERVICE G. R. Westafer deposes and says that the following has been served on the Designated State Representative and the Chief Executive of Citrus County, Florida, by deposit in the United States mall, addressed as follows:

Chairman, Administrator Board of County Commissioners Radiological Health Services of Citrus County Department of Health and Citrus County Courthouse Rehabilitative Services Inverness, FL 32650 1323 Winewood Blvd.

Tallahassee, FL 32301 A copy of Technical Specification Change Request No. 133 requesting -

amendment to Appendix A of Operating Licensing No. DPR-72.

FLORIDA POWER CORPORATION J

G. R.'Westafer /

Manager, Nuclear Operations Licensing and Fuel Management SWORN TO AND SUBSCRIBED BEFORE ME THIS 29th DAY OF MARCH 1985.

}Ch /./}1tt Y Notary Public j Notary Public, State of Florida at Large My Commission Expires: November 19,1986 (NOTARIAL SEAL) k g

) ,j'

I FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NO. 50-302/ LICENSE NO. DPR-72 REQUEST NO.133, REVISION O POST-ACCIDENT SAMPLING AND ANALYSIS LICENSE DOCUMENT INVOLVED: Technical Specifications PORTION: 6.17 Post-Accident Sampling and Automated Isotopic Monitoring Systems (New Section)

=

DESCRIPTION OF REQUEST:

Add a programmatic requirement to the Administrative Controls, Section 6, specifying implementation of a Post-Accident Sampling and Analysis Program. Specifically, add:

6.17 Post-Accident Sampling and Automated Isotopic Monitoring Systems 6.17.1 Procedures shall be established, implemented, and maintained to obtain and analyze reactor coolant and containment atmosphere samples. Additional procedures shall address obtaining and analyzing radioactive lodines and particulates in plant gaseous effluents. The procedures shall include the following:

1. Samp!!ng and analysis, and
2. Maintenance of sampling and analysis equipment.

Personnel shall be trained in the use of the above systems.

REASON FOR REQUEST:

This change is being provided at the request of the NRC Staff pursuant to NUREG-0737 Items II.B.3 and II.F.1.2 and Generic Letter 83-37.

EVALUATION OF REQUEST:

This is a purely administrative change required by the NRC to document a program already implemented.

4 FLORIDA POWER CORPOPATION CRYSTAL RIVER UNIT 3 DOCKET NO. 50-302/ LICENSE NO. DPR-72 REQUEST NO.133, REVISION 0 SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION DESCRIPTION OF REQUEST:

This submittal requests the addition of a programmatic requirement to the Technical Specifications to document the Post-Accident Sampling and Analysis Program. This requirement is being added pursuant to Generic Letter 83-37.

SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION:

( %) Amendment is not likely to involve a significant hazards consideration.

( ) Amendment is likely to involve a significant hazards consideration.

BASIS FOR DETERMINATION:

Pursuant to 10 CFR 50.92, Florida Power Corporation considers this Amendment to be similar to Example (ii) of that section. This Amendment constitutes an additional limitation not presently included in the Technical Specifications.

_ _ . . __._