Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PY-CEI-NRR-1533, Responds to Violations Noted in Insp Rept 50-440/92-11 on 920527-0615.Corrective Actions:Fill & Vent Summary Sheet, Containing Instruments from All Three RHR Loops,Will Be Eliminated & Operations Personnel Will Be Trained + (05:05:00, 13 December 2024)
- ML20113J022 + (05:05:01, 13 December 2024)
- ML20113J014 + (05:05:01, 13 December 2024)
- ML20113J013 + (05:05:02, 13 December 2024)
- ML20113J010 + (05:05:03, 13 December 2024)
- ML20113J007 + (05:05:03, 13 December 2024)
- ML20113J000 + (05:05:05, 13 December 2024)
- ML20113H995 + (05:05:06, 13 December 2024)
- ML20113H989 + (05:05:07, 13 December 2024)
- ML20113H984 + (05:05:08, 13 December 2024)
- ML20113H974 + (05:05:08, 13 December 2024)
- ML20113H967 + (05:05:09, 13 December 2024)
- ML20113H966 + (05:05:10, 13 December 2024)
- TXX-9236, Forwards Rev to Data Point Library,Initially Submitted Via ,As Part of Erds.Rev Contains Info to Reverify Contents &/Or Changes to Library Resulting from Installation & Testing of Computer,Per Generic Ltr 89-15 + (05:05:11, 13 December 2024)
- 0CAN079211, 1991 Annual 10CFR50.59 Rept,Arkansas Nuclear One + (05:05:12, 13 December 2024)
- ML20113H944 + (05:05:12, 13 December 2024)
- ML20113H937 + (05:05:13, 13 December 2024)
- ML20113H943 + (05:05:13, 13 December 2024)
- ML20113H927 + (05:05:14, 13 December 2024)
- ML20113H922 + (05:05:15, 13 December 2024)
- ML20113H924 + (05:05:15, 13 December 2024)
- ML20113H921 + (05:05:16, 13 December 2024)
- ML20113H914 + (05:05:17, 13 December 2024)
- ML20113H918 + (05:05:17, 13 December 2024)
- ML20113H912 + (05:05:18, 13 December 2024)
- ELV-03715, Forwards Revised Pages to Decommissioning Funding Plan for Vogtle Electric Generating Plant,Units 1 & 2, Per NRC Request.Funding Plan Initially Submitted on 900725.Revs Increase Trust Contribution Amounts from Util + (05:05:19, 13 December 2024)
- HL-2300, Requests Temporary Waiver of Compliance from TS to Permit Exceeding 7-day Allowable Outage Time to Perform Preventative Maint & Mods to EDG 1B by 7 Days.Basis for Waiver & No Significant Hazards Evaluation Encl + (05:05:20, 13 December 2024)
- ML20113H906 + (05:05:20, 13 December 2024)
- ML20113H903 + (05:05:21, 13 December 2024)
- ML20113H890 + (05:05:22, 13 December 2024)
- ML20113H899 + (05:05:22, 13 December 2024)
- ML20113H888 + (05:05:23, 13 December 2024)
- ML20113H885 + (05:05:24, 13 December 2024)
- ML20113H882 + (05:05:24, 13 December 2024)
- ML20113H878 + (05:05:25, 13 December 2024)
- ML20113H875 + (05:05:26, 13 December 2024)
- ML20113H873 + (05:05:27, 13 December 2024)
- ML20113H858 + (05:05:27, 13 December 2024)
- ML20113H840 + (05:05:28, 13 December 2024)
- ML20113H837 + (05:05:29, 13 December 2024)
- ML20113H833 + (05:05:29, 13 December 2024)
- 05000328/LER-1992-009-01, :on 920701,inadvertent CVI Occurred.Caused by High Radiation Alarm Actuated on Train a Containment Purge Radiation Monitor.Operations Responded to Alarm & Verified That High Radiation Condition Did Not Exist + (05:05:31, 13 December 2024)
- ML20113H809 + (05:05:32, 13 December 2024)
- ML20113H800 + (05:05:33, 13 December 2024)
- ML20113H792 + (05:05:34, 13 December 2024)
- 05000293/LER-1992-008, :on 920708,setpoint of Target Rock SRV Found Out of Tolerence.Caused by Inability to Achieve Temp Stabilization During Test Due to Leakage Through Pilot Valve Assembly.Pilot Valve Assembly Reworked + (05:05:36, 13 December 2024)
- ML20113H779 + (05:05:40, 13 December 2024)
- ML20113H760 + (05:05:41, 13 December 2024)
- ML20113H771 + (05:05:41, 13 December 2024)
- ML20113H753 + (05:05:42, 13 December 2024)
- ML20113H740 + (05:05:43, 13 December 2024)
- ML20113H737 + (05:05:44, 13 December 2024)