Text
,o 1
l
.e
{
p#MGW\\
o' 3i UNITED STATES n
i#
3
_i NUCLEAR REGULATORY COMMISSION
- f f
W ABHINGTON. O C. NA6
/
SAFET)lyAllM110B _BY THE OfflCE OF fWCLEAR REACTOR _ _REGULAT10h REL&I[D 10E.4LNDMEf4T NOS. 134 Af1D_113 TO FACILITY OPERATING LLCfJlSE NOS. DPR-70 AND DPR-75 fMDi1LSIRyXE ELECTRIC & GALCPMPAftY
.P.1111 ADELPHI A flECTRIC C0]P_A.J11 DELMARVA POWER AND LIGHT COMPAtu AT_LANTIC_ CITY ELECTJIC COMPANY SLfji NUCLEAR GEHERATlHG STATION. VfMT N05,1 Af4D 2 DACKET NOS. 50-212 AND 00-311 1.O ltiiRODQGil0h By letter dated May G, 1992, tne Public Serv ce Electric 5 Gas Company, Philadelphia Electric Company, Delmarva Power and Light Coepany and Atlantic City Electric Company (the licensees) submitted a request for changes to the Salem Nuclear Generating Statinn, Unit Nos. I and 2, Technical Specifications (T S).
The requested changes would modify Technical Specification 3/4.3.1, Rtactor Trip System Instrumentation, limiting Conditions for Operation, Action Requirements, and Surveillance Requirements, including Associated Tables.
These changes provide consistency between the t.aits, to address various administrative discrepancies, and to ensure technical accuracy.
2.0 fulRLLQn A.
Renumberina of line items Renumbering Limiting Condition for Operation 3.3.1 and Surveillance Requirements 4,3.1.1, 4.3.1.2, 4.3.1.3 as 3.3.1.1, 4.3.1.1.1, 4.3.1.1.2, and 4.3.1.1.3 respectively, for Unit 2 enly, is to be consistent with Salem Unit I and to be more consistent with other specifications in the Salem Unit 2 Instrumentation Chapter, i
Renurrhering of 10 e items within a specification is an administrative i
change, f
- O staff concludes the proposed lechnical Specification changes u a acceptable.
l i-9c 7050226 920729' l
Dh ADOCK 0500 2
, l B.
lahlLLJ-j Modificjltigni 1.
FUNCTIONAL VNITS 7 and 8. Overtemperature AT and Overpower AT.
Remove all references to three loop operation.
Remove item title for four loop operation and align line items as required. (UNITS 1 AND 2)
The current Salem Accident Analysis does not support or permit three loop operation.
Tt's change removes all references to three and four loop operation.
This change removes technical specification items that are not approved for Salem.
This is an administrative change and the staff finds it acceptable.
2.
FUNCTIONAL UNITS 7 and 8, Ove-temperature AT and Overpower AT.
Chango applicable ACTION from 2 to 6. (UNIT 1 ONLY)
Action statements 2 and 6 arc identical except that Action 2 contains an additional suttart "c" that only applies to Power Range Nuclear Instrumenta;1cn. The change ensures the correct actions are addressed and are consistent with Salem Unit 2 and Westinghouse Standard Technical Specifications.
The staff finds this change acceptable.
3.
FUNCTIONAL UNITS 16 and 17 Undervoltage -Reactor Coolant Pumps end Underfrequency - Reactor Coolant Pumps.
Change the MINIMUM CHANNELS OPERABLE requirement from 4 to 3.
(UNITS 1 AND 2)
Action 6 that 1:; applicable to this functional unit, allows for continued operation provided a failed channel is placed ir, the tripped condition within a given time period, and the Minimum Channels Operable requirement is one less than the Total Number of Channels.
Continued operation is not passible because the Minimum Channels Operable requirement is tne same as the Total Number of Channels.
By reducing the Minimum Channels Operable to one less than the Total Number of Channels and tripping the
'noperable channel, the safety function of the system has not been degraded, This change will allow continued operation with one channel inoperable and will bring the-technical specifications for this functional unit into conformance with the Westinghouse Standard Technical Specifications. The staff finds this change acceptable.
4.
FUNCTIONAL UNIT 18, Turbine Trip.
Add designators for line items:
(a.) Low Autostop 011 Pressure and (b.) Turbine Stop Valve Closure.
(UNIT 1 ONLY)
,e t
n The designators being added to the two line items are consistent with other references in Salerr Units 1 and 2 technical specifications and they ensure the functional Units are identiflod properly.
This is an adt.inistrative change and the staff tinds it acceptable.
5.
FUNCTIONAL UNIT 18b, Turbine Trip, Turbine Stop Valve Cicsure.
Change the MINIMUM CHANNE' S OPERABLE requirement from 4 to 3.
(UNil 2 ONLY)
Action 7 that is applicable to this functional unit, allows for continued operation provided a failed channel is placed in the tripped condition within a given time period, and the Minimum c
Channels Operable requirement is satisfied.
Continued operation is not mssible unless the Minimum Channels Operable requirement is at least one less than the Total Number of Channels.
This change will allow continued operation with one channel i* operable and bring the technical specifications for this fur,etional t ait into conformance
^
with the Westinghouse Standard Technical Specifications and the Salem J
Unit I technical specifications.
The staff finds this change acceptable.
6.
TABLE NOTA 110N **.
Delete Notation (UNITS 1 AND 2)
By deleting tne table notation **, this would remove the notation required for three loop operation.
The current Salem Accident Analysis does not support or permit three loop operation.
This change removes technical specification items that are not approved for Salem. The staff finds this change acceptable.
7.
ACTION 20. Add the word POWER after RATLD TliERMAL.
(UNITS 1 AND 2)
This change was appt.ved by amendments 133 and 112 dated June 8,1992, for Salem Units 1 and 2, respectively.
8.
ACTION 3.
Move entire Action to page 3/4 3-6.
(UNIT 1 ONLY)
Action 3 is listed at the end of the page with the associated subparts following on the next page, By moving the entire Action to page 3/4 3-6, this will minimize the potential of not reading the entire action.
This is an administrative cl.ange and the staff finds it acceptable.
9.
ACTION 3.
Add title ACTION 3 to the associated Action.
(UNIT 2 ONLY)
The change to add the title ACTION 3 would correct the typogtaphical error.
This is an administrative change and the staff finds it acceptable, i
1
m
-ef 1
0 10. ACTIONS 3a, 3b, 4a, and 4b. Delete "the" prior to P-6 and "(Block of Source Range Reactor Trip) setpoint" after P-6.
(UNIT 2 ONLY)
The description 4 be bg $ 1eted to provide a more concise action requirement and to provide consistency with Unit 1.
The Reactor Trip system Interlocks are defined at the end of Table 3.3-1.
This is an administrative change and the staff finds it acceptable,
- 11. ACTION 8.
Add ACTION 8 and mark as NOT USED.
(UNITS 1 AND 2)
Action 8 is being added to eliminate the possible confusion of an action number not being addressed.
There are no functional Units that reference Action 8.
This is an administrative change and the staff finds it acceptable.
- 12. ACTION 9.
Delete the current action and mark as NOT USED.
(UNITS 1 AND 2)
Action 9 was applicable for three loop operation.
The current Salem Accident Analysis does not support or permit three loop operation.
There are no functional Units that referenet. Action 9.
This change removes technical specification items that are not approved for Salem.
The staff finds this change acceptabic.
- 13. AC110N 10. Change Deleted to NOT USED.
(UNITS 1 AND 2)
NOT USED provides a more precise description and allows fo-consistency within the technical specifications.
This is an administrative change and the staff finds it acceptable.
C.
TABLE 3.3-2 MODIFICATIONS 1.
FUNCTIONAL UNIT 21. Add functional Unit 21, Reactor Trip Breakers, Not Applicable.
(UNIT 1 ONLY)
This functional Unit was omitted from Table 3.3-2.
The change allows for consistency with the other tables in the specification.
2.
FUNCTIONAL UNIT 22. Add Functional Unit 22, Automatic Trip Logic, Not Applicable.
(UNIT 1 ONLY)
This functional Unit was omitted from Table 3.3-2.
The change allows for consistency with the other tables in the specification.
l These changes to Table 3.3-2, ensures all functional units are acdressed on each table and brings the Unit I table into conformance with the Unit 2 table.
These are administrative changes, and the staff finds the i
changes to the Technical Specifications acceptable.
1
P 1
oc o,
3.0 SJATE CONSULTATION in accordance with the Commission's regulations, the New Jersey State official was notified of the proposed issuance of the amendments.
The State official had no comments.
4.0 ENVIR_0NMENTAL CONSIDERATION The amendments change a requirement with respect to installation or use of a f acility component located within the restricted area as defined in 10 CFR Part 20.
The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation
- exposure, The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (57 FR 24678). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22 environmental assessment need be prepar(b) no environmental impact statement or ed in connection with the issuance of the amendments.
5.0 [310]J)11011 The Commission has concluded, based on the considerations discussed above, that:
(1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such i
activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor:
Denise M. Garcia Date:
July 29,'1992 4,