Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-19893, Final Deficiency Rept DR-177 Re Design,Mfg & Installation of Rockbestos Coaxial & Instrumentation Cable for Neutron Monitoring Sys.Initially Reported on 841109.Cable Lengths in Excess of 500 Ft Designated Acceptable + (04:59:36, 13 December 2024)
- ML20114B265 + (04:59:39, 13 December 2024)
- 05000416/LER-1984-059, :on 841221,reactor Water Cleanup Isolation Occurred Due to Read/Set Toggle Switches a & B of Temp Monitor Being in Read Position.Caused by Malfunctioning Switch.Switch Will Be Repaired + (04:59:40, 13 December 2024)
- ML20114B247 + (04:59:41, 13 December 2024)
- ML20114B242 + (04:59:42, 13 December 2024)
- NLS8500009, Forwards Endorsement 5 to Maelu Certificate M-41 & Nelia Certificate N-41 + (04:59:42, 13 December 2024)
- ML20114B238 + (04:59:43, 13 December 2024)
- 2CAN089210, Forwards Response to NRC 910910 Request for Addl Info Re First 10-yr Inservice Insp Relief Requests,Per 911210 & 920603 Telcons.Under Current Code Rules,Indentification Tag Would Not Cause Exam Limitation + (04:59:44, 13 December 2024)
- ML20114B235 + (04:59:44, 13 December 2024)
- SNRC-1130, Deficiency Rept Re Failure to Install HVAC Penetration Seals to Protect Two Trains of Redundant Safe Shutdown Motor Control Ctrs.Initially Reported on 841129.Sealing of Gaps Completed on 841208 + (04:59:48, 13 December 2024)
- ML20114B216 + (04:59:49, 13 December 2024)
- ML20114B207 + (04:59:50, 13 December 2024)
- ML20114B214 + (04:59:50, 13 December 2024)
- ML20114B205 + (04:59:51, 13 December 2024)
- ML20114B194 + (04:59:52, 13 December 2024)
- 05000346/LER-1984-021, :on 841220,Q-listed & Seismic Class I Ductwork &/Or Ductwork Supports Spanned Bldg Seismic Isolation Boundaries.Caused by Differential Movement Not Factored in Design of Ductwork Sys + (04:59:54, 13 December 2024)
- ML20114B177 + (04:59:55, 13 December 2024)
- ML20114B184 + (04:59:55, 13 December 2024)
- ML20114B172 + (04:59:58, 13 December 2024)
- ML20114B145 + (04:59:59, 13 December 2024)
- ML20114B165 + (04:59:59, 13 December 2024)
- BECO-92-101, Application for Amend to License DPR-35,changing TS 3/4.2 Re HPCI Instrumentation to Support Mod Planned During Refueling Outage 9 of Control Conduit for Several Valves in HPCI Indication in CR Per Reg Guide 1.97 + (05:00:00, 13 December 2024)
- 05000259/LER-1984-038-01, :on 841219,RCIC Turbine Failed to Respond Above 2,100 Rpm.Cause Not Stated.Rcic Ramp Generator & Signal Converter Replaced + (05:00:02, 13 December 2024)
- ML20114B134 + (05:00:03, 13 December 2024)
- ML20114B128 + (05:00:04, 13 December 2024)
- ML20114B127 + (05:00:05, 13 December 2024)
- ML20114B126 + (05:00:06, 13 December 2024)
- ML20114B124 + (05:00:07, 13 December 2024)
- ML20114B121 + (05:00:07, 13 December 2024)
- ML20114B116 + (05:00:08, 13 December 2024)
- ML20114B112 + (05:00:08, 13 December 2024)
- ML20114B099 + (05:00:09, 13 December 2024)
- ML20114B097 + (05:00:10, 13 December 2024)
- ML20114B096 + (05:00:10, 13 December 2024)
- TXX-9237, Interim Deficiency Rept CP-92-08 Re Large Piece of Casting Broken from Seating Area of Lube Oil Pump Suction Check Valve.Initially Reported on 920722.Final Rept Will Be Submitted by 921030 + (05:00:11, 13 December 2024)
- 05000454/LER-1984-033-03, :on 841218,26,30,850102 & 10,gas Monitor Channels on Radiation Monitors OPR34J & OPR33J Went Into High Radiation &/Or Interlock Alarm,Due to Externally Generated Noise.Cause of Noise Unknown + (05:00:13, 13 December 2024)
- 05000346/LER-1992-004, :on 920427,HELB Analysis Error Discovered. Caused by Use of non-conservative Assumptions by Impell Corp in Calculation of post-HELB Environ Qualification.Rept Also Submitted,Per 10CFR21.Calculations Reviewed + (05:00:15, 13 December 2024)
- ML20114B084 + (05:00:16, 13 December 2024)
- ML20114B082 + (05:00:17, 13 December 2024)
- ML20114B080 + (05:00:18, 13 December 2024)
- ML20114B076 + (05:00:19, 13 December 2024)
- 05000498/LER-1992-007, Errata to LER 92-007-00:on 920710,correcting Typo on Page 3 of 920807 Initial Submittal,Revising Cause of Vent to Cause of Event + (05:00:20, 13 December 2024)
- ML20114B069 + (05:00:20, 13 December 2024)
- 05000361/LER-1984-080, :on 841219,when Power Interrupted to Associated Ac Bus During Functional Testing of Battery Charger 2B001, Both Containment Purge Isolation Sys & Fuel Handling Isolation Sys Train a Actuated + (05:00:22, 13 December 2024)
- 05000416/LER-1984-056, :on 841219,RCIC Sys Containment Isolation Valve Closed on High Steam Low Signal.Caused by Spurious High Flow Signal Produced by Pressure Oscillations in Sensing Line. Pressure Equalized in Sensing Lines + (05:00:25, 13 December 2024)
- ML20114B056 + (05:00:27, 13 December 2024)
- ML20114B050 + (05:00:28, 13 December 2024)
- 05000397/LER-1984-128, :on 841221,automatic Start of Control Room Emergency Filtration Sys Occurred When False High Chlorine Signal Generated Due to Tape Depletion.Tape Replaced & Alarm Reset + (05:00:30, 13 December 2024)
- 05000389/LER-1984-015-02, :on 841218,reactor Trip Occurred Due to Low Steam Generator Level.Caused by Poor Suction Strainer Venting Technique + (05:00:32, 13 December 2024)
- 05000454/LER-1984-032-03, :on 841221,fire Penetration W/Four Conduit Pipes Discovered Improperly Sealed.Cause Not Stated. Penetration Sealed & Fire Watch Established + (05:00:34, 13 December 2024)
- ML20114B042 + (05:00:35, 13 December 2024)