A UNITED STATES y

1, NUCLEAR REGULATORY COMMISSION 3

j WASHINGTON, D. C. 20555

%,...../

TOLED0 EDISON COMPANY AND THE CLEVELAND ELECTRIC ILLUMINATING COMPANY DOCKET NO. 50-346 DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.83 License No. NPF-3 1.

The Nuclear Regulatory Commission (the Comission) has found that:

A.

The application for amendment by the Toledo Edison Company and The Cleveland Electric Illuminating Company (the licensees) dated November 12, 1984, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, Facility (Operating License No. NPF-3 is hereby amended by adding paragraph 2.C. 3)(t) to read as follows:

i 8501280667 B50105

~~

PDR ADOCK 05000346 P

PDR L

' Toledo Edison shall operate the Startup Feedwater Pump (SUFP) System with the following operational re-+rictions:

1.

Toledo Edison will station an operator in the Startup Feedwater Pump / Auxiliary Feedwater Pump (SUFP/AFW) area during operation of the SUFP to monitor SUFP/ Turbine Plant Cooling Water (TPCW) pipinp status in the AFW Pump Rooms.

In the event of SUFP/TPCW pipe leakage, the operator will trip the SUFP locally or notify the Control Room to trip the SUFP, and isolate the SUFP/TPCW piping.

2.

Toledo Edison will isolate and maintain isolation outside the SUFP/AFW area of the SUFP suction, discharge, and turbine plant cooling water piping, when the SUFP is not in operation (Modes 1, 2 and 31.

3.

Toledo Edison will install a SUFP, associated piping, and valves, to remove the hazards to the AFW pumps before commencing Cycle 6.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/Gus C. Lainas, Assistant Director

/

for Operating Reactors

/

Division of Licensing Date of Issuance: