Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20114B803 + (04:57:02, 13 December 2024)
- ML20114B801 + (04:57:03, 13 December 2024)
- ML20114B800 + (04:57:04, 13 December 2024)
- ML20114B797 + (04:57:05, 13 December 2024)
- ML20114B799 + (04:57:05, 13 December 2024)
- ML20114B793 + (04:57:06, 13 December 2024)
- 05000382/LER-1992-008-01, :on 920726,inadvertent Esfa Occurred Due to Plant Protection Sys Test Circuit Malfunction.Cause Undetermined.Trouble Shooting Plan Developed to Isolate Specific Components to Resolve Problem + (04:57:08, 13 December 2024)
- ML20114B789 + (04:57:09, 13 December 2024)
- 05000263/LER-1992-009, :on 920728,HPCI Declared Inoperable Due to Concerns That Sys Would Not Perform as Described in FSAR During Atws.Caused by Inadequate Consendate Storage Tank Inventory.Updated FSAR Will Be Revised + (04:57:10, 13 December 2024)
- 05000366/LER-1992-012-01, :on 920727,determined That Requirements of TS Section 4.6.5.1 Not Met for Spent Fuel Shipping Cask Handling Activities.Caused by Misinterpretation of TS Sr. Ltr Issued to Correct TS Interpretation + (04:57:12, 13 December 2024)
- ML20114B784 + (04:57:13, 13 December 2024)
- 05000443/LER-1992-009, :on 920729,determined That 18-month Surveillance Testing Program for Reactor Trip Breakers & Reactor Trip Bypass Breakers Did Not Test Shunt Trip Circuits.Caused by Inadequate Procedure + (04:57:15, 13 December 2024)
- ML20114B781 + (04:57:16, 13 December 2024)
- ML20114B780 + (04:57:17, 13 December 2024)
- ML20114B774 + (04:57:18, 13 December 2024)
- ML20114B776 + (04:57:18, 13 December 2024)
- ML20114B773 + (04:57:19, 13 December 2024)
- ML20114B769 + (04:57:20, 13 December 2024)
- ML20114B765 + (04:57:20, 13 December 2024)
- ML20114B764 + (04:57:22, 13 December 2024)
- ML20114B759 + (04:57:22, 13 December 2024)
- ML20114B758 + (04:57:23, 13 December 2024)
- AECM-85-0018, Forwards Evaluation of RHR Relief Valve Condensation Oscillation Loads on Structures & Piping.Info Demonstrates That All Loads Which Could Be Produced by Actuation of RHR HX Relief Valves Acceptable + (04:57:24, 13 December 2024)
- ML20114B752 + (04:57:25, 13 December 2024)
- ML20114B754 + (04:57:25, 13 December 2024)
- ML20114B751 + (04:57:26, 13 December 2024)
- ML20114B748 + (04:57:27, 13 December 2024)
- ML20114B741 + (04:57:27, 13 December 2024)
- ML20114B736 + (04:57:28, 13 December 2024)
- ML20114B731 + (04:57:29, 13 December 2024)
- ML20114B729 + (04:57:30, 13 December 2024)
- ML20114B728 + (04:57:30, 13 December 2024)
- ML20114B724 + (04:57:31, 13 December 2024)
- ML20114B719 + (04:57:33, 13 December 2024)
- ML20114B720 + (04:57:33, 13 December 2024)
- ML20114B718 + (04:57:34, 13 December 2024)
- A04566, Responds to NRC Re Violations Noted in Insp Rept 50-423/84-20.Corrective Actions:S&W Field QC & QA Personnel Initiated Surveillance Insp to Ensure Compliance W/Welding Electrode Procedure & Welder Involved Terminated + (04:57:35, 13 December 2024)
- ML20114B708 + (04:57:36, 13 December 2024)
- ML20114B707 + (04:57:37, 13 December 2024)
- ML20114B696 + (04:57:38, 13 December 2024)
- 05000389/LER-1984-016-02, :on 841219,turbine/reactor Trip Occurred on Low Vacuum Due to Condensate Pump 2B Recirculation Line Crack. Cause Not Stated.Recirculation Line,Breaker & Reactor Coolant Pressure Seals Replaced + (04:57:39, 13 December 2024)
- ML20114B683 + (04:57:41, 13 December 2024)
- ML20114B682 + (04:57:43, 13 December 2024)
- ML20114B676 + (04:57:43, 13 December 2024)
- ML20114B673 + (04:57:44, 13 December 2024)
- ML20114B661 + (04:57:45, 13 December 2024)
- ML20114B671 + (04:57:45, 13 December 2024)
- ML20114B660 + (04:57:46, 13 December 2024)
- ML20114B659 + (04:57:46, 13 December 2024)
- ML20114B651 + (04:57:47, 13 December 2024)
- ML20114B650 + (04:57:48, 13 December 2024)