Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20115B564 + (04:30:55, 13 December 2024)
- U-602605, Provides Addl Info Re 960222 Proposed Amend LS-94-004 to License NPF-62,revising TS 3.3.4.1, EOC Recirculation Pump Trip Instrumentation, in Response to NRC 960424 RAI + (04:30:56, 13 December 2024)
- ML20115B558 + (04:30:57, 13 December 2024)
- 05000311/LER-1985-002-01, :on 850308,09 & 14 Diesel Generator 2A Failed to Automatically Start & Accelerate During Surveillance Testing.Caused by Overspeed Device Restricting Operation of Fuel Racks.Overspeed Device Repaired + (04:30:58, 13 December 2024)
- ML20115B532 + (04:30:59, 13 December 2024)
- ML20115B527 + (04:31:00, 13 December 2024)
- 05000285/LER-1985-002, :on 850306,unplanned Actuation of Ventilation Isolation Actuation Signal Occurred.Small Reactor Coolant Leak Identified at Suction of Charging Pump B on 850307. Caused by Degraded Weld.Weld Repaired + (04:31:02, 13 December 2024)
- ML20115B503 + (04:31:03, 13 December 2024)
- ML20115B490 + (04:31:04, 13 December 2024)
- ML20115B464 + (04:31:05, 13 December 2024)
- ML20115B454 + (04:31:06, 13 December 2024)
- ML20115B450 + (04:31:06, 13 December 2024)
- ML20115B449 + (04:31:07, 13 December 2024)
- ML20115B443 + (04:31:08, 13 December 2024)
- ML20115B439 + (04:31:09, 13 December 2024)
- ML20115B435 + (04:31:09, 13 December 2024)
- ML20115B428 + (04:31:10, 13 December 2024)
- ML20115B427 + (04:31:11, 13 December 2024)
- ML20115B423 + (04:31:12, 13 December 2024)
- ML20115B422 + (04:31:13, 13 December 2024)
- BSEP-92-0022, Special Rept 1-SR-92-006:on 920904 & 21,secondary Containment Airlock Doors Both Opened to Support Increased Traffic During Outage & Not Restored within 7 Days.Fire Watch Stationed & Remained in Place Until Barrier Restored + (04:31:14, 13 December 2024)
- ML20115B408 + (04:31:14, 13 December 2024)
- BSEP-92-0025, Special Rept 2-SR-92-008:on 920909,crack Found in Thermo-Lag of Penetration Seal in Control Bldg Cable Spread Room During Review of NRC Bulletin 92-001.Seal Not Restored within 7 Days.Fire Watches Stationed in Affected Areas + (04:31:15, 13 December 2024)
- ML20115B388 + (04:31:16, 13 December 2024)
- ML20115B386 + (04:31:16, 13 December 2024)
- ML20115B371 + (04:31:17, 13 December 2024)
- ML20115B359 + (04:31:18, 13 December 2024)
- ML20115B368 + (04:31:18, 13 December 2024)
- ML20115B354 + (04:31:20, 13 December 2024)
- NG-96-1397, Forwards Response to NRC 960531 RAI on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (04:31:20, 13 December 2024)
- ML20115B342 + (04:31:22, 13 December 2024)
- ML20115B328 + (04:31:23, 13 December 2024)
- ML20115B323 + (04:31:24, 13 December 2024)
- ML20115B305 + (04:31:25, 13 December 2024)
- ML20115B292 + (04:31:26, 13 December 2024)
- ML20115B286 + (04:31:27, 13 December 2024)
- ML20115B279 + (04:31:28, 13 December 2024)
- ML20115B275 + (04:31:29, 13 December 2024)
- ML20115B274 + (04:31:30, 13 December 2024)
- ML20115B269 + (04:31:31, 13 December 2024)
- ML20115B267 + (04:31:32, 13 December 2024)
- ML20115B265 + (04:31:33, 13 December 2024)
- ML20115B263 + (04:31:34, 13 December 2024)
- ML20115B259 + (04:31:36, 13 December 2024)
- ML20115B256 + (04:31:37, 13 December 2024)
- ML20115B255 + (04:31:38, 13 December 2024)
- ML20115B253 + (04:31:40, 13 December 2024)
- ML20115B252 + (04:31:41, 13 December 2024)
- ML20115B251 + (04:31:42, 13 December 2024)
- ML20115B243 + (04:31:42, 13 December 2024)
- ML20115B239 + (04:31:43, 13 December 2024)
- 05000382/LER-1996-008-01, :on 960606,loss of Charging Pump Flow Occurred. Caused by B & AB Charging Pump Relief Valves Lifting & Both Pumps Passing Flow Back to Suction of Pumps.Reset Relief Valve Set Point & Repaired Pulsation Dampener + (04:31:45, 13 December 2024)