ML20115B267
| ML20115B267 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 04/01/1985 |
| From: | Adensam E Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20115B272 | List: |
| References | |
| NUDOCS 8504170539 | |
| Download: ML20115B267 (5) | |
Text
/Why$
UNITED STATES C8'
'9
.g NUCLEAR REGULATORY COMMISSION D
- j WASHING TON, D. C. 20555 SOUTH CAROLINA ELECTRIC & GAS COMPANY SOUTH CAROLINA PUBLIC SERVICE AUTHORITY DOCKET N0. 50-395 VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 39 License No NPF-12 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment to the Virgil C. Summer Nuclear Station, Unit No.1 (the facility) Facility Operating License No. NPF-12 filed by the South Carolina Electric & Gas Company acting for itself and South Carolina Public Service Authority (the licensees), dated November 29, 1984, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations as set forth in 10 CFR Chapter I; 8.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission; C.
There is reasonable assurance: (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; E.
The issuance of this license amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable reouirements have been satisfied.
2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachments to this license amendment and paragraph 2.C(2) of Facility Operating License No. NPF-12 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 39 are hereby incorporated into this license.
South Carolina Electric & Gas Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
h
[
l
.O.
'- 2 --
3'
~
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION' gje J. 7L/,
Elinor G. Adensam, Chief.
Licensing Branch No. 4 Division of Licensing
Enclosure:
Technical Specification Changes Date of Issuance: April 1,1985 8
J
- ?L ATTACHMENT ~TO LICENSE AMENDMENT NO. 39 FACILITY OPERATING LICENSE NO. NPF-12 DOCKET NO. 50-395 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains vertical'11nes indicating the areas of change.
The corresponding overleaf page -
is also provided to maintain document completeness.
Amended Overleaf Page Page 3/4.3-18 3/4' 3-17 F
Y r
?. %[
EE TABLE 3.3-3 (Continued) 3 E
' ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION C
25 MINIMUM
~#
TOTAL NO.
CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT 0F CHANNELS TO TRIP OPERABLE MODES ACTION f.
. Steam Line Pressure-Low 1 pressure /
1 pressure 1 pressure 1, 2, 3 19*
loop and 2 loops and 2 loops j
2.
REACTOR BUILDING SPRAY a.
Manual 2 sets - 2 1 set 2 sets 1, 2, 3, 4 18 switches / set Ni b.
Automatic Actuation 2
1 2
1,2,3,4 14
[
Logic and Actuation 4
s, Relays u
c.
Reactor Building 4
2 3
1,2,3 16 Pressure--High-3 (Phase 'A' isolation aligns spray system discharge valves and NaOH tank suction valves) 9 e
6
c.
~
7f TABLE 3.3-3 (Continued).
E ENGINEERED SAFETY FEATURE-ACTUATION SYSTEM INSTRUMENTATION-
.m
~
c MINIMUM TOTAL NO.
CHANNELS' CHANNELS APPLICABLE
~
FUNCTIONAL ONIT OF CHANNELS TO TRIP OPERABLE MODES ACTION-3.
CONTAINMENT ISOLATION
~
a.
Phase "A" Isolation 1)Jr Manual.
2 1
I 2
1,2,3,4 18 2)
Safety Injection See'l above for all safety injection initiating functions and requirements.
- 3). Automatic Actuation
' Logic and Actuation-4 2 1
2 1,2,3,4 14 Relays b.
Phase "B" Isolation zu O
1)
Automatic Actuation 2
1 2
1,2,3,4 14 Logic'and Actuation
-Relays
(
2)
Reactor-Building 4-2 3
1,-2, 3 16 i
Pressure--High-3 l
j c.
Purge and Exhaust
~
Isolation f
1)
Safety Injection See 1 above for all' safety injection initiating functions and requirements, i
g 2)
Containment Radio-2*
1 2"
1, 2, 3,'4-17 activity-High-e E
3)
Automatic Actuation 2
1 2
1,2,3,4-17 Logic and Actuation l
5 Relays
.z P
- Purge exhaust-monitor not required when purge exhaust is' closed.
is
-__