Monthly Operating Rept for Sept 1992 for MNGP
ML20115B292
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 09/30/1992
From: Parker T, Paustian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9210150382
Download: ML20115B292 (5)


Text

,

Northem States Power _Oompr.ny.

414 tRollet Mali Minneapolis, Minnesota 55401 1927 Telephone (612) 330-5500 October 12, 1992 Monticello Technical Specifications Section 6.7.A,3 US Nuclear Regulatory Commission Atto: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PIMIT Docket No. 50-263 Licenst Nn. DPR-22 l

Monthly Operating Report September 1991 Attached is the MontL v Operating Report for September 1992 for the Monticello Nuclear Generating "'

ac pc GAsk 15 ~

Ip u homas M Parker i

f Manager l-Neclear Support Service TMP/mkl C:

Director, Office of Resource Management

-Regional Administrator-III, NRC NR". Proj ect Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment h

L-i R'

L/

l

OPERATING DATA REPORT DOCKET NO.

50-263 DATE 10- 1-92 CCMPLETED BY H. H. Pa'1stian TELEPHONE 612/295-5151 OPERATING STATUS

] Notes

)

1. Unit Name :

Monticello

)

]

2. Reporting period:

September

]

]

3. Lic nsed Thermal Poster (telt ) :

.1670

)

)

4. Nameplate Rating ( Gros s M'.Je ).

569 1

)

5. Design Electrical Rat.ing (Nee MWe):

545.4

)

]

6. Maximum Dependable Capacity (Gross MWe):

._.5 6 4

)

)

7. Max mum Dependable Capacity (Net MWe):

536

)

)

8.

If Changes Occur in Capacity Ratinos (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, IfJuy (Net MWe)-

N / A_

10. Reasons For Restrictions, If Any: _N/A i

e THIS MONTH YR.-TO-DATE CUMULATIVE

11. Hours In Reporting Period 720 6575 186312
12. Number Of Hours Reactor Was Criti. cal 720.0 6357.3 149775.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
14. Hours Generator on-Line 720.0 6319.3 117067.2
15. Unit Reserve Shutdcwn Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1200307 10488347 226021924
17. Gross Electrical Energy Generaced (MWH) 402530 3511213 76401058
18. Net Electrical Energy Generated (MWH) 387329 3369301 73071519
19. Unit Service Factor 100.0%

96.1%

78.9%

20. Unit Availability Fa. tor 130.0%

96.1%

78.9%

21. Unit Capacity Factor (Using MDC Net) 10C.4%

95.6%

73.2%

22. Unit Capacity Factor (Using DER Net) 98.6%

94.0%

71.9%

23. Unit Forced Outage Rate 0.0%

1.1%

3.8%

3

24. Shutdowns Scheduled Over Next 12 Months ( Typ e, Date, and Duration of Each)
Refueling Ourage - 1/27/93 - 56 days
25. If Shut Down At I'nd Of Report Period, Estimated Date Of Startup:1.*/A 26, Units In Test Status (Prior to Commercial Operation)

N/A Ferecast Achieved INITIAL CRITIC /sLITY INITIAL ELECTRICITY COMMERCIAL OPERATION l

- - - - - - - - - - - - - - - ~ - - -

b-AVERAGE DAILY UNIT POWER LEVEL'.-

ic I

f

[.-

W '7.ET NO. 263 UNI 7'.Monticello_.

' ~

SATE :10--1 -

COMiLETED BY-H. H.

Panstian-TELEPHONE. 612/295-5151 MONTH-OF September

.' DAY

. AVERAGE DAILY P0WEF LEVEL DAY-AVPRAGE= DAILY' POWER LEVEL (MWe-Net)

(MWe-Net).

11 536.

17 536',

2 5 3 7. ____.

18.

339.

3 536.

19 539'.

4

_S36, 20 533.

- 5..

._ 537.

21' 537.

[

6 537.

22

_540.

538, 23

-539.

7 8-539.

24 539.

9 536.

25 541.

10

540, 26 539.__

21 542.

27 539.

12'
535, 28 539.

13 521.

29 543.

-14 551.

30

'541.

15 538.

16' 536.

t L

INSTRUCTIONS

On this format, list the average daily unit power level in MWe-Net for each

.,'~

' day in the reporting month.

Compute to the nearest whole' megawatt.

4 9

1

>- - =

.m

.nsee.

im.

we-m,.

- we e.,*:

y

-s-y~t e4-ge-w -

e-y iw o

r-

-t

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE

-4 DOCKET NO.

50-263 DATE 10- 1-92 COMPLETED BY H.

H.

Paustian TELEPHONE 612/295-5151 Mot 1TH SEP-9-1-92 to Power operation.

9-30-92 C

Note: Power operation defined as essentially '.00% of rated power except for weekend load drops for

- specified surveillance testir,g.

l

x UNIT SHIHDO*2iS AND POUER REDUCTIONS D3CKET No. 50-263 LE4IT NAME l onticL5Tio DATE 5 0-01-92 COMPLETED BY 1. H. Paustian REPORT M0fCH _ September _

TELEPHONr_612/295-5151 -

Duration Reason Method LER 57 stem Comp.

Cause & Corrective Ty(pe (hours; (2) of No.

Code Code Action to No.

Inte 1)

Shutdown (4)

(5)

Prevent Recurrence (3)

None l

i l

l

'l i

1

\\

I 1

2 3

4 F: Forced Reason:

Method:

Draft IEEE Standard i

S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-DS) l B-Maintenance or Test 2-Manual Scram l

C-Refueling 3-Automatic Scram 5

l D-Regulator Restriction 4-Other (Explain)

IEEE Standard 803A-1983 E-09erator Training & License Examination F-Allministrative G-Operational Error (Explain)

H-Other (Explain) l I

1

,