10 CFR 50, APPENDIX E 1*lilLAI) Ell'Illi ELECTRIC COMI%NY NUCLEAR GROUP HEADQUARTERS 955-65 CllESTERDROOK Bl.VD.
WAYNE, PA 19087-5691 (215) M O.(A o October 1, 1992 NUCL1 AR $1.RVICILS DEF'ARIMI NT DoChet Noa. 50-352 50-353 50-277 50-278 License Nos. NPF-39 NPF-85 DRR-44 DRR-56 U.S.
Nuclear Regulatory Commission Attn Document Control Desk Washington, DC 20555
Subject:
Limerick Generating Station, Units 1 and 2 Peach Bottom Atomic Power Station, Units 2 and 3 Common Emergency Response Procedures Initial Submittal and Revision
Dear Sir:
Enclosed is Revision No. O of the Emergency Response Procedures -
Common ( ERP-C) for Limerick Generating Station (LGS), Units 1 and 2 and Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3.
These procedures should have been submitted within 30 days of their
(
publication date of April 3, 1992.
Ilowever, as a result of tSt major restructuring and reorganization which took place with the completion of our Common Emergency Operations Facility (EOF), the procedures were not submitted within the required time.
The following procedures comprise Revision No.
O.
ERP-C Index, Rev.
O.
ERP-C-1000, Rev. 0
" Emergency Operations Facility (EOF)
Activation / Deactivation.
ERP-C-1100, Rev. 0
" EOF Staff Augmentation."
ERP-C-1200, Rev. 0
" Emergency Response Manager."
ERP-C-1210, Rev. 0
" Assistant Emergency Response Manager (AERM)."
ERP-C-1250, Rev. 0
" Emergency Preparedness Coordinator /
EOF."
ERP-C-1300, Rev. 0
" Emergency Operations Facility (EOF) l Dose Assessment Team Leader."
ERP-C-1310, Rev. 0
" Emergency Operations Facility (EOF)
Dose Assessment Group."
ERP-C-1320, Rev. 0
" Emergency Operations Facility (EOF)
Field Survey group Leader."
+
9210160141 921001 fDR ADOCK 05000277 b6/.
f A+I a
eMe Rg l $$
U.S. Nuclear Regulatory Commission October 1, 1992 Document Control Desk Pago 2 ERP-C-1400, Rev. 0
" Engineering Support Team."
ERP-C-1410, Rov. 0 "Coro Damage Assessment."
ERP-C-1500, Rev. 0
" Logistic Support Toam."
ERP-C-1900, Rev. 0
" Recovery Phase Implementat. ion."
We request that three of those proceduros be withhold from public disclosure in accordance with 10 CFR 2.790(a)(6).
They contain names and telephone
- numbers, and disclosure of this information would constitute an unwarranted invasion of the personal privacy of the individuals involved.
The following throo proceduros should be withhold from public discloauro.
ERP-C-1100, Rev. 0
" EOF Staff Augmentation."
ERP-C-1300, Rev. 0
" Emergency Operations Facility (EOF)
Dose Assessment Team Loader."
ERP-C-1310, Rev. 0 "Energency Operations Facility (EOF)
Dose Assessment Group."
Also bo'ng submitted with Revision No. O of thoso common proceduros is Revision No. 1 of a selection of the same prncodures.
The onclosed Revision No. 1 procedures are also being submitt i subsequent to the 30 day submittal period following the revision dai'
. July 23, 1992 for the same reason explained above.
The following procedure revisions compriso.9evision No.
1.
ERP-C-Index, Rev. 1.
ERP-C-1100, Rev. 1
" EOF Staff Augmentation."
We also request that proceduro ERP-C-1100, Rev. 1 identiflod above be withhold from public disclosure in accordance with 10 CFR 2.790(a)(6) since this proceduro contains names and tolophone
- numbers, and disclosure of this information would constituto an unwarranted invasion of the personal privacy of the individuals involved.
If you have any questions or require additional information, please do not hesitato to contact us.
Very truly yours, j'
(V G.
J. Beck, Manager Licensing Section Enclosures cc:
T.
T.
- Martin, Administrator, Region I,
USNRC (2
copios of enclosures)
T. J. Kenny, USNRC Senior Resident Inspector, LGS (w/ enclosuros)
(