Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116G930 + (03:29:04, 13 December 2024)
- ML20116G928 + (03:29:04, 13 December 2024)
- ML20116G927 + (03:29:05, 13 December 2024)
- ML20116G915 + (03:29:06, 13 December 2024)
- ML20116G918 + (03:29:06, 13 December 2024)
- RC-96-0186, Clarifies Info Provided to NRC in Util Ltr Re Response to Question 1.d of NRC RAI .Response to RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, Encl + (03:29:07, 13 December 2024)
- ML20116G910 + (03:29:07, 13 December 2024)
- ML20116G900 + (03:29:08, 13 December 2024)
- ML20116G895 + (03:29:10, 13 December 2024)
- ML20116G891 + (03:29:11, 13 December 2024)
- BVY-92-126, Monthly Operating Rept for Oct 1992 for Vermont Yankee Nuclear Power Station + (03:29:12, 13 December 2024)
- ML20116G887 + (03:29:12, 13 December 2024)
- ML20116G881 + (03:29:13, 13 December 2024)
- 05000339/LER-1984-011, :on 841019,20,22,1102,1203,07,11 & 850113, Emergency Diesel Generator 2H Tripped.Cause Under Investigation.Tech Spec Change Requested to Test Generators in Manner More Consistent W/Mfg Recommendation + (03:29:15, 13 December 2024)
- ML20116G877 + (03:29:19, 13 December 2024)
- ELV-04052, Application for Amends to Licenses NPF-68 & NPF-81,revising Tech Spec 5.3.1 to Permit Limited Substitution of Zirconium Alloy or Stainless Steel Filler Rods for Fuel Rods Per NRC Approved Applications + (03:29:20, 13 December 2024)
- ML20116G875 + (03:29:20, 13 December 2024)
- ML20116G865 + (03:29:21, 13 December 2024)
- 05000498/LER-1992-015, :on 921003,discovered That Unplanned ESF Actuation of Component Cooling Water Pump Due to Operator Inattention.Involved Operations Personnel Have Been Counseled by Management + (03:29:23, 13 December 2024)
- ML20116G855 + (03:29:24, 13 December 2024)
- NG-92-4520, Forwards Changes to Rev 13 to QA Program Description, Incorporating Changes Submitted by Util & Listed Changes for NRC Review + (03:29:24, 13 December 2024)
- ML20116G852 + (03:29:25, 13 December 2024)
- ML20116G841 + (03:29:26, 13 December 2024)
- 05000267/LER-1985-006, :on 850319,discrepancies Discovered Between Submittal Date & Event Date Re Maint Work That Disturbed Fire Retardant Matl in Barrier Penetration Seals.Caused by Inadequate Procedures.Procedures Modified + (03:29:28, 13 December 2024)
- ML20116G835 + (03:29:29, 13 December 2024)
- ML20116G834 + (03:29:30, 13 December 2024)
- ML20116G811 + (03:29:33, 13 December 2024)
- U-602617, Responds to RAI Re GL 95-07, Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves + (03:29:33, 13 December 2024)
- ML20116G793 + (03:29:34, 13 December 2024)
- RBG-20698, Revised Final Deficiency Rept DR-182 Re Limitorque Corp Motor Operator Failure on Feedwater Isolation Valve. Operator Returned to Vendor & All Damaged Parts Replaced. Vendor Tested Operator to Insure Proper Operation + (03:29:34, 13 December 2024)
- TXX-4460, Final Significant Deficiency Rept SDAR-176 Re Equipment Hatch Cover in Reactor Containment Bldg W/Attachments Bearing Against I Beams When Positioning Cover.Item Not Reportable Per 10CFR50.55(e) + (03:29:35, 13 December 2024)
- ML20116G777 + (03:29:36, 13 December 2024)
- ML20116G779 + (03:29:36, 13 December 2024)
- RBG-20695, Final Deficiency Rept DR-289 Re Misconnected Voltage Regulator Wires on HPCS Diesel Generator Supplied by Ge. Initially Reported on 850306.Voltage Regulator Wires Reterminated & HPCS Diesel Generator Revised + (03:29:37, 13 December 2024)
- RBG-20711, Interim Deficiency Rept DR-242 Re Fracture of Pinion Gear in Limitorque Motor Operator of RHR Sys safety-related Valve.Interim or Final Rept Will Be Provided by 850515 + (03:29:38, 13 December 2024)
- ML20116G745 + (03:29:38, 13 December 2024)
- 05000282/LER-1992-014-02, :on 921007,CR Responded to Fire Alarm in Area of MSSV Header for Number 12 Sg.Caused by Personnel Error. All Valves Adjusted to Nominal Setpoint + (03:29:40, 13 December 2024)
- 05000373/LER-1996-008-05, :on 960628,foreign Matl Injected Into SW Tunnel Caused Dual Unit Shutdown Due to Inadequate Work Control. Floor & Wall Repair Work in Lake Screen House Was Stopped + (03:29:42, 13 December 2024)
- 0CAN079605, Submits Proposed Change to ANO QA Manual Operations.Change Will Change Audit Frequencies.Nrc Approval Requested Prior to Implementation + (03:29:43, 13 December 2024)
- ML20116G710 + (03:29:44, 13 December 2024)
- ML20116G706 + (03:29:45, 13 December 2024)
- 05000440/LER-1992-019, :on 921009,valve Positioning Error Resulted in Inoperability of Both SLCS Trains.Caused by Personnel Error. Operator Responsible for Valve Positioning Error Counseled Re Event + (03:29:46, 13 December 2024)
- ML20116G691 + (03:29:47, 13 December 2024)
- ML20116G688 + (03:29:49, 13 December 2024)
- ML20116G683 + (03:29:50, 13 December 2024)
- ML20116G671 + (03:29:51, 13 December 2024)
- ML20116G670 + (03:29:51, 13 December 2024)
- ML20116G662 + (03:29:52, 13 December 2024)
- ML20116G658 + (03:29:53, 13 December 2024)
- 05000456/LER-1992-011-06, :on 921007,inadequate Testing Frequency for Afp Start on RCP Bus Undervoltage.Caused by Procedural Deficiency.Instrument Slave Relay Surveillances Increased from Quarterly to Monthly Per TS 4.3.2.1 + (03:29:55, 13 December 2024)
- ML20116G648 + (03:29:56, 13 December 2024)
- NRC-96-0087, Provides Response to NRC 960628 Request for Util to Confirm Commitment to Resolve Fuel pool-related Issues Re DER 95-1021,96-0235 & 96-0306.Resolution in Progress + (03:29:57, 13 December 2024)